Epic Compliance Systems
- Based in
- San Francisco
- On San Francisco permits
- Sep 2009 to Sep 2009
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 2, 2009 | Expired or cancelled expired Feb 2012 | 2400 San Bruno Av | install healy system clean air separation 400 gallon steel tank. provide 2 hr. rated concrete block wall with concrete infill #4 bar 16" on center each way around the healy tank with a 90 minutes rated door.Details
install healy system clean air separation 400 gallon steel tank. provide 2 hr. rated concrete block wall with concrete infill #4 bar 16" on center each way around the healy tank with a 90 minutes rated door. | $2,500 |