Emery Companies Inc./ Dba M M Construct.
- Based in
- San Francisco
- On San Francisco permits
- Oct 2014 to Jul 2018
- Last 24 months
- 0 permits filed
11 permits since 2000: 8 completed, 3 never finaled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 30, 2018 | Never finaled issued Aug 2018, no final | 77 Maiden Ln | improvements to elevator mechanical rooms on ph. ame plans. includes demo of equipment and lighting and addition of platforms and access ladder. fire and other elevator equipment installations under separate permit.Details
improvements to elevator mechanical rooms on ph. ame plans. includes demo of equipment and lighting and addition of platforms and access ladder. fire and other elevator equipment installations under separate permit. | $87,000 |
| Jun 21, 2017 | Completed final sign-off Aug 2017 | 69 Maiden Ln | provide structural shoring for work under pa# 2015-0519-6705Details
provide structural shoring for work under pa# 2015-0519-6705 | $28,000 |
| Nov 23, 2015 | Completed final sign-off Aug 2016 | 114 Grant Av | 1st floor: structural details for store front approval as supplemental info to approved permit 2015-0505-5377Details
1st floor: structural details for store front approval as supplemental info to approved permit 2015-0505-5377 | |
| Nov 17, 2015 | Completed final sign-off Aug 2016 | 114 Grant Av | revision to pa 2015-0406-2839 architectural plans per bldg classification. clarification of exiting & new demising walls & owner changes at millworkDetails
revision to pa 2015-0406-2839 architectural plans per bldg classification. clarification of exiting & new demising walls & owner changes at millwork | |
| Jul 22, 2015 | Completed final sign-off Mar 2016 | 77 Maiden Ln | minor non-structural interior demo, new drywall partitions, interior window & door, note: no mechanical or electrical this permit. fire alarm, life safety, and sprinklers on separate permits. no change to egress, occupancy or occupant load.Details
minor non-structural interior demo, new drywall partitions, interior window & door, note: no mechanical or electrical this permit. fire alarm, life safety, and sprinklers on separate permits. no change to egress, occupancy or occupant load. | $75,000 |
| May 19, 2015 | Completed final sign-off Aug 2016 | 114 Grant Av | 1st floor: mep coordination drawings for arch work - sep permit 2015 0406 2839Details
1st floor: mep coordination drawings for arch work - sep permit 2015 0406 2839 | $750,000 |
| May 19, 2015 | Completed final sign-off Jan 2020 | 69 Maiden Ln | currently vacant bldg.stru&enclose upgrd to bldg core&shell including frt facade(separate planning case #2015-004086 pta).new struc fdns&bearing wall.(n)struc grd fl&roof deck.(n)mezze(n)rooftop skylte,sloped roof assy&membrane.(n)stairs.(n)elec&plumb rough-in for bathrm.(n)rooftop mech unit.Details
currently vacant bldg.stru&enclose upgrd to bldg core&shell including frt facade(separate planning case #2015-004086 pta).new struc fdns&bearing wall.(n)struc grd fl&roof deck.(n)mezze(n)rooftop skylte,sloped roof assy&membrane.(n)stairs.(n)elec&plumb rough-in for bathrm.(n)rooftop mech unit. | $500,000 |
| May 5, 2015 | Completed final sign-off Aug 2016 | 114 Grant Av | modification & replacement of (e) storefront with (n) storefront w/ factory applied finish. supplemental to permit appl #201504062839Details
modification & replacement of (e) storefront with (n) storefront w/ factory applied finish. supplemental to permit appl #201504062839 | $50,000 |
| Apr 6, 2015 | Completed final sign-off Aug 2016 | 114 Grant Av | tenant improvement of basement 1st and second floors. construction of non load bearing partitions, modifications to existing ceiling, new light fixtures and switching. new doors,frames,finishes,elevator,stairs and restrooms. life safety, mech, elec under sep permitDetails
tenant improvement of basement 1st and second floors. construction of non load bearing partitions, modifications to existing ceiling, new light fixtures and switching. new doors,frames,finishes,elevator,stairs and restrooms. life safety, mech, elec under sep permit | $5,000,000 |
| Mar 11, 2015 | Never finaled issued Mar 2015, no final | 114 Grant Av | basement, ground, and 2nd flr selectice demo of (e) ti - will not affect any load bearing partitions. demo includes partitions, ceiling and finishes. ab-017.Details
basement, ground, and 2nd flr selectice demo of (e) ti - will not affect any load bearing partitions. demo includes partitions, ceiling and finishes. ab-017. | $55,000 |
| Oct 30, 2014 | Never finaled issued Nov 2014, no final | 77 Maiden Ln | selective demo and construction of non-load bearing partitions, modifications to existing ceiling/lights, new doors & frames, new millwork and sink, new finishes, electrical, mechanical, sprinkler and life safety under separate permit.Details
selective demo and construction of non-load bearing partitions, modifications to existing ceiling/lights, new doors & frames, new millwork and sink, new finishes, electrical, mechanical, sprinkler and life safety under separate permit. | $130,000 |