Esquivel Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Sep 2021 to Jun 2026
- Last 24 months
- 5 permits filed
15 permits since 2000: 11 completed, 3 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 3, 2026 | Completed final sign-off Sep 2026 | 642 30th Av | deck repair and steps dry rot repair on code compliance, all railing garden side, at back of the house, back yard. not more than 50%Details
deck repair and steps dry rot repair on code compliance, all railing garden side, at back of the house, back yard. not more than 50% | $3,500 |
| Jan 21, 2026 | In progress filed Jan 2026, not yet issued | 556 Mississippi St | raise roof of (e) 3/f & add bathroom. convert 2/f bath to office, relocate laundry, remodel half-bath and add tub. reinforce g/f retaining walls.Details
raise roof of (e) 3/f & add bathroom. convert 2/f bath to office, relocate laundry, remodel half-bath and add tub. reinforce g/f retaining walls. | $225,000 |
| Dec 22, 2025 | In progress filed Dec 2025, not yet issued | 1119 Cole St | lower 1st floor slab, remodel 1/f & garage, relocate (e) full bath and add wet bar. connect new 1/f space to (e) 2/f unit w/ new internal spiral stair. excavate new patio area at rear of 1/f w/ stair up to grade level. demo (e) rear stair, replace with (n) spiral stair and landings.Details
lower 1st floor slab, remodel 1/f & garage, relocate (e) full bath and add wet bar. connect new 1/f space to (e) 2/f unit w/ new internal spiral stair. excavate new patio area at rear of 1/f w/ stair up to grade level. demo (e) rear stair, replace with (n) spiral stair and landings. | $180,000 |
| Jul 14, 2025 | Completed final sign-off Nov 2025 | 261 Missouri St | extend pantry & frame out area for a new stackable washer & dryer. install new hot & cold water supply lines from garage to 2nd floor. washer & dryer machine circuit conduit & wire approx. 90' ft of 3/4 emt conduit from existing electrical panel from garage to 2nd floor. add cabinets & wine fridgeDetails
extend pantry & frame out area for a new stackable washer & dryer. install new hot & cold water supply lines from garage to 2nd floor. washer & dryer machine circuit conduit & wire approx. 90' ft of 3/4 emt conduit from existing electrical panel from garage to 2nd floor. add cabinets & wine fridge | $12,000 |
| Nov 7, 2024 | Completed final sign-off Aug 2025 | 710 Broderick St | lower (e) slab 0f 1st floor unit 7 inchs. remodel unit including relocate kitchen and add french doorsDetails
lower (e) slab 0f 1st floor unit 7 inchs. remodel unit including relocate kitchen and add french doors | $25,000 |
| Feb 16, 2024 | Completed final sign-off May 2024 | 54 San Jose Av | kitchen remodel. remove existing to replace new cabinets, drywall, paint, electrical and plumbing. install new appliances.Details
kitchen remodel. remove existing to replace new cabinets, drywall, paint, electrical and plumbing. install new appliances. | $15,000 |
| Aug 21, 2023 | Completed final sign-off Nov 2023 | 800 Church St | apt #1: kitchen remodel. remove existing cabinets to replace with ne cabinets. install new electric for new applicance. lighting. install new drywall and paint. (e) kitchen 84 sq. ftDetails
apt #1: kitchen remodel. remove existing cabinets to replace with ne cabinets. install new electric for new applicance. lighting. install new drywall and paint. (e) kitchen 84 sq. ft | $2,800 |
| Mar 28, 2023 | Completed final sign-off Nov 2024 | 651 University St | to comply w/nov# 200455578, rebuild collapsed retaining walls in back yard & fenceDetails
to comply w/nov# 200455578, rebuild collapsed retaining walls in back yard & fence | $60,000 |
| Sep 1, 2022 | Completed final sign-off Mar 2023 | 6516 California St | kitchen and bathroom remodelDetails
kitchen and bathroom remodel | $24,000 |
| Jul 7, 2022 | In progress issued Jul 2024 | 347 Los Palmos Dr | add 3rd floor with bath, expand and remodel 2nd floor with new rear deck and stair, convert unconditioned space to habitable on 1st floor with new half bath.Details
add 3rd floor with bath, expand and remodel 2nd floor with new rear deck and stair, convert unconditioned space to habitable on 1st floor with new half bath. | $280,000 |
| Jun 8, 2022 | Completed final sign-off Dec 2022 | 651 University St | expand ground floor entryway into garage. replace furnace, relocate water heater, washer and dryer.Details
expand ground floor entryway into garage. replace furnace, relocate water heater, washer and dryer. | $25,000 |
| Jun 2, 2022 | Completed final sign-off May 2023 | 1119 Cole St | remodel kitchen: replace ktichen cabinets, counter tops, & fixtures. replace tile in bathroom. no exterior work. all work in-kind interior.Details
remodel kitchen: replace ktichen cabinets, counter tops, & fixtures. replace tile in bathroom. no exterior work. all work in-kind interior. | $40,000 |
| Apr 11, 2022 | Never finaled filed Apr 2022, never issued | 2476 Great Hy | build new roof deck build new stair penthouse at roof build new spiral stairs at existing stair wellDetails
build new roof deck build new stair penthouse at roof build new spiral stairs at existing stair well | $100,000 |
| Sep 20, 2021 | Completed final sign-off Nov 2021 | 1177 Shotwell St | comply with nov 202049511 rebuild damaged foundation at crawlspace. no work to interior.Details
comply with nov 202049511 rebuild damaged foundation at crawlspace. no work to interior. | $20,000 |
| Sep 20, 2021 | Completed final sign-off Jul 2022 | 556 Mississippi St | remodel ktichen and bath, relocate laundry, replace(e) interior stair in kindDetails
remodel ktichen and bath, relocate laundry, replace(e) interior stair in kind | $120,000 |