Engineered Soils Repairs
- Based in
- Walnut Creek
- On San Francisco permits
- May 2000 to Sep 2026
- Last 24 months
- 8 permits filed
175 permits since 2000: 145 completed, 6 in progress, 9 never finaled, 15 expired or cancelled.
Of the 9 never-finaled permits, 1 is 5 to 10 years old, 8 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 175.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 29, 2026 | In progress issued Sep 2026 | 253 States St | recommencement and completion of work approved under pa# 202405071569Details
recommencement and completion of work approved under pa# 202405071569 | $45,000 |
| Jul 10, 2026 | In progress issued Jul 2026 | 232 Fillmore St | underpin south permeter building foundation and partial garage slab replacement.Details
underpin south permeter building foundation and partial garage slab replacement. | $106,719 |
| Jun 4, 2026 | In progress issued Jul 2026 | 33 Normandie Tr | install concret sister wall with reinforcement attached to the (e) concrete retaining wall. install sump and pump and subdrain, sandtrap/catch basin to direct water to (e) cast iron sewer pipe.Details
install concret sister wall with reinforcement attached to the (e) concrete retaining wall. install sump and pump and subdrain, sandtrap/catch basin to direct water to (e) cast iron sewer pipe. | $25,000 |
| Jan 9, 2026 | Completed final sign-off Jun 2026 | 736 Arkansas St | foundation repair. remove and replace as section of existing perimeter foundation and mudsill. remove and replace exterior siding removed for access.Details
foundation repair. remove and replace as section of existing perimeter foundation and mudsill. remove and replace exterior siding removed for access. | $28,041 |
| Jun 27, 2025 | In progress filed Jun 2025, not yet issued | 5320 Diamond Heights Bl | replace (e) wood retaining wall with new soldier pile & wood logged retaining wall in hoa common area. same location, height & length. install subdrains behind wall. remove sections of concrete walkway as necessary for access and replaceDetails
replace (e) wood retaining wall with new soldier pile & wood logged retaining wall in hoa common area. same location, height & length. install subdrains behind wall. remove sections of concrete walkway as necessary for access and replace | $69,470 |
| May 12, 2025 | Completed final sign-off Dec 2025 | 2420 Leavenworth St | retaining wall stablization and drainage improvements. repair foundation cracksDetails
retaining wall stablization and drainage improvements. repair foundation cracks | $67,492 |
| May 12, 2025 | Completed final sign-off Dec 2025 | 2430 Leavenworth St | retaining wall stabilization on property line with 2420 leavenworth street includes tiebacks & deadman piers.Details
retaining wall stabilization on property line with 2420 leavenworth street includes tiebacks & deadman piers. | $67,492 |
| Feb 28, 2025 | Completed final sign-off Apr 2025 | 135 Castro St | voluntary partial siesmic retrofit. install t-straps and retrofit in crawl space.Details
voluntary partial siesmic retrofit. install t-straps and retrofit in crawl space. | $12,982 |
| Jul 12, 2024 | In progress issued Jul 2025 | 462 Bayview Cr | replace (2) separate sections of reatining walls due to damage. install drainage improvements located at the side and rear of property.Details
replace (2) separate sections of reatining walls due to damage. install drainage improvements located at the side and rear of property. | $133,746 |
| Jul 12, 2024 | Completed final sign-off Sep 2024 | 2375 15th Av | replace one existing cracked subfloor wood girdes postDetails
replace one existing cracked subfloor wood girdes post | $4,242 |
| Nov 7, 2023 | In progress filed Nov 2023, not yet issued | 325 China Basin St | miscellaneous building repair. existing below grade sewer line and storm line repairs and access tunnels with associated existing grade slab, landscaping, and hardscape restoration to match existing.Details
miscellaneous building repair. existing below grade sewer line and storm line repairs and access tunnels with associated existing grade slab, landscaping, and hardscape restoration to match existing. | $2,331,029 |
| Dec 8, 2022 | Completed final sign-off Mar 2023 | 181 Summit Wy | remove gypsum board in laundry room and closet adjacent to front foundation wall. shore and remove exposed floor plates, sleeper wall studs, and tile floor. waterproof front concrete foundation wall near laudnry room and garage crawl space area. replace removed materials.Details
remove gypsum board in laundry room and closet adjacent to front foundation wall. shore and remove exposed floor plates, sleeper wall studs, and tile floor. waterproof front concrete foundation wall near laudnry room and garage crawl space area. replace removed materials. | $39,479 |
| Nov 10, 2022 | Completed final sign-off Dec 2023 | 2783 34th Av | remove rear fence & failed retaining wall (wood). install modular block retaininig in same location to match area. replace wood fence.Details
remove rear fence & failed retaining wall (wood). install modular block retaininig in same location to match area. replace wood fence. | $63,491 |
| Mar 18, 2022 | Completed final sign-off Dec 2022 | 85 Ora Wy | replace (e) wood retaining wall in common area with stoacked block wall with subdrain. height and length to match (e) wall near building 85 and units 101, 103, 105.Details
replace (e) wood retaining wall in common area with stoacked block wall with subdrain. height and length to match (e) wall near building 85 and units 101, 103, 105. | $35,736 |
| Oct 27, 2021 | Completed final sign-off Apr 2022 | 1946 Washington St | revision to pa 202008121660. retaining wall pier revision and height.Details
revision to pa 202008121660. retaining wall pier revision and height. | |
| Oct 27, 2021 | Completed final sign-off Apr 2022 | 1948 Washington St | revision to pa 202008121682. retaining wall pier revision and height.Details
revision to pa 202008121682. retaining wall pier revision and height. | |
| Oct 27, 2021 | Completed final sign-off Apr 2022 | 1948 Washington St | revision to pa 202008121661. underpin helical revision. underpin northeast corner of foundation (uphill side) to prepare for retaining wall replacement. voluntary workDetails
revision to pa 202008121661. underpin helical revision. underpin northeast corner of foundation (uphill side) to prepare for retaining wall replacement. voluntary work | |
| Sep 29, 2021 | Completed final sign-off Oct 2022 | 335 Berry St | saw cut concrete podium slab and excavate trenches to expose underground sewer system. shore tunnel in exposed sections. plumbing repairs by others. replace concrete podium slab upon completion of plumbing workDetails
saw cut concrete podium slab and excavate trenches to expose underground sewer system. shore tunnel in exposed sections. plumbing repairs by others. replace concrete podium slab upon completion of plumbing work | $131,217 |
| Sep 29, 2021 | Completed final sign-off Oct 2022 | 330 Berry St | saw cut concrete podium slab and excavate trenches to expose underground sewer system. shore tunnel in exposed sections. plumbing repairs by others. replace concrete podium slab upon completion of plumbing workDetails
saw cut concrete podium slab and excavate trenches to expose underground sewer system. shore tunnel in exposed sections. plumbing repairs by others. replace concrete podium slab upon completion of plumbing work | $124,488 |
| Sep 9, 2021 | Completed final sign-off Dec 2021 | 63 Lupine Av | remove interior passage way concrete slab on grade floor to control joint near furnace. install 2, 4 foot deep concrete underpinning piers beneath settled interior spread footing. partially relevel and replace removed section of concrete floor in passage wayDetails
remove interior passage way concrete slab on grade floor to control joint near furnace. install 2, 4 foot deep concrete underpinning piers beneath settled interior spread footing. partially relevel and replace removed section of concrete floor in passage way | $25,466 |
| Jul 20, 2021 | Completed final sign-off Jan 2022 | 10 Imperial Al | cosmetic releveling of portion of residence w/ non skrink groot requires removal of lower protion of siding in the area and replace after relevel (visible from street).Details
cosmetic releveling of portion of residence w/ non skrink groot requires removal of lower protion of siding in the area and replace after relevel (visible from street). | $25,080 |
| Nov 16, 2020 | Completed final sign-off Nov 2021 | 43 Ora Wy | remove (e) railroad tie retaining wall and replace with a new solider pile and wood lagging retaining wall with a subdrain. approx 48lf at 2' and 5' ht range.same alignment as existing. work is in hoa common area adj to 80 ora way.Details
remove (e) railroad tie retaining wall and replace with a new solider pile and wood lagging retaining wall with a subdrain. approx 48lf at 2' and 5' ht range.same alignment as existing. work is in hoa common area adj to 80 ora way. | $74,804 |
| Aug 13, 2020 | Completed final sign-off Apr 2022 | 1948 Washington St | replace existing failed concrete retainning wall and fence with soldier pile and wood lagging wall with fence on top of wall.Details
replace existing failed concrete retainning wall and fence with soldier pile and wood lagging wall with fence on top of wall. | $35,168 |
| Aug 12, 2020 | Completed final sign-off Apr 2022 | 1946 Washington St | replace (e) failed concrete retaining walls and fence with soldier pile and wood lagging wall, with fence on top of wall.Details
replace (e) failed concrete retaining walls and fence with soldier pile and wood lagging wall, with fence on top of wall. | $35,168 |
| Aug 12, 2020 | Completed final sign-off Apr 2022 | 1948 Washington St | underpin northeast corner of foudnation luphill side to prepare for retaining wall replacement. voluntary work.Details
underpin northeast corner of foudnation luphill side to prepare for retaining wall replacement. voluntary work. | $27,379 |
| Jan 8, 2020 | Completed final sign-off Feb 2020 | 19 Sherwood Ct | replace failing piers for deck landing with reinforced concrete footing. install new wood posts and brackets.Details
replace failing piers for deck landing with reinforced concrete footing. install new wood posts and brackets. | $12,373 |
| Sep 20, 2019 | Completed final sign-off Jun 2020 | 93 Rockaway Av | rev to pa# 201110257570; install 21,3-inch diameter by 10 foot deep artchor, erosion control mattering tecco netting over the slope face. this work extends the work that was previously doneDetails
rev to pa# 201110257570; install 21,3-inch diameter by 10 foot deep artchor, erosion control mattering tecco netting over the slope face. this work extends the work that was previously done | $58,754 |
| Jun 20, 2019 | Completed final sign-off Feb 2020 | 19 Sherwood Ct | replace one section of failed wooden retaining wall with hand excavated pier and grade beam concrete retaing wall with wood fence on top of wallDetails
replace one section of failed wooden retaining wall with hand excavated pier and grade beam concrete retaing wall with wood fence on top of wall | $212,333 |
| Jun 18, 2019 | Completed final sign-off Dec 2019 | 185 Belgrave Av | increase size of existing concrete retaining wall footing. no change to the height of retaining wallDetails
increase size of existing concrete retaining wall footing. no change to the height of retaining wall | $63,916 |
| May 13, 2019 | Completed final sign-off Sep 2021 | 82 Stanton St | remove and replace damaged front concrete foundation wall. install soldier pile and wood lagging retaining wall in front of foundation for shoring. finished retaining wall will be below grade. install foundation drain system.Details
remove and replace damaged front concrete foundation wall. install soldier pile and wood lagging retaining wall in front of foundation for shoring. finished retaining wall will be below grade. install foundation drain system. | $181,703 |
| May 8, 2019 | Completed final sign-off Sep 2020 | 2541 California St | remove and replace siding at rear levation, install new moment frame and new footing at rear stair support. in kind deck repairs as needed under 50%. common area.Details
remove and replace siding at rear levation, install new moment frame and new footing at rear stair support. in kind deck repairs as needed under 50%. common area. | $300,000 |
| Nov 19, 2018 | Completed final sign-off May 2019 | 2 Townsend St | tunnel and shore soil to expose (e) sewer lines under building to provide access for plumbing, work will be performed by others.Details
tunnel and shore soil to expose (e) sewer lines under building to provide access for plumbing, work will be performed by others. | $97,449 |
| Oct 12, 2018 | Completed final sign-off Nov 2018 | 423 Hill St | remove and replace section of interior slab along the uphill side of the lower living space and along the side perimeters to install a subdrain system.Details
remove and replace section of interior slab along the uphill side of the lower living space and along the side perimeters to install a subdrain system. | $30,028 |
| Jun 28, 2018 | Completed final sign-off Nov 2018 | 95 Ora Wy | install subdrain along the east perimeter wall of the north stairwell. install a new sump pump with electrical with automatic pump. collected water will be pumped to landscaped area near garage. remove and replace section of keystone and slab around garage vent as necessary to install subdrainDetails
install subdrain along the east perimeter wall of the north stairwell. install a new sump pump with electrical with automatic pump. collected water will be pumped to landscaped area near garage. remove and replace section of keystone and slab around garage vent as necessary to install subdrain | $37,979 |
| Jun 4, 2018 | Completed final sign-off Jun 2018 | 255 Berry St | to obtain pa#2016 0505 6685. all work is complete. n/a for maher.Details
to obtain pa#2016 0505 6685. all work is complete. n/a for maher. | |
| Jun 4, 2018 | Completed final sign-off Jun 2018 | 325 China Basin St | to obtain pa#2016 0519 7934. all work is complete. n/a for maher.Details
to obtain pa#2016 0519 7934. all work is complete. n/a for maher. | |
| Apr 27, 2018 | Completed final sign-off Sep 2018 | 289 Randall St | r&r section of concrete stemwall in the garage. install a subdrain behind wallDetails
r&r section of concrete stemwall in the garage. install a subdrain behind wall | $12,637 |
| Mar 20, 2018 | Completed final sign-off Nov 2019 | 2617 Laguna St | underpin north side foundation and install new concrete sister wall, replace west side perimeter footing and interior foundation wallDetails
underpin north side foundation and install new concrete sister wall, replace west side perimeter footing and interior foundation wall | $262,301 |
| Mar 13, 2018 | Completed final sign-off Jul 2018 | 235 Berry St | remove concrete setions in those areas and dig test pits to acces plumbing for 3rd party plumbing inspection common area, replace rebar and concrete after testDetails
remove concrete setions in those areas and dig test pits to acces plumbing for 3rd party plumbing inspection common area, replace rebar and concrete after test | $22,114 |
| May 23, 2017 | Completed final sign-off Oct 2017 | 101 Lombard St | replace the (e) failed retaining wall with new steel i-beam post & wood lagging retaining wall. back fill erosion gullies with site soils in thin moistures condition compact lifts.Details
replace the (e) failed retaining wall with new steel i-beam post & wood lagging retaining wall. back fill erosion gullies with site soils in thin moistures condition compact lifts. | $47,974 |
| May 2, 2017 | Completed final sign-off Feb 2018 | 4364 17th St | remove and replace (2) retaining walls near the rear of the property w/ (2) (n) soldier pile & wood lagging of the same height as the (e) retaining walls.Details
remove and replace (2) retaining walls near the rear of the property w/ (2) (n) soldier pile & wood lagging of the same height as the (e) retaining walls. | $50,844 |
| Apr 26, 2017 | Completed final sign-off Aug 2017 | 521 27th St | installing a new wood post and wood lagging retaining wall with nine reinforced concrete foundation piers. a new subdrain system installed behind the wall. repair waterproofing memebraneDetails
installing a new wood post and wood lagging retaining wall with nine reinforced concrete foundation piers. a new subdrain system installed behind the wall. repair waterproofing memebrane | $31,746 |
| Mar 23, 2017 | Completed final sign-off Jan 2018 | 266 Casitas Av | install 14, 24 inch diameter stitch piers along the west side of the property line. tie backs will be installed with the stitch piers extending towards the cast side of the propertyDetails
install 14, 24 inch diameter stitch piers along the west side of the property line. tie backs will be installed with the stitch piers extending towards the cast side of the property | $289,752 |
| Feb 1, 2017 | Completed final sign-off Apr 2019 | 256 Casitas Av | to comply w/ nov #201694621. install stich piers assembly along west property line & approx 40' of south property line. install temporary shoring to stabilize (e) slope.Details
to comply w/ nov #201694621. install stich piers assembly along west property line & approx 40' of south property line. install temporary shoring to stabilize (e) slope. | $2,150,000 |
| Jan 24, 2017 | Never finaled issued Apr 2017, no final | 256 Casitas Av | to comply with nov 201694621: the (e) home was removed by emergency dem due to landslide. the proposed work include hillside stabilization and foundation for the replacement homeDetails
to comply with nov 201694621: the (e) home was removed by emergency dem due to landslide. the proposed work include hillside stabilization and foundation for the replacement home | $1,644,000 |
| Jan 18, 2017 | Completed final sign-off Jun 2017 | 266 Casitas Av | install (1) emergency underpinning pier along the rear foundation. the (n) underpinning pier will be 3ft x 4 ft & will extend a minimum of 10 ft i nto bedrockDetails
install (1) emergency underpinning pier along the rear foundation. the (n) underpinning pier will be 3ft x 4 ft & will extend a minimum of 10 ft i nto bedrock | $24,822 |
| Oct 11, 2016 | Completed final sign-off Mar 2017 | 801 27th St | drainage improvements & foundation crack repairsDetails
drainage improvements & foundation crack repairs | $36,544 |
| Sep 28, 2016 | Completed final sign-off Dec 2016 | 368 Eureka St | repair portion of foundation retaining wall along the left perimeter of the garage. also includes drainage improvements for the garage.Details
repair portion of foundation retaining wall along the left perimeter of the garage. also includes drainage improvements for the garage. | $14,700 |
| Sep 28, 2016 | Completed final sign-off Apr 2017 | 2663 15th Av | replace the basement concrete with a reinforced concrete mat foundation. (same elevation). install new patio concrete.Details
replace the basement concrete with a reinforced concrete mat foundation. (same elevation). install new patio concrete. | $160,000 |
| Sep 28, 2016 | Completed final sign-off Dec 2016 | 425 Los Palmos Dr | deck support seismic improvements. install steel plate for 2 post/footing connections, install 1/2" plywood cripple wall at extg foundation wall. no reconstruction or expansion of (e) deck.Details
deck support seismic improvements. install steel plate for 2 post/footing connections, install 1/2" plywood cripple wall at extg foundation wall. no reconstruction or expansion of (e) deck. | $6,273 |
| Jul 20, 2016 | Completed final sign-off Aug 2016 | 325 China Basin St | unit #105: excavate tunnel under concrete floor slab to repair damaged sewer pipe pluming work done by others. maximum quantity of soil to be excavated and removed off site shall not exceed 25 cubic yard.Details
unit #105: excavate tunnel under concrete floor slab to repair damaged sewer pipe pluming work done by others. maximum quantity of soil to be excavated and removed off site shall not exceed 25 cubic yard. | $46,372 |
| Jun 28, 2016 | Completed final sign-off Sep 2016 | 316 Rutledge St | stairway and basement area subdrain work, basement foundation wall damp proofing.Details
stairway and basement area subdrain work, basement foundation wall damp proofing. | $42,762 |
| May 19, 2016 | Never finaled issued Jun 2016, no final | 325 China Basin St | excavate tunnel under concrete floor slab to repair damaged sewer pipe.Details
excavate tunnel under concrete floor slab to repair damaged sewer pipe. | $37,373 |
| May 5, 2016 | Never finaled issued May 2016, no final | 255 Berry St | revision to app#201506037972. garage slab floor access opening closure with 8" min epoxy set dowels into extg garage slab. n/a for maherDetails
revision to app#201506037972. garage slab floor access opening closure with 8" min epoxy set dowels into extg garage slab. n/a for maher | |
| Dec 3, 2015 | Completed final sign-off Jun 2018 | 335 Berry St | saw cut concrete floor slab to access underslab piping. replacement of any sections of pipe where (e) pipe is damaged. adjust (e) pipe hangers to achieve propert pipe slope. n/a for maher ordinance no 155-13.Details
saw cut concrete floor slab to access underslab piping. replacement of any sections of pipe where (e) pipe is damaged. adjust (e) pipe hangers to achieve propert pipe slope. n/a for maher ordinance no 155-13. | $324,000 |
| Oct 16, 2015 | Completed final sign-off Sep 2018 | 325 Berry St | trench excavation under pile supported podium slab and installation of permanent shoring so plumbing repair work (separate permit & plans) can be done. common area. ** maher: compliance with ordinance no# 155-13 required; route to dph **Details
trench excavation under pile supported podium slab and installation of permanent shoring so plumbing repair work (separate permit & plans) can be done. common area. ** maher: compliance with ordinance no# 155-13 required; route to dph ** | $1,550,000 |
| Sep 3, 2015 | Expired or cancelled cancelled Dec 2015 | 864 Chenery St | install approx. 4 ft of subdrain pipe extg light well area. install subdrain against foundation retaining wall near the intermediate stair landing area. ref permit # 2015-0812-4088 for (e) subdrain location at adjacent property 870 chenery stDetails
install approx. 4 ft of subdrain pipe extg light well area. install subdrain against foundation retaining wall near the intermediate stair landing area. ref permit # 2015-0812-4088 for (e) subdrain location at adjacent property 870 chenery st | |
| Aug 12, 2015 | Expired or cancelled cancelled Dec 2015 | 870 Chenery St | install subdrain at the foundation/retaining wall near the intermediate stair landing, connect (n) sub drain to (e) sub drain system. ref permit application # 2105-0903-6126 for subdrain at adjacent property 864 chenery stDetails
install subdrain at the foundation/retaining wall near the intermediate stair landing, connect (n) sub drain to (e) sub drain system. ref permit application # 2105-0903-6126 for subdrain at adjacent property 864 chenery st | $10,000 |
| Jun 26, 2015 | Completed final sign-off Nov 2019 | 2617 Laguna St | soft story retrofit per mandated program (sfbc chapter 34b) based on 2012 iebc appendix a-4.Details
soft story retrofit per mandated program (sfbc chapter 34b) based on 2012 iebc appendix a-4. | $40,000 |
| Jun 3, 2015 | Completed final sign-off Jun 2018 | 255 Berry St | dig trenches & shoring beneath existing podium slab so that the sewer & storm drain lines can be replaced. this application is for trenching only. all plumbing work will be done by others under a separate permit. "work in common" area. n/a maher ordinanceDetails
dig trenches & shoring beneath existing podium slab so that the sewer & storm drain lines can be replaced. this application is for trenching only. all plumbing work will be done by others under a separate permit. "work in common" area. n/a maher ordinance | $2,469,554 |
| May 14, 2015 | Completed final sign-off May 2021 | 268 Lombard St | erosion surface protection (ocmpliance with nov #201413421 under pa #201505115940).Details
erosion surface protection (ocmpliance with nov #201413421 under pa #201505115940). | $20,000 |
| May 11, 2015 | Completed final sign-off Jun 2015 | 268 Lombard St | backfill of sinkhole to comply with nov: 201413631/201413421/201413642/20143651Details
backfill of sinkhole to comply with nov: 201413631/201413421/201413642/20143651 | $5,681 |
| Jun 6, 2014 | Completed final sign-off Sep 2014 | 1033 Kearny St | install a subdrain and interior wall waterproof along the east, north & west perimeter walls; fill a small abandon dumbwaiter void on the east wall approx 2.5 ft x 2.5 ftDetails
install a subdrain and interior wall waterproof along the east, north & west perimeter walls; fill a small abandon dumbwaiter void on the east wall approx 2.5 ft x 2.5 ft | $17,500 |
| Mar 26, 2014 | Completed final sign-off Jun 2014 | 1403 De Haro St | installation of a subdrain & moisture membrane along the left perimeter foundation. remove & replace (e) 2' tall wood post/wood lagging retaining wall & (e) concrete swale.Details
installation of a subdrain & moisture membrane along the left perimeter foundation. remove & replace (e) 2' tall wood post/wood lagging retaining wall & (e) concrete swale. | $34,800 |
| Oct 24, 2013 | Completed final sign-off Jul 2014 | 150 Lombard St | common area only- rev. to pa# 201309126598: delete one accessible shower from scope of work, relocate water drinking fountains.Details
common area only- rev. to pa# 201309126598: delete one accessible shower from scope of work, relocate water drinking fountains. | |
| Oct 22, 2013 | Completed final sign-off Jan 2014 | 9 Idora Av | install a subdrain along rear & right side perimeter foundation of house. install paraseal membrane, sand-interceptor. remove lower 12 inches of interior drywall within laundry room and hallway area to inspect conditions inside the wall cavities.Details
install a subdrain along rear & right side perimeter foundation of house. install paraseal membrane, sand-interceptor. remove lower 12 inches of interior drywall within laundry room and hallway area to inspect conditions inside the wall cavities. | $15,000 |
| Apr 25, 2013 | Completed final sign-off Jul 2014 | 150 Lombard St | waterproofing of courtyard deck & planting areas. new landscape & irrigation accessibility upgrades.Details
waterproofing of courtyard deck & planting areas. new landscape & irrigation accessibility upgrades. | $1,800,000 |
| Mar 13, 2013 | Completed final sign-off Aug 2013 | 2536 California St | inject a cement/bentonite slurry into the soil along the shoving wall to fill voids within the soil. permeation grout along the shoving wall to solidifiy loose sands. fill the core holes in garage slab with grout. remove & replace aDetails
inject a cement/bentonite slurry into the soil along the shoving wall to fill voids within the soil. permeation grout along the shoving wall to solidifiy loose sands. fill the core holes in garage slab with grout. remove & replace a | $19,800 |
| Aug 1, 2012 | Completed final sign-off Sep 2013 | 325 Berry St | common area: demo approx 4'x4' of slab and excavate 6' to facilitate plmb repairs at a 4" to 6" sub-surface waste line transition in garage. repairs to concrete slab to be made per attached drawings and calculations. work to be performed in common area. urgent repair.Details
common area: demo approx 4'x4' of slab and excavate 6' to facilitate plmb repairs at a 4" to 6" sub-surface waste line transition in garage. repairs to concrete slab to be made per attached drawings and calculations. work to be performed in common area. urgent repair. | $62,000 |
| Apr 9, 2012 | Completed final sign-off Mar 2013 | 435 Locust St | revision to 201106178414. relocation of steel beamsDetails
revision to 201106178414. relocation of steel beams | |
| Mar 26, 2012 | Completed final sign-off Jul 2012 | 45 Scenic Wy | install a subdrain system witin the rear lawn area. discharge the new subdrain system into new sand interceptors.Details
install a subdrain system witin the rear lawn area. discharge the new subdrain system into new sand interceptors. | $13,800 |
| Feb 16, 2012 | Completed final sign-off Apr 2012 | 77 Grand View Av | subgrade drainage repairs - saw cut conc slab adjacent to the wall planel, remove conc to install new drain pipe (25 lf). drill weep holes along the base of the wall. install new drainage panel up against the concrete foundation wall, install wire mesh, new 3-inch shotcrete surface. prime andDetails
subgrade drainage repairs - saw cut conc slab adjacent to the wall planel, remove conc to install new drain pipe (25 lf). drill weep holes along the base of the wall. install new drainage panel up against the concrete foundation wall, install wire mesh, new 3-inch shotcrete surface. prime and | $10,317 |
| Oct 25, 2011 | Completed final sign-off Jan 2012 | 93 Rockaway Av | install 33 rock bolts and high tensile steel wire mesh at slide area.Details
install 33 rock bolts and high tensile steel wire mesh at slide area. | $39,000 |
| Jul 7, 2011 | Expired or cancelled cancelled Jan 2026 | 48 Clifford Tr | install drainage & waterproofing measures on ground level. work imvolves installation of waterproofing on (e) foundation wall, of a new stem wall & footing to stabilize (e) wall during construction, removal of concrete slab floor, installation of under-slab drainage & new concret slab floor.Details
install drainage & waterproofing measures on ground level. work imvolves installation of waterproofing on (e) foundation wall, of a new stem wall & footing to stabilize (e) wall during construction, removal of concrete slab floor, installation of under-slab drainage & new concret slab floor. | $170,000 |
| Jun 17, 2011 | Completed final sign-off Jul 2011 | 1534 Taylor St | to obtain final inspection for work approved under pa#200706254965 all work is complete.Details
to obtain final inspection for work approved under pa#200706254965 all work is complete. | |
| Jun 17, 2011 | Completed final sign-off Mar 2013 | 435 Locust St | install new reinforced concrete footings to resupport the interior framework of the building . install new steel colummns and support beams to open up lower level for additional prkg spaces. install new concrete foundation, new deepened reinforced concrete footings. new concrete fl lowerarea of bldDetails
install new reinforced concrete footings to resupport the interior framework of the building . install new steel colummns and support beams to open up lower level for additional prkg spaces. install new concrete foundation, new deepened reinforced concrete footings. new concrete fl lowerarea of bld | $174,000 |
| Dec 10, 2010 | Completed final sign-off May 2011 | 1534 Taylor St | extg retaining wall repairs: core-drill 4 - 8" dia holes (tieback holes). install dcp anchors with centralizers. fill tieback holes with high strength grout. construct reinforced concrete whaler 1' thick and 2' deep.Details
extg retaining wall repairs: core-drill 4 - 8" dia holes (tieback holes). install dcp anchors with centralizers. fill tieback holes with high strength grout. construct reinforced concrete whaler 1' thick and 2' deep. | $19,000 |
| Jun 22, 2010 | Completed final sign-off Jan 2011 | 875 Church St | replace retaining wall 4' high on side propert line at rear.Details
replace retaining wall 4' high on side propert line at rear. | $26,800 |
| Nov 3, 2009 | Completed final sign-off Mar 2010 | 32 Cole St | remove & replace a failing concrete retaining wall.Details
remove & replace a failing concrete retaining wall. | $34,000 |
| Nov 3, 2009 | Completed final sign-off Mar 2010 | 1200 Bowdoin St | pipe connection to existing drain line from uphill retaining wall.Details
pipe connection to existing drain line from uphill retaining wall. | $666 |
| Nov 3, 2009 | Completed final sign-off Mar 2010 | 1208 Bowdoin St | retaining wall on adjacent property at 1208 bowdoin approx 6' high. underpin uphill foundation. replace walkway, pavers, patio & fence upon completion.Details
retaining wall on adjacent property at 1208 bowdoin approx 6' high. underpin uphill foundation. replace walkway, pavers, patio & fence upon completion. | $32,000 |
| Aug 24, 2009 | Completed final sign-off Jan 2010 | 2660 Scott St | remove 60' linear of brick wall and replace with steel reinforced concrete wall with brick overlay in between properties at 2650 and 2660 scott street.Details
remove 60' linear of brick wall and replace with steel reinforced concrete wall with brick overlay in between properties at 2650 and 2660 scott street. | $51,500 |
| Aug 24, 2009 | Completed final sign-off Jan 2010 | 2650 Scott St | underpin front porch columns with hand dug pits. remove and replace walkways w/ steel reinforced walkway w/ brickways. remove 60 linear ft of brickwall & replace w/ concrete steel reinforced w/ brick overlay. same height as before. wall is between 2650 & 2660 scott street.Details
underpin front porch columns with hand dug pits. remove and replace walkways w/ steel reinforced walkway w/ brickways. remove 60 linear ft of brickwall & replace w/ concrete steel reinforced w/ brick overlay. same height as before. wall is between 2650 & 2660 scott street. | $51,500 |
| Dec 12, 2008 | Completed final sign-off May 2009 | 743 Foerster St | remove & replace a portions of failing concrete retaining wall to comply with nov. 200560408.Details
remove & replace a portions of failing concrete retaining wall to comply with nov. 200560408. | $30,000 |
| Dec 12, 2008 | Completed final sign-off May 2009 | 747 Foerster St | remove & replace a portions of failing concrete retaining wall to comply with nov. 200560408.Details
remove & replace a portions of failing concrete retaining wall to comply with nov. 200560408. | $30,000 |
| Dec 12, 2008 | Completed final sign-off May 2009 | 751 Foerster St | remove & replace a portions of failing concrete retaining wall to comply with nov. 200560408.Details
remove & replace a portions of failing concrete retaining wall to comply with nov. 200560408. | $30,000 |
| Dec 12, 2008 | Completed final sign-off May 2009 | 755 Foerster St | remove & replace a portions of failing concrete retaining wall to comply with nov. 200560408.Details
remove & replace a portions of failing concrete retaining wall to comply with nov. 200560408. | $30,000 |
| Sep 22, 2008 | Never finaled issued Sep 2008, no final | 747 Foerster St | excavate four test pits, two in the rear yard and two in the access road easement, as part of geotechnical investigation for proposed replacement of an existing retaining wall.Details
excavate four test pits, two in the rear yard and two in the access road easement, as part of geotechnical investigation for proposed replacement of an existing retaining wall. | $12,500 |
| Jun 11, 2008 | Completed final sign-off Jul 2008 | 870 Chenery St | install of sump & subdrain system.Details
install of sump & subdrain system. | $20,000 |
| Feb 28, 2008 | Completed final sign-off Apr 2008 | 1600 08th Av | install new plywood panel, holddowns and simpson h1 over (e) cripple wall in basement/garage areaDetails
install new plywood panel, holddowns and simpson h1 over (e) cripple wall in basement/garage area | $5,100 |
| Feb 27, 2008 | Completed final sign-off Mar 2008 | 2090 Vallejo St | renew pa# 200606123783 (special insp. req.) for final inspection.Details
renew pa# 200606123783 (special insp. req.) for final inspection. | |
| Feb 7, 2008 | Completed final sign-off Feb 2008 | 1626 Diamond St | revision to 200608240395 to add boundary information between lots 5,6,7, &8 after slide & retaining wall repair & installation.Details
revision to 200608240395 to add boundary information between lots 5,6,7, &8 after slide & retaining wall repair & installation. | |
| Feb 7, 2008 | Completed final sign-off Feb 2008 | 49 Gold Mine Dr | revision to 200608240390 to add boundary information between lots 5,6,7, &8 after slide & retaining wall repair & installation.Details
revision to 200608240390 to add boundary information between lots 5,6,7, &8 after slide & retaining wall repair & installation. | |
| Feb 7, 2008 | Completed final sign-off Feb 2008 | 1636 Diamond St | revision to 200608240397, to add information between lots 5,6,7 & 8 after slide & retaining wall repair & installation.Details
revision to 200608240397, to add information between lots 5,6,7 & 8 after slide & retaining wall repair & installation. | |
| Feb 7, 2008 | Completed final sign-off Feb 2008 | 1644 Diamond St | revise 200608240396, to add boundary information between lots 5,6,7, &8 after slide & retaining wall repair & installation.Details
revise 200608240396, to add boundary information between lots 5,6,7, &8 after slide & retaining wall repair & installation. | |
| Oct 22, 2007 | Expired or cancelled expired Jan 2010 | 289 Randall St | revision to application # 200706295606 to show attachment of new footing to existing footing.Details
revision to application # 200706295606 to show attachment of new footing to existing footing. | |
| Aug 13, 2007 | Completed final sign-off Sep 2007 | 1626 Diamond St | rebuild existing concrete steps at grade in kind.provide handrail. rebuild guardrail.Details
rebuild existing concrete steps at grade in kind.provide handrail. rebuild guardrail. | $10,000 |
| Jul 6, 2007 | Completed final sign-off Apr 2011 | 455 Vallejo St | light scaling of hillside, rock bolt installation. wire mesh drape of rock slope.Details
light scaling of hillside, rock bolt installation. wire mesh drape of rock slope. | $300,000 |
| Jun 29, 2007 | Expired or cancelled expired Jan 2010 | 289 Randall St | drilled pier supported foundation wall for partial foundation replacement.Details
drilled pier supported foundation wall for partial foundation replacement. | $15,000 |
| Jun 6, 2007 | Completed final sign-off Aug 2007 | 220 Upper Tr | sub drain and surface drainage system-remove and replace deck as necessary and stairsDetails
sub drain and surface drainage system-remove and replace deck as necessary and stairs | $14,000 |