Ewsf Inc.
- Based in
- San Francisco
- On San Francisco permits
- Nov 2007 to Sep 2026
- Last 24 months
- 15 permits filed
148 permits since 2000: 118 completed, 4 in progress, 16 never finaled, 10 expired or cancelled.
Of the 16 never-finaled permits, 4 are 3 to 5 years old, 9 are 5 to 10 years old, 3 are over 10 years old. 5 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 148.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 30, 2026 | In progress issued Oct 2026 | 150 Valencia St | non-structural demo on 1st & 2nd fl, construct 5 new restrooms on 1st & 2nd fl. upgrade existing front door, replacement in kind. no change of use. no sidewalk work.Details
non-structural demo on 1st & 2nd fl, construct 5 new restrooms on 1st & 2nd fl. upgrade existing front door, replacement in kind. no change of use. no sidewalk work. | $188,200 |
| Aug 6, 2026 | Completed final sign-off Sep 2026 | 3533 Sacramento St | to comply with physical inspection report # cc-8764. smoke detectors door seals verification.Details
to comply with physical inspection report # cc-8764. smoke detectors door seals verification. | |
| Jun 23, 2026 | In progress filed Jun 2026, not yet issued | 101 Utah St | removal of 8358 sqft on 2nd floor, relocation of brace frames. no change of use, interior work only.Details
removal of 8358 sqft on 2nd floor, relocation of brace frames. no change of use, interior work only. | $20,000 |
| May 6, 2026 | Completed final sign-off Jun 2026 | 77 Federal St | 1/f and basement: revision to 202602035133. add (1) office room, (2) phone room and (1) idf room on level 1. new soffit and (2) closets at break area l1. bottle filler devices added to break area 4 and basement.Details
1/f and basement: revision to 202602035133. add (1) office room, (2) phone room and (1) idf room on level 1. new soffit and (2) closets at break area l1. bottle filler devices added to break area 4 and basement. | $6,000 |
| Mar 13, 2026 | Completed final sign-off Mar 2026 | 350 11th St | floor 2, 3, 4 offices: deferred mechanical modification to permit 202411134880.Details
floor 2, 3, 4 offices: deferred mechanical modification to permit 202411134880. | $3,000 |
| Mar 3, 2026 | Completed final sign-off Mar 2026 | 637 Natoma St | to obtain final inspection for work approved under pa #2023-0725-2924. all work is complete.Details
to obtain final inspection for work approved under pa #2023-0725-2924. all work is complete. | |
| Feb 25, 2026 | Completed final sign-off Mar 2026 | 3533 Sacramento St | to verify that this is a 2 units building. for record purpose- ref pa #202106142333 no work under current permit. (for record only)Details
to verify that this is a 2 units building. for record purpose- ref pa #202106142333 no work under current permit. (for record only) | |
| Feb 3, 2026 | Completed final sign-off Jun 2026 | 77 Federal St | 1st fl & basement improvement: new non structural walls & partitions. new interior finishes, two new bathrooms, one new mother's room with sink, two new sink counters. mep modification. change of use from retail space (gym) to business service b. no exterior, structural or demo work.Details
1st fl & basement improvement: new non structural walls & partitions. new interior finishes, two new bathrooms, one new mother's room with sink, two new sink counters. mep modification. change of use from retail space (gym) to business service b. no exterior, structural or demo work. | $300,000 |
| Sep 22, 2025 | Completed final sign-off Mar 2026 | 1500 16th St | revision to pa #202506269545: 4 storage rooms removed in unit #101. 1st floor restroom layout changed: one sink counter added; unit 201: restroom layout changed. no exterior work, no change of use, no sidewalk work, and no structural work. fire sprinkler/fa under separate permit.Details
revision to pa #202506269545: 4 storage rooms removed in unit #101. 1st floor restroom layout changed: one sink counter added; unit 201: restroom layout changed. no exterior work, no change of use, no sidewalk work, and no structural work. fire sprinkler/fa under separate permit. | $12,000 |
| Aug 1, 2025 | Completed final sign-off Mar 2026 | 1500 16th St | revision to previously approved pa 202506269545 to include: voluntary underpinning of foundation at existing wall at new entry landings (3 locations).Details
revision to previously approved pa 202506269545 to include: voluntary underpinning of foundation at existing wall at new entry landings (3 locations). | $6,000 |
| Jun 26, 2025 | Completed final sign-off Mar 2026 | 1500 16th St | 1500 16th st was gym, now change of use as #201/2nd fl to business services. 1st/f #101 to be whole sale . 1st fl/#102,103,104,105,106,107 to be whole sale. demo e) wall & partitions. construct n) walls,partitions,ada ramps, restrooms,skylights. replace exterior windows & storefronts.n)lights/panelsDetails
1500 16th st was gym, now change of use as #201/2nd fl to business services. 1st/f #101 to be whole sale . 1st fl/#102,103,104,105,106,107 to be whole sale. demo e) wall & partitions. construct n) walls,partitions,ada ramps, restrooms,skylights. replace exterior windows & storefronts.n)lights/panels | $320,000 |
| Jun 24, 2025 | Completed final sign-off Aug 2025 | 77 Federal St | new wood grille ceiling 17" x 16"-1" to be installed at lobby. no mep work. no demo. no structural workDetails
new wood grille ceiling 17" x 16"-1" to be installed at lobby. no mep work. no demo. no structural work | $3,500 |
| May 20, 2025 | Completed final sign-off Mar 2026 | 1500 16th St | exploratory work to determine approx. fifteen footings' size/depth/location. all holes to be filled back with slurry. no structural work.Details
exploratory work to determine approx. fifteen footings' size/depth/location. all holes to be filled back with slurry. no structural work. | $3,000 |
| Mar 31, 2025 | Completed final sign-off Aug 2025 | 77 Federal St | floor 4 and 5: office t.i (10,524 sf) each floor. demo of (e) non-bearing partition walls, new walls for meeting room and offices, new finishes (flooring, ceiling, lighting). modify mechanical and electrical design based on new layout. t-24 compliance. no plumbing. no change of use.Details
floor 4 and 5: office t.i (10,524 sf) each floor. demo of (e) non-bearing partition walls, new walls for meeting room and offices, new finishes (flooring, ceiling, lighting). modify mechanical and electrical design based on new layout. t-24 compliance. no plumbing. no change of use. | $420,000 |
| Jan 9, 2025 | In progress issued Jan 2025 | 101 Utah St | vacant, no tenants currently. we will perform exploratory work to determine footing size, and depth. all holes to be filled back w/ slurry. no structural work.Details
vacant, no tenants currently. we will perform exploratory work to determine footing size, and depth. all holes to be filled back w/ slurry. no structural work. | $3,000 |
| May 7, 2024 | Completed final sign-off Dec 2024 | 77 Federal St | demolision of non bearing walls, construct new office and conference rooms. install new carpet, ceiling and light fixtures. modify mechanical/elc based on new layout. title 24 complianceDetails
demolision of non bearing walls, construct new office and conference rooms. install new carpet, ceiling and light fixtures. modify mechanical/elc based on new layout. title 24 compliance | $424,000 |
| Mar 19, 2024 | Completed final sign-off May 2024 | 2299 Alameda St | revision to 20240114109, 202403077355: adding structural calculations and details . moving doorwayDetails
revision to 20240114109, 202403077355: adding structural calculations and details . moving doorway | |
| Mar 8, 2024 | Expired or cancelled cancelled Jul 2025 | 150 Valencia St | bldg at 150 valencia is currently vacant. no tenants. we will perform exploratory work to determine the size/depth/footprint/thickness of the existing footings. holes will be filled with slurry. no work on walls. no layout changes. no wall demo. no structural work involved. 2'x2'x approx 2' deep.Details
bldg at 150 valencia is currently vacant. no tenants. we will perform exploratory work to determine the size/depth/footprint/thickness of the existing footings. holes will be filled with slurry. no work on walls. no layout changes. no wall demo. no structural work involved. 2'x2'x approx 2' deep. | $3,000 |
| Mar 7, 2024 | Completed final sign-off May 2024 | 2299 Alameda St | revision to pa 202401174109 build non bearing partition walls; add electrical outlets in partition walls; install new sub panel (electrical)Details
revision to pa 202401174109 build non bearing partition walls; add electrical outlets in partition walls; install new sub panel (electrical) | $1,000 |
| Jan 17, 2024 | Completed final sign-off May 2024 | 2299 Alameda St | combine 2 tenant spaces into 1. relocate (e) egress stairs/ relocate door. to comply w/ bid complaint#202417815.Details
combine 2 tenant spaces into 1. relocate (e) egress stairs/ relocate door. to comply w/ bid complaint#202417815. | $20,000 |
| Nov 10, 2023 | Completed final sign-off Dec 2023 | 3535 Sacramento St | this is an administrtive permit for special inspection and structral observation purposes only. original pa# 202106142333Details
this is an administrtive permit for special inspection and structral observation purposes only. original pa# 202106142333 | |
| Nov 9, 2023 | Completed final sign-off Dec 2023 | 3535 Sacramento St | replace 10 windows rear side of house non street facing. same size same location. u=0.3maxDetails
replace 10 windows rear side of house non street facing. same size same location. u=0.3max | $15,000 |
| Oct 13, 2023 | In progress issued Oct 2023 | 838 Market St | retail/ office bldg is vacant, perform exploratory work to determine the depth / footprint/ thickness of (e) footing, scan foundation for (e) reinforcement for floor and wall for sample test, coring steel for sample/ test no struct work performDetails
retail/ office bldg is vacant, perform exploratory work to determine the depth / footprint/ thickness of (e) footing, scan foundation for (e) reinforcement for floor and wall for sample test, coring steel for sample/ test no struct work perform | $7,500 |
| Aug 3, 2023 | Never finaled issued Aug 2023, no final | 314 West Portal Av | add 3 rooms. move kitchen. replace t-bar ceiling. insulate roof. extend mechanical ducts.Details
add 3 rooms. move kitchen. replace t-bar ceiling. insulate roof. extend mechanical ducts. | $40,000 |
| Sep 29, 2022 | Completed final sign-off Dec 2023 | 3535 Sacramento St | revisions to 202106142333: add lap siding. correct building outline. dry rot repair in kind.Details
revisions to 202106142333: add lap siding. correct building outline. dry rot repair in kind. | $5,000 |
| Aug 4, 2022 | Expired or cancelled cancelled Jan 2026 | 838 Market St | demo partition, stairs, elevators, install ada stairs, elevators, and new roofDetails
demo partition, stairs, elevators, install ada stairs, elevators, and new roof | $170,000 |
| Jun 16, 2022 | Never finaled filed Jun 2022, never issued | 474 Bryant St | storm water piping only. joint compliance approach btwn 474 bryant st & 77 stillman st to comply w/sf stormwater mangement ord. stormwater from 77 stillman roof will be treated in a flow through planter located on lower roof of 474 bryant, & treated stormwater will be drained back to 77 stillman andDetails
storm water piping only. joint compliance approach btwn 474 bryant st & 77 stillman st to comply w/sf stormwater mangement ord. stormwater from 77 stillman roof will be treated in a flow through planter located on lower roof of 474 bryant, & treated stormwater will be drained back to 77 stillman and | |
| Jun 9, 2022 | Never finaled issued Jun 2022, no final | 58 Dorland St | recommencement and completion of work approved under pa# 201902132828Details
recommencement and completion of work approved under pa# 201902132828 | $5,800 |
| Mar 11, 2022 | Expired or cancelled cancelled Jan 2026 | 838 Market St | flr 3,4,5: demolish of (e) interior partitions (office). refinish of (e) walls for future office tenant. no work on retail floors b,1,2. no exterior work.Details
flr 3,4,5: demolish of (e) interior partitions (office). refinish of (e) walls for future office tenant. no work on retail floors b,1,2. no exterior work. | $1,000 |
| Mar 11, 2022 | Expired or cancelled cancelled Jan 2026 | 842 Market St | flr 3,4,5: demolish of (e) interior partitions (office). refinish of (e) walls for future office tenant. no work on retail floors b,1,2. no exterior work.Details
flr 3,4,5: demolish of (e) interior partitions (office). refinish of (e) walls for future office tenant. no work on retail floors b,1,2. no exterior work. | $1,000 |
| Nov 9, 2021 | Never finaled issued Dec 2021, no final | 707 Harrison St | stormwater control plan check by pid main building permit # 201912068918 please send ¿project review complete¿ email to sfpuc and project team (vincent@aralonproperties.com) once the review is finishedDetails
stormwater control plan check by pid main building permit # 201912068918 please send ¿project review complete¿ email to sfpuc and project team (vincent@aralonproperties.com) once the review is finished | |
| Nov 2, 2021 | Completed final sign-off Dec 2023 | 3527 Sacramento St | grouting of foundation between 3527-29 sacrament & 3535 sacramento st. ref pa #202106142333 (voluntary seismic upgrade of 3535 sacramento st)Details
grouting of foundation between 3527-29 sacrament & 3535 sacramento st. ref pa #202106142333 (voluntary seismic upgrade of 3535 sacramento st) | $8,500 |
| Aug 3, 2021 | Never finaled filed Aug 2021, never issued | 77 Stillman St | to erect 8 stories, type 1b, office & pdr/light manufacture.Details
to erect 8 stories, type 1b, office & pdr/light manufacture. | $9,280,000 |
| Aug 3, 2021 | Completed final sign-off Aug 2021 | 312 West Portal Av | revision 202101263275 move bathroom, add sheetock to scope, add kitchen cabinet, add plywood, add roomsDetails
revision 202101263275 move bathroom, add sheetock to scope, add kitchen cabinet, add plywood, add rooms | $10,000 |
| Aug 3, 2021 | Never finaled filed Aug 2021, never issued | 474 Bryant St | to erect 8 stories, type 1b, office & pdr/light manufacture.Details
to erect 8 stories, type 1b, office & pdr/light manufacture. | $9,280,000 |
| Aug 2, 2021 | Never finaled filed Aug 2021, never issued | 474 Bryant St | demolition of a type 5 2 story pdrDetails
demolition of a type 5 2 story pdr | $112,200 |
| Aug 2, 2021 | Never finaled filed Aug 2021, never issued | 482 Bryant St | demolition of a type 5 2 story pdrDetails
demolition of a type 5 2 story pdr | $19,800 |
| Jun 14, 2021 | Completed final sign-off Dec 2023 | 3533 Sacramento St | voluntary seismic upgrade. interior remodel, demo of less than 75% of interior walls, replace windows @ rear.Details
voluntary seismic upgrade. interior remodel, demo of less than 75% of interior walls, replace windows @ rear. | $738,000 |
| Jan 26, 2021 | Completed final sign-off Aug 2021 | 312 West Portal Av | lighting upgrade. bathroom relocation & upgrade to meet disabled access 20% rule.Details
lighting upgrade. bathroom relocation & upgrade to meet disabled access 20% rule. | $30,000 |
| Mar 4, 2020 | Completed final sign-off Oct 2021 | 77 Federal St | elevator hoistway access panel. revision to pa# 201306200082Details
elevator hoistway access panel. revision to pa# 201306200082 | $500 |
| Mar 4, 2020 | Completed final sign-off Jun 2020 | 540 De Haro St | elevator hoistway access panel. revision to 201502107867Details
elevator hoistway access panel. revision to 201502107867 | $500 |
| Dec 6, 2019 | Never finaled issued Apr 2021, no final | 400 03rd St | to erect 7 stories, no basement, type ii-a, mix used office/retail, commercial building. ** maher compliance with ord #155-13; route to dph **Details
to erect 7 stories, no basement, type ii-a, mix used office/retail, commercial building. ** maher compliance with ord #155-13; route to dph ** | $10,000,000 |
| Sep 26, 2019 | Completed final sign-off Jul 2020 | 77 Federal St | to install tower crane foundations. to erect and operate tower crane. ref pa 2019-0926-2809Details
to install tower crane foundations. to erect and operate tower crane. ref pa 2019-0926-2809 | $20,000 |
| Sep 26, 2019 | Completed final sign-off Jul 2020 | 75 Federal St | to install tower crane foundations. to erect and operate tower craneDetails
to install tower crane foundations. to erect and operate tower crane | $20,000 |
| Jul 30, 2019 | Completed final sign-off Sep 2021 | 77 Federal St | stormwater control plan check by pid main project appln #201306200082Details
stormwater control plan check by pid main project appln #201306200082 | |
| Jun 20, 2019 | Completed final sign-off Aug 2019 | 545 02nd St | erect temporary plywood protective structure over rear patio due to adjacent project, per planning code 205.2, duration 18-22 months.Details
erect temporary plywood protective structure over rear patio due to adjacent project, per planning code 205.2, duration 18-22 months. | $5,000 |
| Jun 20, 2019 | Never finaled issued Jun 2019, no final | 1251 Connecticut St | hook up 1x commercial dishwasher on warehouse floorDetails
hook up 1x commercial dishwasher on warehouse floor | $1,500 |
| May 10, 2019 | Completed final sign-off Mar 2021 | 77 Federal St | new underground fire serviceDetails
new underground fire service | $8,000 |
| Mar 29, 2019 | Completed final sign-off Mar 2019 | 3939 24th St | to obtain final inspection for work approved under pa#200308212756, 200308212761, & 200309255787Details
to obtain final inspection for work approved under pa#200308212756, 200308212761, & 200309255787 | |
| Mar 15, 2019 | Never finaled issued Apr 2019, no final | 3939 24th St | install 1 illuminated single-faced wall logo sign.Details
install 1 illuminated single-faced wall logo sign. | $1,500 |
| Feb 13, 2019 | Never finaled issued Feb 2019, no final | 58 Dorland St | install unoccupied living roof & maintenace rail above garage. not visible from stret.Details
install unoccupied living roof & maintenace rail above garage. not visible from stret. | $5,800 |
| Jan 28, 2019 | Completed final sign-off Jun 2020 | 540 De Haro St | stormwater drainage onlyDetails
stormwater drainage only | |
| Dec 5, 2018 | Completed final sign-off Mar 2019 | 3935 24th St | revision to pa 2018-0620-2451 revise seismic to reflect existing framing. revise accessibility, hvac & lighting to reflect ti and add partitions. no exterior work. ref pa 2018-1127-6740Details
revision to pa 2018-0620-2451 revise seismic to reflect existing framing. revise accessibility, hvac & lighting to reflect ti and add partitions. no exterior work. ref pa 2018-1127-6740 | $205,000 |
| Nov 29, 2018 | Expired or cancelled cancelled Jan 2026 | 58 Dorland St | add new roof deck in buildable area.Details
add new roof deck in buildable area. | $27,000 |
| Nov 27, 2018 | Completed final sign-off Mar 2019 | 3939 24th St | change of use per 2018009337 cua/motion 20304. replace and repair extg storefront, new rear yard deck, new windows at rear and door.Details
change of use per 2018009337 cua/motion 20304. replace and repair extg storefront, new rear yard deck, new windows at rear and door. | $47,000 |
| Aug 3, 2018 | Completed final sign-off Aug 2018 | 500 De Haro St | to comply with complaint #201864777 dated 5/18/2018 & 201869571 dated 5/24/2018; replace damaged studs, plywood & drywall, replace in-kind as required @ property line wall; apply liquid waterproofing south property line wallDetails
to comply with complaint #201864777 dated 5/18/2018 & 201869571 dated 5/24/2018; replace damaged studs, plywood & drywall, replace in-kind as required @ property line wall; apply liquid waterproofing south property line wall | $3,000 |
| Jun 29, 2018 | Completed final sign-off Mar 2019 | 3939 24th St | exploratory test pits to determine the location, width, depth of both the permimeter foundation and grade beams/pads break and haul slab as required to locate footings. estimated 2 x test pits for each concrete element. to be will post observatoryDetails
exploratory test pits to determine the location, width, depth of both the permimeter foundation and grade beams/pads break and haul slab as required to locate footings. estimated 2 x test pits for each concrete element. to be will post observatory | $2,000 |
| Jun 20, 2018 | Completed final sign-off Apr 2019 | 3935 24th St | voluntary seismic upgrade including one new accessible restroom, updating of existing restrooms and adding of associated mechanical equipment. no change of use or occupancy. no exterior work.Details
voluntary seismic upgrade including one new accessible restroom, updating of existing restrooms and adding of associated mechanical equipment. no change of use or occupancy. no exterior work. | $25,000 |
| Jun 1, 2018 | Completed final sign-off Oct 2021 | 85 Federal St | demolish a 2-story office building. **maher n/a**Details
demolish a 2-story office building. **maher n/a** | $38,500 |
| Apr 6, 2018 | Completed final sign-off Oct 2021 | 77 Federal St | demolish 2-story office building///vif life safety (alarm and sprinklers) shall be terminated prior to demolition. **maher n/a**Details
demolish 2-story office building///vif life safety (alarm and sprinklers) shall be terminated prior to demolition. **maher n/a** | $38,500 |
| Mar 2, 2018 | Completed final sign-off Jan 2019 | 543 Rhode Island St | install temporary shoring along property to allow excavation for new development at 540 de haro street. tieback encroachment only on this permit. construction cost under 540 de haro street (permit appllication #2015-0210-7867).Details
install temporary shoring along property to allow excavation for new development at 540 de haro street. tieback encroachment only on this permit. construction cost under 540 de haro street (permit appllication #2015-0210-7867). | |
| Mar 2, 2018 | Completed final sign-off Jan 2019 | 549 Rhode Island St | install temporary shoring along property to allow excavation for new development at 540 de haro street. tieback encroachment only on this permit. construction cost under 540 de haro street (permit appllication #2015-0210-7867).Details
install temporary shoring along property to allow excavation for new development at 540 de haro street. tieback encroachment only on this permit. construction cost under 540 de haro street (permit appllication #2015-0210-7867). | |
| Mar 2, 2018 | Completed final sign-off Jan 2019 | 537 Rhode Island St | install temporary shoring along property to allow excavation for new development at 540 de haro street. tieback encroachment only on this permit. construction cost under 540 de haro street (permit appllication #2015-0210-7867).Details
install temporary shoring along property to allow excavation for new development at 540 de haro street. tieback encroachment only on this permit. construction cost under 540 de haro street (permit appllication #2015-0210-7867). | |
| Mar 2, 2018 | Completed final sign-off Jan 2019 | 555 Rhode Island St | install temporary shoring along property to allow excavation for new development at 540 de haro street. tieback encroachment only on this permit. construction cost under 540 de haro street (permit appllication #2015-0210-7867).Details
install temporary shoring along property to allow excavation for new development at 540 de haro street. tieback encroachment only on this permit. construction cost under 540 de haro street (permit appllication #2015-0210-7867). | |
| Sep 22, 2017 | Completed final sign-off Apr 2018 | 51 Elgin Pk | unit #51: add bathroom on g/f with new stair to access to 2/f replace kitchen and bath in kind remodel. unit #55: replace kitchen & bath in kind remodel - relocate unit entry door and add stair access with roof hatch to roof deck. add roof deck. n/a maherDetails
unit #51: add bathroom on g/f with new stair to access to 2/f replace kitchen and bath in kind remodel. unit #55: replace kitchen & bath in kind remodel - relocate unit entry door and add stair access with roof hatch to roof deck. add roof deck. n/a maher | $100,000 |
| Jul 25, 2017 | Completed final sign-off Jun 2020 | 540 De Haro St | drill 24" diameter test holes to determine feasibility of shoring. holes to e 8' on center along west property line. n/a maherDetails
drill 24" diameter test holes to determine feasibility of shoring. holes to e 8' on center along west property line. n/a maher | $5,000 |
| Apr 5, 2017 | Completed final sign-off Jan 2018 | 353 10th St | title 24 lighting compliance for accessibility and exit path upgrade to extg commercial building with app#201610251119. n/a for maherDetails
title 24 lighting compliance for accessibility and exit path upgrade to extg commercial building with app#201610251119. n/a for maher | $25,000 |
| Nov 4, 2016 | Completed final sign-off Nov 2016 | 1233 Connecticut St | revision to 201509046283 - delete showerDetails
revision to 201509046283 - delete shower | |
| Oct 25, 2016 | Never finaled issued Nov 2016, no final | 353 10th St | accessibility/exit upgrade for existing cafe, office, & manufacturing space. n/a maher ordinanceDetails
accessibility/exit upgrade for existing cafe, office, & manufacturing space. n/a maher ordinance | $120,000 |
| Oct 18, 2016 | Completed final sign-off Nov 2016 | 1495 Wallace Av | to comply with nov 20161144 to revert to last legal conditions. maher naDetails
to comply with nov 20161144 to revert to last legal conditions. maher na | |
| Aug 23, 2016 | Completed final sign-off May 2017 | 155 12th St | abate to complaint # 2015-011186 enf, replace (e) solid fence with (n) 6' max high fence, metal perforated screen with 75% min. open view.Details
abate to complaint # 2015-011186 enf, replace (e) solid fence with (n) 6' max high fence, metal perforated screen with 75% min. open view. | $5,000 |
| Feb 5, 2016 | Completed final sign-off Apr 2016 | 1150 Quesada Av | revision to 201305237736, layout changes inclu de demo of stair to mezzanine and partitions. mep sep permit- na maher ord. 155-13Details
revision to 201305237736, layout changes inclu de demo of stair to mezzanine and partitions. mep sep permit- na maher ord. 155-13 | |
| Jan 27, 2016 | Completed final sign-off Sep 2017 | 1233 17th St | upgrade () exit egress path in rear shed. maher naDetails
upgrade () exit egress path in rear shed. maher na | $5,000 |
| Jan 15, 2016 | Expired or cancelled expired Feb 2019 | 147 Missouri St | repair substandard floor by sistering new joists per plan. replace (e) substandard beam, provide voluntary plywood stiffening. n/a ordinance #155-13Details
repair substandard floor by sistering new joists per plan. replace (e) substandard beam, provide voluntary plywood stiffening. n/a ordinance #155-13 | $20,000 |
| Dec 31, 2015 | Completed final sign-off Oct 2017 | 2536 Clay St | revision to 201905024822 for sequential shoringDetails
revision to 201905024822 for sequential shoring | |
| Dec 11, 2015 | Completed final sign-off Jun 2016 | 147 Missouri St | provide new concrete mat slab per plan.Details
provide new concrete mat slab per plan. | $25,000 |
| Dec 3, 2015 | Completed final sign-off Jun 2020 | 540 De Haro St | demolish 2-story, type 1, industrial warehouse.Details
demolish 2-story, type 1, industrial warehouse. | $20,000 |
| Dec 2, 2015 | Completed final sign-off Mar 2016 | 430 Shotwell St | title- 24 lighting compliance for t.i. of extg commercial bldg under app#201509015839 and 201511051806. n/a for maherDetails
title- 24 lighting compliance for t.i. of extg commercial bldg under app#201509015839 and 201511051806. n/a for maher | $20,000 |
| Nov 19, 2015 | Expired or cancelled suspend Mar 2017 | 473 Haight St | remodel medical cannabis dispensary portion of retail store & expand it to 517 sq. ft. relocate entry & atm. mechanical & electrical under separate permits. ** maher: compliance with ordinance no# 155-13 not required **Details
remodel medical cannabis dispensary portion of retail store & expand it to 517 sq. ft. relocate entry & atm. mechanical & electrical under separate permits. ** maher: compliance with ordinance no# 155-13 not required ** | $87,000 |
| Nov 18, 2015 | Completed final sign-off Jun 2016 | 145 Missouri St | shoring for future excavation for proposed building at 131 missouri street, app. #2013-06-19-9977sDetails
shoring for future excavation for proposed building at 131 missouri street, app. #2013-06-19-9977s | $45,000 |
| Nov 18, 2015 | Completed final sign-off Jun 2016 | 147 Missouri St | shoring within existing property. n/a maher ordinanceDetails
shoring within existing property. n/a maher ordinance | $45,000 |
| Nov 5, 2015 | Completed final sign-off Mar 2016 | 430 Shotwell St | revision to pa #201509015839 - reconfigure & relocate the accessible restroom & lunch room & stairs, upgrade mezzanine floor. n/a maher ordinance.Details
revision to pa #201509015839 - reconfigure & relocate the accessible restroom & lunch room & stairs, upgrade mezzanine floor. n/a maher ordinance. | $50,000 |
| Sep 1, 2015 | Completed final sign-off Mar 2016 | 430 Shotwell St | ti: accessibility upgrades. add 6 4'x4' skylights. maher naDetails
ti: accessibility upgrades. add 6 4'x4' skylights. maher na | $80,000 |
| Jul 10, 2015 | Completed final sign-off Mar 2016 | 430 Shotwell St | soft demolition of existing commerical space with exception to requirments for disabled access to vacant space per ab-017.Details
soft demolition of existing commerical space with exception to requirments for disabled access to vacant space per ab-017. | $20,000 |
| Apr 9, 2015 | Completed final sign-off Jun 2015 | 798 Anderson St | add bedroom & hallway (293 sq.ft.), add shower to convert (e) 1/2 bath to full bath on 1/fDetails
add bedroom & hallway (293 sq.ft.), add shower to convert (e) 1/2 bath to full bath on 1/f | $28,000 |
| Feb 10, 2015 | Completed final sign-off Jun 2020 | 540 De Haro St | erect 5-story residential building of 16 units, .Details
erect 5-story residential building of 16 units, . | $4,000,000 |
| Jan 30, 2015 | Completed final sign-off Jun 2015 | 1205 Rhode Island St | renovation of #1205 of existing 3-unit residence: remodeling of (e) kitchen & bathroom, add one bathroom. upgrade electrical within entire unit, new floors throughout, no structural work.Details
renovation of #1205 of existing 3-unit residence: remodeling of (e) kitchen & bathroom, add one bathroom. upgrade electrical within entire unit, new floors throughout, no structural work. | $43,000 |
| Nov 20, 2014 | Completed final sign-off Aug 2015 | 58 Dorland St | enlarging an open deck with accessibility from the unit below through a roof hatch. revision to permit# 201409126225 & 201410300308Details
enlarging an open deck with accessibility from the unit below through a roof hatch. revision to permit# 201409126225 & 201410300308 | $30,000 |
| Oct 30, 2014 | Completed final sign-off Aug 2015 | 58 Dorland St | revision to pa #201409126225: infill (e) entry on 1st floor & remodel facade - windows & doors, apply new plaster finish.Details
revision to pa #201409126225: infill (e) entry on 1st floor & remodel facade - windows & doors, apply new plaster finish. | $50,000 |
| Oct 22, 2014 | Completed final sign-off Apr 2016 | 790 Valencia St | administrative purpose only. no work under this permit. all work don under pa# 2014/08/11/3533. for planning department purpose only to clarify use for public notice as limited restaurant & not formula retail.Details
administrative purpose only. no work under this permit. all work don under pa# 2014/08/11/3533. for planning department purpose only to clarify use for public notice as limited restaurant & not formula retail. | |
| Oct 21, 2014 | Completed final sign-off Mar 2015 | 155 12th St | tenant improvement of existing building; accessibility upgrade, relocation of (e) mezzanine, install 6'-0 max high metal screen fence. mechanical under separate permit.Details
tenant improvement of existing building; accessibility upgrade, relocation of (e) mezzanine, install 6'-0 max high metal screen fence. mechanical under separate permit. | $120,000 |
| Sep 12, 2014 | Completed final sign-off Aug 2015 | 58 Dorland St | reduction of (e) rear garage form 877 sq to 633 sq,, alteration of exterior stairs in middle yard, structural, new foundation & framing for garage. bath room and kitchen remodelDetails
reduction of (e) rear garage form 877 sq to 633 sq,, alteration of exterior stairs in middle yard, structural, new foundation & framing for garage. bath room and kitchen remodel | $125,000 |
| Sep 2, 2014 | Completed final sign-off Mar 2015 | 155 12th St | soft demo of existing commercial building per ab-017. removal of existing non-bearing walls. t.i. and mep under separate permits. maher n/a.Details
soft demo of existing commercial building per ab-017. removal of existing non-bearing walls. t.i. and mep under separate permits. maher n/a. | $3,500 |
| Aug 11, 2014 | Never finaled issued Aug 2014, no final | 1256 Mission St | add non-bearing wall for dividing two office rooms, in existing medical cannabis dispensaryDetails
add non-bearing wall for dividing two office rooms, in existing medical cannabis dispensary | $6,000 |
| Aug 11, 2014 | Completed final sign-off Nov 2014 | 790 Valencia St | first time tenant improvement of juice shop. mechanical & fire sprinkler separate permit.Details
first time tenant improvement of juice shop. mechanical & fire sprinkler separate permit. | $75,000 |
| Aug 11, 2014 | Completed final sign-off Dec 2014 | 101 15th St | t.i. of existing office. add non-bearing walls for new office rooms. relocate one new restroom, remodle (e) breakroom & storage area. reconfigure two existing stairs. n/a maher ordinanceDetails
t.i. of existing office. add non-bearing walls for new office rooms. relocate one new restroom, remodle (e) breakroom & storage area. reconfigure two existing stairs. n/a maher ordinance | $50,000 |
| Jul 31, 2014 | Completed final sign-off Aug 2015 | 58 Dorland St | structural strengthening per plan.install plywood sheathing @ all floors, new center beam and upgrade foundation.Details
structural strengthening per plan.install plywood sheathing @ all floors, new center beam and upgrade foundation. | $60,000 |
| Jul 11, 2014 | Completed final sign-off Aug 2015 | 60 Dorland St | remodel (e) 2 kitchens & 2 bathrooms of uppper and lower units of duplex' to comply with cec150(k) 8 & 10Details
remodel (e) 2 kitchens & 2 bathrooms of uppper and lower units of duplex' to comply with cec150(k) 8 & 10 | $32,000 |
| Jun 27, 2014 | Expired or cancelled cancelled Oct 2014 | 1405 Indiana St | new 5' high fence at side of lot. compliance with ord 155-13 not requiredDetails
new 5' high fence at side of lot. compliance with ord 155-13 not required | $5,000 |
| Jun 24, 2014 | Completed final sign-off Jul 2014 | 1405 Indiana St | 10' high sound proofing wall. to suround extg hvac system with roof. n/a ordinance #155-13.Details
10' high sound proofing wall. to suround extg hvac system with roof. n/a ordinance #155-13. | $15,000 |