Envirocon Inc
- Based in
- Missoula
- On San Francisco permits
- May 2010 to Jun 2010
- Last 24 months
- 0 permits filed
5 permits since 2000: 5 never finaled.
Of the 5 never-finaled permits, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 23, 2010 | Never finaled issued Jun 2010, no final | 955 Egbert Av | 36" exavation on vacant lot. (e) gates do not encroach over the property lineDetails
36" exavation on vacant lot. (e) gates do not encroach over the property line | $25,000 |
| Jun 23, 2010 | Never finaled issued Jun 2010, no final | 895 Egbert Av | 36 " excavation on vacant lot. (e) gates do not encroach over the property lineDetails
36 " excavation on vacant lot. (e) gates do not encroach over the property line | $48,000 |
| Jun 1, 2010 | Never finaled issued Jun 2010, no final | 895 Egbert Av | to demolish commercial building awning structure.Details
to demolish commercial building awning structure. | $10,000 |
| May 25, 2010 | Never finaled issued Nov 2011, no final | 955 Egbert Av | excavate soil to a planned depth of 1 to 10 feet below existing grade for offsite disposal. backfill and compact import fill in 6-inch lifts to minimum 90% of relative desnisty. grade wil be restored to match surrounding.Details
excavate soil to a planned depth of 1 to 10 feet below existing grade for offsite disposal. backfill and compact import fill in 6-inch lifts to minimum 90% of relative desnisty. grade wil be restored to match surrounding. | $25,000 |
| May 25, 2010 | Never finaled issued Nov 2011, no final | 895 Egbert Av | remove concrete & asphalt pavement from entire site for off-site disposal. excavate soil to a planned depth of 1 to 10 ft below grade for off-site disposal. backfill & compact soil in 6 inch lifts to minimum 90% of relative density. grade will be restored to match surroundings.Details
remove concrete & asphalt pavement from entire site for off-site disposal. excavate soil to a planned depth of 1 to 10 ft below grade for off-site disposal. backfill & compact soil in 6 inch lifts to minimum 90% of relative density. grade will be restored to match surroundings. | $50,000 |