Eric Palmer
- Based in
- Mill Valley
- On San Francisco permits
- Jan 2005 to Jan 2022
- Last 24 months
- 0 permits filed
11 permits since 2000: 10 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 19, 2022 | Never finaled issued Oct 2022, no final | 128 Caine Av | to comply with violation 201903721, convert an existing permitted study room and bath to an adu unit at the first floor under the state adu program.Details
to comply with violation 201903721, convert an existing permitted study room and bath to an adu unit at the first floor under the state adu program. | $70,000 |
| Aug 19, 2019 | Completed final sign-off Jul 2020 | 701 Castro St | widen & relocate three garage doors. reduce height of existing brick facade.Details
widen & relocate three garage doors. reduce height of existing brick facade. | $50,000 |
| Jan 8, 2014 | Completed final sign-off May 2014 | 167 15th Av | remove & replace (e) flooring in kitchen, remove & replace (e) counter tops in kitchen, remove (e) ceiling lights & replace with two pendants, replace under counter lights, replace in-kind.Details
remove & replace (e) flooring in kitchen, remove & replace (e) counter tops in kitchen, remove (e) ceiling lights & replace with two pendants, replace under counter lights, replace in-kind. | $10,000 |
| Sep 24, 2012 | Completed final sign-off Jan 2013 | 5 07th Av | remodel 2/f bathroom new supply line and vent for washer/dryer, new vanity, sink, toilet and tub/shower, installation of fan/vent over tub/shower and light, possible relocation of toilet waste & tub drain, no structural changes, bathroom, size 7'x7'5".Details
remodel 2/f bathroom new supply line and vent for washer/dryer, new vanity, sink, toilet and tub/shower, installation of fan/vent over tub/shower and light, possible relocation of toilet waste & tub drain, no structural changes, bathroom, size 7'x7'5". | $10,000 |
| Oct 23, 2009 | Completed final sign-off Feb 2010 | 85 Saint Germain Av | show location of condenser for new air conditiong unit, and patch roofing after installation. revision to application 200910199291.Details
show location of condenser for new air conditiong unit, and patch roofing after installation. revision to application 200910199291. | |
| Oct 19, 2009 | Completed final sign-off Feb 2010 | 85 Saint Germain Av | reconfiguration of space on mezzanine level, add shower, sink & toilet. relocate furnace water heater. no structural changes to be made. add air ocnditioning to new furnace.Details
reconfiguration of space on mezzanine level, add shower, sink & toilet. relocate furnace water heater. no structural changes to be made. add air ocnditioning to new furnace. | $35,000 |
| Oct 8, 2009 | Completed final sign-off Feb 2010 | 85 Saint Germain Av | expoloratory demo. remove sheetrock for field investigation, approx 50 sf. no structural work. 3 2x2 holes on floor (3rd fl)Details
expoloratory demo. remove sheetrock for field investigation, approx 50 sf. no structural work. 3 2x2 holes on floor (3rd fl) | $1,000 |
| Sep 26, 2008 | Completed final sign-off Dec 2008 | 155 Clipper St | the existing bathroom to be remodeled in kind, replace vanity, shower. no plumbing to be moved. a new pressure balance valve to be installed & a new shower pan to be constructed. nov 200843521-ces.Details
the existing bathroom to be remodeled in kind, replace vanity, shower. no plumbing to be moved. a new pressure balance valve to be installed & a new shower pan to be constructed. nov 200843521-ces. | $15,000 |
| Jan 6, 2006 | Completed final sign-off Jun 2006 | 37 Cameo Wy | rotation of bathtub 90 degress counter clockwise & additional sink removal of old tub + all (e) tile all work to be done on lower floor.Details
rotation of bathtub 90 degress counter clockwise & additional sink removal of old tub + all (e) tile all work to be done on lower floor. | $10,000 |
| Jan 5, 2006 | Completed final sign-off Jun 2006 | 37 Cameo Wy | exploratory holes - max 12" by 12" - no new construction allowed, restricted to 4 holesDetails
exploratory holes - max 12" by 12" - no new construction allowed, restricted to 4 holes | $500 |
| Jan 21, 2005 | Completed final sign-off Jan 2005 | 4441 20th St | replacing an area 8 by 10 approximately 21-8' painted redwood planks only the planks will be replaceDetails
replacing an area 8 by 10 approximately 21-8' painted redwood planks only the planks will be replace | $750 |