Epic Environmental Compliance Systems In
- Based in
- Fremont
- On San Francisco permits
- Feb 2018 to Aug 2020
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 27, 2020 | Completed final sign-off Apr 2022 | 288 27th St | renovation and remodeling of all kitchens and bathrooms, 6 kitchens and 6 bathrooms, no work other than kitchen and bathroomsDetails
renovation and remodeling of all kitchens and bathrooms, 6 kitchens and 6 bathrooms, no work other than kitchen and bathrooms | $100,000 |
| Feb 21, 2018 | Completed final sign-off Jun 2022 | 654 Castro St | addition of two dwelling units at ground flr per ord# 162-16. 1st unit w/ 1 bedroom, 2nd unit w/ 2 bedrooms. a modification of front facade @ ground floor (replace garage door with window)Details
addition of two dwelling units at ground flr per ord# 162-16. 1st unit w/ 1 bedroom, 2nd unit w/ 2 bedrooms. a modification of front facade @ ground floor (replace garage door with window) | $200,000 |