Essa's Remodeling
- Based in
- San Francisco
- On San Francisco permits
- May 2011 to Jun 2026
- Last 24 months
- 7 permits filed
88 permits since 2000: 67 completed, 5 in progress, 13 never finaled, 3 expired or cancelled.
Of the 13 never-finaled permits, 4 are 5 to 10 years old, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 23, 2026 | In progress issued Sep 2026 | 669 Geary St | revision to bpa: 202501178572 - tenant improvement for (e) grocery store - remove scope of work from restaurant / dining - one single occupant restroom to be accessible - (e) type 1 hood will not be used (disconnected)Details
revision to bpa: 202501178572 - tenant improvement for (e) grocery store - remove scope of work from restaurant / dining - one single occupant restroom to be accessible - (e) type 1 hood will not be used (disconnected) | |
| Apr 13, 2026 | In progress issued Apr 2026 | 120 Mason St | addressing permit only: link address 120 mason st to apn 0330/013. ground floor commercial.Details
addressing permit only: link address 120 mason st to apn 0330/013. ground floor commercial. | |
| Mar 19, 2026 | Completed final sign-off Jun 2026 | 120 Mason St | ti of (e) vacant car rental office to (n) cafeDetails
ti of (e) vacant car rental office to (n) cafe | $100,000 |
| Feb 26, 2026 | In progress issued Sep 2026 | 9 Kearny St | t.i. of cafe in vacant electronic repair store (change of use form office b / 10 to cafe b / 05) at the restoom, remove the automatic door closer & the equipment impeding door operation to improve accessiblity. no changes to heating & ventilationDetails
t.i. of cafe in vacant electronic repair store (change of use form office b / 10 to cafe b / 05) at the restoom, remove the automatic door closer & the equipment impeding door operation to improve accessiblity. no changes to heating & ventilation | $30,000 |
| Dec 9, 2025 | Completed final sign-off Dec 2025 | 56 Moss St | unit #4: remove a total of 600sqft of siding, install waterproof paper, install new siding.Details
unit #4: remove a total of 600sqft of siding, install waterproof paper, install new siding. | $2,000 |
| Aug 7, 2025 | In progress issued Aug 2025 | 2368 Vallejo St | split e) one bathroom to 2 bathrooms @ 2nd fl. existing: 1 jacuzzi, shower, 1 toilet, 1 bidet, 2 sinks. proposed: 2 showers, 2 toilet, no bidet, no jacuzzi. no exterior workDetails
split e) one bathroom to 2 bathrooms @ 2nd fl. existing: 1 jacuzzi, shower, 1 toilet, 1 bidet, 2 sinks. proposed: 2 showers, 2 toilet, no bidet, no jacuzzi. no exterior work | $17,000 |
| Jan 17, 2025 | In progress issued Sep 2025 | 669 Geary St | abatement of nov# 202425789. t.i for grocery store to incorporate pizza kitchen and restaurant. remove the as-built unpermitted rear deck. (e) stairs and landing to remain. remove as-built mezzanine level. remodel one single occupant restroom to be accessible. provide one new single occupantDetails
abatement of nov# 202425789. t.i for grocery store to incorporate pizza kitchen and restaurant. remove the as-built unpermitted rear deck. (e) stairs and landing to remain. remove as-built mezzanine level. remodel one single occupant restroom to be accessible. provide one new single occupant | $20,000 |
| Mar 17, 2022 | Completed final sign-off Jun 2022 | 225 30th St | revision to pa# 202009053608, title 24 exempt form.Details
revision to pa# 202009053608, title 24 exempt form. | |
| Sep 5, 2020 | Completed final sign-off Jun 2022 | 225 30th St | 1/f: repair existing elevator, machine room add 2 hour rating to the elevator machine room. in the storage and maintenance room. no sturctural changes, no changes to exterior facade. no change in useDetails
1/f: repair existing elevator, machine room add 2 hour rating to the elevator machine room. in the storage and maintenance room. no sturctural changes, no changes to exterior facade. no change in use | $70,000 |
| Jul 7, 2020 | Completed final sign-off Aug 2020 | 1047 Fell St | to demolish all kitchen cabinets and coutner top, install electrical gfci and recessed lights, install new cabinets and counter in same layout before, reiwre electrical in the whole apartment. kitchen is (6x10)Details
to demolish all kitchen cabinets and coutner top, install electrical gfci and recessed lights, install new cabinets and counter in same layout before, reiwre electrical in the whole apartment. kitchen is (6x10) | $20,000 |
| Jun 29, 2020 | Completed final sign-off Jun 2021 | 225 30th St | remodel serving area in room a210 and a230c. ada upgrade in restrooms.Details
remodel serving area in room a210 and a230c. ada upgrade in restrooms. | $450,000 |
| Jun 9, 2020 | Completed final sign-off Aug 2020 | 1053 Fell St | in-kind kitchen remodel: remove old kitchen cabinets and counter top, redo electrical, install new light fixtures, install new cabinets in same location, install new counter top and tiles, re wire electrical in whole apartment and install outlets.Details
in-kind kitchen remodel: remove old kitchen cabinets and counter top, redo electrical, install new light fixtures, install new cabinets in same location, install new counter top and tiles, re wire electrical in whole apartment and install outlets. | $20,000 |
| Jun 3, 2020 | Completed final sign-off Aug 2020 | 1049 Fell St | kitchen remodeling: remove and replace all cabinets, countertop and sink in kind, same location, install new electrical gfi, install recset lights, replace sheetrock, replace tiles on kitchen floor. replace appliances. all work in kind.Details
kitchen remodeling: remove and replace all cabinets, countertop and sink in kind, same location, install new electrical gfi, install recset lights, replace sheetrock, replace tiles on kitchen floor. replace appliances. all work in kind. | $20,000 |
| Feb 3, 2020 | Completed final sign-off May 2020 | 464 11th Av | replace visible sloped roof. no other work.Details
replace visible sloped roof. no other work. | $10,000 |
| Dec 6, 2019 | Completed final sign-off Jun 2021 | 464 11th Av | construct new restroom and laundry within e kitchen footprint. remodel e msr bath. reconstruct stair to attic level to bring up to code. new kitchen cabinets, finishes. reinforce e structural system by adding new posts and footings in garage and new posts and headersDetails
construct new restroom and laundry within e kitchen footprint. remodel e msr bath. reconstruct stair to attic level to bring up to code. new kitchen cabinets, finishes. reinforce e structural system by adding new posts and footings in garage and new posts and headers | $105,000 |
| Nov 26, 2018 | Completed final sign-off Jun 2019 | 1333 Bush St | 2nd floor ti and mep. upgrade finishes at existing corridors (rooms 215,227) - convert existing quite room (room 218) in to audiology/optomery room. convert existing nurse room 217 into hand wash station. replacing existing sink- convert quite room 216 to triage room. sprinklers sep. permit.Details
2nd floor ti and mep. upgrade finishes at existing corridors (rooms 215,227) - convert existing quite room (room 218) in to audiology/optomery room. convert existing nurse room 217 into hand wash station. replacing existing sink- convert quite room 216 to triage room. sprinklers sep. permit. | $325,000 |
| Oct 25, 2018 | Completed final sign-off Mar 2019 | 175 06th St | to replace (3) bathroom windows, waterproof, dispose of old windows to comply with nov # 201876652 item 2.Details
to replace (3) bathroom windows, waterproof, dispose of old windows to comply with nov # 201876652 item 2. | $1,650 |
| Oct 12, 2018 | Completed final sign-off Sep 2019 | 990 Polk St | new ventless hood and cooking equipment ul listed- mechanical work only- ul-300 separate permit- fire alarm connection separate permit.Details
new ventless hood and cooking equipment ul listed- mechanical work only- ul-300 separate permit- fire alarm connection separate permit. | $10,000 |
| Jan 30, 2018 | Never finaled issued Feb 2018, no final | 600 Stockton St | mechanical and electrical designs for pa 2017-0908-7346Details
mechanical and electrical designs for pa 2017-0908-7346 | $25,000 |
| Jan 17, 2018 | Never finaled issued Mar 2018, no final | 1043 Fell St | moving a sheer wall to create a bike storage space. revision to app#201706169584 for soft story p-807. n/a for maherDetails
moving a sheer wall to create a bike storage space. revision to app#201706169584 for soft story p-807. n/a for maher | $10,000 |
| Nov 15, 2017 | Completed final sign-off Jan 2018 | 757 Sutter St | #200to comply with his nov#201709961, replace base cabinets & sink in kitchen, paint hallway, change bathroom sink and paint bathroom.- n/a ordinance #155-13Details
#200to comply with his nov#201709961, replace base cabinets & sink in kitchen, paint hallway, change bathroom sink and paint bathroom.- n/a ordinance #155-13 | $5,000 |
| Sep 11, 2017 | Completed final sign-off Mar 2019 | 1945 Franklin St | new insulation also include with new 5/8 drywall 4000 sq ftDetails
new insulation also include with new 5/8 drywall 4000 sq ft | $8,500 |
| Sep 8, 2017 | Never finaled issued Feb 2018, no final | 600 Stockton St | level 1 -3 massage rooms in existing space. 4 mini pedicure area.Details
level 1 -3 massage rooms in existing space. 4 mini pedicure area. | $57,000 |
| Aug 28, 2017 | Completed final sign-off Dec 2017 | 1612 Fulton St | full bathroom remodeling: relocate plumbing fixtures. add new toilet,, no walls added or removed.Details
full bathroom remodeling: relocate plumbing fixtures. add new toilet,, no walls added or removed. | $15,000 |
| Jul 17, 2017 | Completed final sign-off Apr 2018 | 627 Lyon St | to comply with physical inspection report #cc-8096Details
to comply with physical inspection report #cc-8096 | $2,500 |
| Jul 13, 2017 | Completed final sign-off Nov 2018 | 1610 40th Av | convert portioin of garage to bedroom, full bath, and laundry area. skylight @ 2nd floor flr (flat)Details
convert portioin of garage to bedroom, full bath, and laundry area. skylight @ 2nd floor flr (flat) | $43,000 |
| Jun 21, 2017 | Completed final sign-off Apr 2018 | 603 Geary St | to comply with complaint 201778851 change of use from vacant to retail/groceriesDetails
to comply with complaint 201778851 change of use from vacant to retail/groceries | $2,500 |
| Jun 20, 2017 | Completed final sign-off Dec 2018 | 5024 03rd St | to replace total 6 windows, replace 3 broken glass. in the back side of the street not visible from the street; extend the water heater discharge wher valve pipe to the outside area; replace light fixture in the hall way.Details
to replace total 6 windows, replace 3 broken glass. in the back side of the street not visible from the street; extend the water heater discharge wher valve pipe to the outside area; replace light fixture in the hall way. | $3,000 |
| Jun 16, 2017 | Completed final sign-off Jun 2018 | 1043 Fell St | soft story retrofit per sfebc chapter 4d engineering creteriafema p-807. ** maher: n/a **Details
soft story retrofit per sfebc chapter 4d engineering creteriafema p-807. ** maher: n/a ** | $75,000 |
| Mar 20, 2017 | Completed final sign-off Apr 2017 | 1446 Market St | replace existing metal railing at secondary gront entry at market st w/new metal screen enclosure. signage under pa #201703201855. n/a maher ordinanceDetails
replace existing metal railing at secondary gront entry at market st w/new metal screen enclosure. signage under pa #201703201855. n/a maher ordinance | $6,900 |
| Mar 20, 2017 | Completed final sign-off Apr 2017 | 1446 Market St | install metal letters welded into new metal screen at front entry. n/a maher ordinanceDetails
install metal letters welded into new metal screen at front entry. n/a maher ordinance | $1,100 |
| Feb 10, 2017 | Never finaled issued Feb 2017, no final | 863 Fillmore St | unit #1: kitchen and bathroom remodeling. remove and replace some sheetrock in kitchen and bath, install new electrical and plumbing fixtures, install new floor, replace outlets for living room and bedroom, paint. high efficacy lightings and change in wall & openings layout.Details
unit #1: kitchen and bathroom remodeling. remove and replace some sheetrock in kitchen and bath, install new electrical and plumbing fixtures, install new floor, replace outlets for living room and bedroom, paint. high efficacy lightings and change in wall & openings layout. | $15,000 |
| Dec 8, 2016 | Completed final sign-off Oct 2017 | 612 Steiner St | soft story foundation installing holddowns, shearwall and foundation ground floor retain walls at 2ndDetails
soft story foundation installing holddowns, shearwall and foundation ground floor retain walls at 2nd | $25,000 |
| Nov 17, 2016 | Completed final sign-off Mar 2017 | 540 29th St | remodel existing bathroom on 3rd level. no change in walls and openings and replace existing bathtub with shower pan. replace lighting fixtures. use high efficacy lighting or controlled by manual on sensor with high efficacy main light.Details
remodel existing bathroom on 3rd level. no change in walls and openings and replace existing bathtub with shower pan. replace lighting fixtures. use high efficacy lighting or controlled by manual on sensor with high efficacy main light. | $12,000 |
| Sep 1, 2016 | Completed final sign-off Dec 2018 | 31 Miramar Av | revision to pa 2014-1203-2911 (s1) - lower level: no expansion. re-arrange bathroom fixture location, add skylight @ new master bedroomDetails
revision to pa 2014-1203-2911 (s1) - lower level: no expansion. re-arrange bathroom fixture location, add skylight @ new master bedroom | $50,000 |
| Jun 3, 2016 | Completed final sign-off Apr 2018 | 627 Lyon St | kitchen: remove the backsplash , install gfi outlet, patch the walls, install tiles backsplash. bathroom: switch toilets next to tub. install 2 sinks vanity, install new lights and gfi ouelts. backdeck: repair dryrot, install rail less than 50%. front basement storage: repair loose electrical wires.Details
kitchen: remove the backsplash , install gfi outlet, patch the walls, install tiles backsplash. bathroom: switch toilets next to tub. install 2 sinks vanity, install new lights and gfi ouelts. backdeck: repair dryrot, install rail less than 50%. front basement storage: repair loose electrical wires. | $7,300 |
| Jun 2, 2016 | Never finaled issued Jun 2016, no final | 2212 Lake St | reroofingDetails
reroofing | $5,500 |
| May 17, 2016 | Completed final sign-off Oct 2016 | 538 Munich St | reroofingDetails
reroofing | $6,000 |
| Dec 31, 2015 | Completed final sign-off Feb 2016 | 29 Glenview Dr | remove asphalt shingles front of roof, inkind replacement of roof shingles and flashingDetails
remove asphalt shingles front of roof, inkind replacement of roof shingles and flashing | $1,500 |
| Dec 2, 2015 | Completed final sign-off Apr 2016 | 47 Inverness Dr | bathroom remodel: remove all the sheetrock, new electrical and plumbing fixtures. install a new laundry hook.Details
bathroom remodel: remove all the sheetrock, new electrical and plumbing fixtures. install a new laundry hook. | $7,900 |
| Nov 12, 2015 | Never finaled issued Nov 2015, no final | 2119 24th St | reroofingDetails
reroofing | $10,000 |
| Nov 10, 2015 | Never finaled issued Jan 2016, no final | 1358 Valencia St | interior office remodeling to create 2 new offices and 2 new cubicle stations with in extg office area. remodel to create 2 ada compliant toilet rooms and add automatic door operator to interior door for path of travel upgrade.Details
interior office remodeling to create 2 new offices and 2 new cubicle stations with in extg office area. remodel to create 2 ada compliant toilet rooms and add automatic door operator to interior door for path of travel upgrade. | $16,500 |
| Oct 30, 2015 | Never finaled issued Nov 2015, no final | 2651 Baker St | upgrade foundation on 1st fl, revision 201506158983Details
upgrade foundation on 1st fl, revision 201506158983 | $40,000 |
| Oct 26, 2015 | Completed final sign-off Apr 2016 | 2208 Mission St | 2 bathrooms remodeling: install electrical and plumbing. no structural work. no wall modification.Details
2 bathrooms remodeling: install electrical and plumbing. no structural work. no wall modification. | $34,800 |
| Oct 9, 2015 | Never finaled issued Oct 2015, no final | 47 Inverness Dr | reroofingDetails
reroofing | $6,000 |
| Oct 9, 2015 | Expired or cancelled withdrawn Oct 2018 | 2651 Baker St | revision to app#201506158983: replace extg windows in kind, widen foyer stair opening, widen garage door, excavate and remodel 1st story 2nd unit and garage. 2nd unit remodel to include alterations to bathroom and kitchenette. new patio and new exterior doors and windows.Details
revision to app#201506158983: replace extg windows in kind, widen foyer stair opening, widen garage door, excavate and remodel 1st story 2nd unit and garage. 2nd unit remodel to include alterations to bathroom and kitchenette. new patio and new exterior doors and windows. | $50,000 |
| Oct 1, 2015 | Expired or cancelled expired Jun 2019 | 4072 18th St | replace & change exhaust fan; new make up air, new ansul fire suppression system under sep permit.Details
replace & change exhaust fan; new make up air, new ansul fire suppression system under sep permit. | $5,000 |
| Sep 30, 2015 | Completed final sign-off Nov 2015 | 532 Baker St | reroofingDetails
reroofing | $7,000 |
| Sep 11, 2015 | Completed final sign-off Nov 2015 | 837 Lake St | replace five (5) front windows - same size at bottom 2 levels to match top floor windows. windows will be double hung aluminum clad wood.Details
replace five (5) front windows - same size at bottom 2 levels to match top floor windows. windows will be double hung aluminum clad wood. | $4,500 |
| Sep 1, 2015 | Completed final sign-off Nov 2015 | 100 Naples St | reroofingDetails
reroofing | $6,000 |
| Sep 1, 2015 | Completed final sign-off Nov 2015 | 937 Judah St | kitchen and bathroom remodelig: kitchen to remove all the sheetrock, ceiling, install electric and plumbing, install new cabinets and counter tops. for the bathroom: to remodel the bathroom, install toilet, remodel half bathroom next main and install new sink.Details
kitchen and bathroom remodelig: kitchen to remove all the sheetrock, ceiling, install electric and plumbing, install new cabinets and counter tops. for the bathroom: to remodel the bathroom, install toilet, remodel half bathroom next main and install new sink. | $18,000 |
| Jul 13, 2015 | Completed final sign-off Feb 2016 | 436 Gold Mine Dr | remodel (2) upstairs bathrooms, all plubming & electrical work, reinstall sheetrock & tiles.Details
remodel (2) upstairs bathrooms, all plubming & electrical work, reinstall sheetrock & tiles. | $16,000 |
| Jun 26, 2015 | Completed final sign-off Aug 2016 | 1166 Green St | non structural work - no wall modification. to demolish kitchen cabinets and counter top. reinstall electrical and plumbing. installnew sheetrock, install new cabinets and counter top. demolish the bathroom. install new stand up shower, do all tiles work. install new plumbing for washer&dryerDetails
non structural work - no wall modification. to demolish kitchen cabinets and counter top. reinstall electrical and plumbing. installnew sheetrock, install new cabinets and counter top. demolish the bathroom. install new stand up shower, do all tiles work. install new plumbing for washer&dryer | $15,000 |
| Jun 15, 2015 | Completed final sign-off Oct 2018 | 2651 Baker St | rev.appl.# 2015.0331.2371. correct no. of unit is 2 units & provide plan for kitchen relocation. alteration of interior include wall removed between dining and kitchen. add one bathroom on 3rd floor. enlarge rear exterior wall opening onto deck. add 2 new skylights.replace 2 windows at front & side.Details
rev.appl.# 2015.0331.2371. correct no. of unit is 2 units & provide plan for kitchen relocation. alteration of interior include wall removed between dining and kitchen. add one bathroom on 3rd floor. enlarge rear exterior wall opening onto deck. add 2 new skylights.replace 2 windows at front & side. | $120,000 |
| Apr 30, 2015 | Never finaled issued Jun 2015, no final | 1830 Fillmore St | reconfigure kitchen floor plan. move non-load partition at kitchen area. ansul fire suppression system and fire alarm system under seperate permit. reconnect to fire alarm system under separate permit. n/a for maher.Details
reconfigure kitchen floor plan. move non-load partition at kitchen area. ansul fire suppression system and fire alarm system under seperate permit. reconnect to fire alarm system under separate permit. n/a for maher. | $5,000 |
| Mar 31, 2015 | Completed final sign-off Oct 2018 | 2651 Baker St | complete kitchen remodeling, remodeling of two upstairs bathroom. install new electrical panel.Details
complete kitchen remodeling, remodeling of two upstairs bathroom. install new electrical panel. | $30,000 |
| Mar 9, 2015 | Never finaled issued Mar 2015, no final | 680 48th Av | expand front deck per plans within current building envelope, this is a revision to approved permit 201411040635.Details
expand front deck per plans within current building envelope, this is a revision to approved permit 201411040635. | $25,000 |
| Nov 12, 2014 | Completed final sign-off Dec 2014 | 422 Valencia St | to install grab bars in all common use bathrooms of the hotel. to comply with grab bar ordinance. n/a for maher ordinance.Details
to install grab bars in all common use bathrooms of the hotel. to comply with grab bar ordinance. n/a for maher ordinance. | $9,800 |
| Nov 6, 2014 | Completed final sign-off Mar 2015 | 32 06th St | legalization for perfect fry ki 2006 award.Details
legalization for perfect fry ki 2006 award. | |
| Oct 8, 2014 | Completed final sign-off Oct 2014 | 547 05th Av | reroofingDetails
reroofing | $4,000 |
| Sep 16, 2014 | Completed final sign-off Jun 2015 | 116 Everson St | remodel kitchen like for like with new cabinets & flooring, remodel hall bath, like for like & remodel upstairs bath, add a shower pan to existing bath room, provide new lighting throughout house.Details
remodel kitchen like for like with new cabinets & flooring, remodel hall bath, like for like & remodel upstairs bath, add a shower pan to existing bath room, provide new lighting throughout house. | $38,000 |
| Aug 29, 2014 | Completed final sign-off Apr 2015 | 701 Taylor St | 3rd flr, unit #305: all work done in unit #305, remove/add interior non-bearing wall, remodel kitchen & bath, add washer/dryer, lighting to modified spacesDetails
3rd flr, unit #305: all work done in unit #305, remove/add interior non-bearing wall, remodel kitchen & bath, add washer/dryer, lighting to modified spaces | $30,000 |
| Aug 29, 2014 | Completed final sign-off Apr 2015 | 701 Taylor St | 3rd flr, unit #307: remove/add interior non-bearing walls, remodel kitchen & bath, add washer/dryer, lighting to modified spaces.Details
3rd flr, unit #307: remove/add interior non-bearing walls, remodel kitchen & bath, add washer/dryer, lighting to modified spaces. | $30,000 |
| Aug 25, 2014 | Expired or cancelled expired Mar 2022 | 1490 Pine St | replace (1) existing window on 2nd floor, corridor common area in kind, u-factor 0.32 max, not visible from street.Details
replace (1) existing window on 2nd floor, corridor common area in kind, u-factor 0.32 max, not visible from street. | $500 |
| Aug 25, 2014 | Never finaled issued Sep 2014, no final | 175 Stonecrest Dr | revision to pa 201404254274; reconfigure upper floor planDetails
revision to pa 201404254274; reconfigure upper floor plan | |
| Aug 1, 2014 | Completed final sign-off Feb 2015 | 1519 Mckinnon Av | reconfigure floor plan on 1st and 2nd floor and new bathroom on 1st floor.Details
reconfigure floor plan on 1st and 2nd floor and new bathroom on 1st floor. | $10,000 |
| Jun 20, 2014 | Completed final sign-off Oct 2014 | 286 Polaris Wy | remodel kitchen, 2 existing bathrms on 2nd flr per plan, add (n) entertainment rm on 1st flr, upgrade new electrical panel, repl windows, & furnace/ductwork, install new recessed light at 1st and 2nd flr per plan, replace front windows glass inkind no change to window frame.Details
remodel kitchen, 2 existing bathrms on 2nd flr per plan, add (n) entertainment rm on 1st flr, upgrade new electrical panel, repl windows, & furnace/ductwork, install new recessed light at 1st and 2nd flr per plan, replace front windows glass inkind no change to window frame. | $21,000 |
| Jun 5, 2014 | Completed final sign-off Sep 2014 | 2442 15th St | remodel kitchen and bath; to comply with cec150(k) 8 & 10Details
remodel kitchen and bath; to comply with cec150(k) 8 & 10 | $18,000 |
| May 23, 2014 | Completed final sign-off Jun 2014 | 3048 16th St | install grab bars in all bathrooms comply with nov 201323152 item #2Details
install grab bars in all bathrooms comply with nov 201323152 item #2 | $1,200 |
| Apr 30, 2014 | Completed final sign-off Nov 2014 | 1534 California St | revision to appl 201209250546 & 201401247078. reconfigure floor plan. ansul fire suppression system under seperate permit.Details
revision to appl 201209250546 & 201401247078. reconfigure floor plan. ansul fire suppression system under seperate permit. | |
| Apr 25, 2014 | Completed final sign-off Sep 2014 | 175 Stonecrest Dr | recofigure upper floor plan.Details
recofigure upper floor plan. | $15,000 |
| Apr 8, 2014 | Completed final sign-off May 2014 | 474 Valencia St | install grab bars in all bathrooms; compliance with ord 155-13 not requiredDetails
install grab bars in all bathrooms; compliance with ord 155-13 not required | $1,200 |
| Mar 24, 2014 | Completed final sign-off Jun 2014 | 2594 39th Av | remove old aluminum windows, replace all window. install new sliding door down stairs.Details
remove old aluminum windows, replace all window. install new sliding door down stairs. | $4,000 |
| Feb 10, 2014 | Completed final sign-off May 2014 | 2579 35th Av | kitchen and bath remodel. demolish kitchen cabinets,countertop, install new cabinets and counter. new lighting, bathroom. demolish all tilees. new tub,shower,tilesDetails
kitchen and bath remodel. demolish kitchen cabinets,countertop, install new cabinets and counter. new lighting, bathroom. demolish all tilees. new tub,shower,tiles | $18,000 |
| Jan 16, 2014 | Completed final sign-off May 2014 | 1470 20th Av | relocate gas supply line at (e) kitchen area. remove (e) storage at office. convert (e) bedroom into master bedroom per plan add one (n) bathroom.Details
relocate gas supply line at (e) kitchen area. remove (e) storage at office. convert (e) bedroom into master bedroom per plan add one (n) bathroom. | $38,000 |
| Dec 9, 2013 | Completed final sign-off Jan 2014 | 1379 42nd Av | remove tiles in bathroom install new bathtub, new vanity, new toilet install new tiles around bathtub and floor. no change of wall, window and door.Details
remove tiles in bathroom install new bathtub, new vanity, new toilet install new tiles around bathtub and floor. no change of wall, window and door. | $5,400 |
| Oct 1, 2013 | Completed final sign-off Oct 2013 | 615 Noe St | to remove formaica counter top in the kitchen, install new granite counter. remove bath tub in bathroom, install new bath tub and tile around the bath tub.Details
to remove formaica counter top in the kitchen, install new granite counter. remove bath tub in bathroom, install new bath tub and tile around the bath tub. | $3,500 |
| Jun 5, 2013 | Completed final sign-off Jun 2013 | 51 06th St | to comply with ordiance 029-13 only; installation of grab bars in sro at the following locations: -all 7 floors; each floor have 3 bathroomsDetails
to comply with ordiance 029-13 only; installation of grab bars in sro at the following locations: -all 7 floors; each floor have 3 bathrooms | $1,200 |
| May 28, 2013 | Completed final sign-off Jun 2013 | 175 06th St | to install new grab bar in all bathrooms: 5th floor 4 shower rooms with bathtub, 8 toilets, 4th floor: same amount, 3rd floor, same amount, 2nd floor: same amount. based on ordinance #029-13 load rating 250 pound. grab bar comply cbc chapter 11b.Details
to install new grab bar in all bathrooms: 5th floor 4 shower rooms with bathtub, 8 toilets, 4th floor: same amount, 3rd floor, same amount, 2nd floor: same amount. based on ordinance #029-13 load rating 250 pound. grab bar comply cbc chapter 11b. | $800 |
| May 22, 2013 | Completed final sign-off May 2013 | 516 Ofarrell St | to install new grab bar in all bathrooms to comply with the new city code, 3 bathrm in each floor, 2nd, 3rd, 4th and 5th flr, grab bar min load rating of 250 lbs.Details
to install new grab bar in all bathrooms to comply with the new city code, 3 bathrm in each floor, 2nd, 3rd, 4th and 5th flr, grab bar min load rating of 250 lbs. | $800 |
| May 10, 2013 | Completed final sign-off Jun 2013 | 364 Eddy St | to comply with ordinance 029 of grab bars, min. load rating of 250 lbs.Details
to comply with ordinance 029 of grab bars, min. load rating of 250 lbs. | $800 |
| May 10, 2013 | Completed final sign-off Jul 2013 | 373 Ellis St | to comply with ordinance 029 of grab bars, min. load rating of 250 lbs.Details
to comply with ordinance 029 of grab bars, min. load rating of 250 lbs. | $800 |
| Mar 25, 2013 | Never finaled issued Mar 2013, no final | 373 Ellis St | replace tiles in bathroom in 2nd and 3rd flrsDetails
replace tiles in bathroom in 2nd and 3rd flrs | $1,500 |
| Feb 27, 2013 | Completed final sign-off Apr 2013 | 373 Ellis St | to comply with complaint # 201388871, tiles are loose, retile the shower walls in the fifth floor . shower at hallway.Details
to comply with complaint # 201388871, tiles are loose, retile the shower walls in the fifth floor . shower at hallway. | $900 |
| Oct 1, 2012 | Completed final sign-off Oct 2012 | 3222 Buchanan St | revision to app#2012-09-27-0806. installing 1/2 thick plywood. 10d @ 6" edges @ 12" field. 1280 sq ft of plywood.Details
revision to app#2012-09-27-0806. installing 1/2 thick plywood. 10d @ 6" edges @ 12" field. 1280 sq ft of plywood. | $800 |
| Sep 27, 2012 | Completed final sign-off Oct 2012 | 3222 Buchanan St | reroofingDetails
reroofing | $4,000 |
| May 11, 2011 | Completed final sign-off May 2011 | 374 Moultrie St | some additional dry rot work need to be done on different parts of the decks and some work that was done before by other. to have it incorporated and included in the same permit; to comply with nov 201185848; total work on the deck is less than 50%; repair in kindDetails
some additional dry rot work need to be done on different parts of the decks and some work that was done before by other. to have it incorporated and included in the same permit; to comply with nov 201185848; total work on the deck is less than 50%; repair in kind | $500 |
| May 5, 2011 | Completed final sign-off May 2011 | 374 Moultrie St | repair dry rot wood in the back deck, 1 4x4 post need to be repaired, replace in kind. this permit is only for the dry rot repair. it does not include any other work on the property such as violation #201185848Details
repair dry rot wood in the back deck, 1 4x4 post need to be repaired, replace in kind. this permit is only for the dry rot repair. it does not include any other work on the property such as violation #201185848 | $800 |