Elite Engineering Contractors
- Based in
- San Francisco
- On San Francisco permits
- Mar 2007 to Feb 2026
- Last 24 months
- 4 permits filed
15 permits since 2000: 7 completed, 6 in progress, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 4, 2026 | In progress issued Feb 2026 | 72 Harper St | revision to to pa 202303163798 documentation of existing and proposed gable roof slope tp 10:12 slope (correction from 9:12 roof slope); proposed bldg height increased from 30'-4 1/2" (approved) to 31'-7 1/2" above grade. note: no change to proposed demo, proposed scope of work, or project valuationDetails
revision to to pa 202303163798 documentation of existing and proposed gable roof slope tp 10:12 slope (correction from 9:12 roof slope); proposed bldg height increased from 30'-4 1/2" (approved) to 31'-7 1/2" above grade. note: no change to proposed demo, proposed scope of work, or project valuation | |
| Oct 29, 2025 | In progress issued Oct 2025 | 72 Harper St | revised permit to pa 202303163798 revision and/or removal of door and windows. infill 10 sf at the 3rd floor.Details
revised permit to pa 202303163798 revision and/or removal of door and windows. infill 10 sf at the 3rd floor. | |
| Oct 7, 2025 | In progress issued Oct 2025 | 72 Harper St | new rear yard retaining wall.Details
new rear yard retaining wall. | $30,000 |
| Apr 29, 2025 | In progress issued Apr 2025 | 1462 11th Av | revision to 202311201167: structural work increase at 1st fl foundation (north & east exterior walls) & area of interior concrete slab on grade replacementDetails
revision to 202311201167: structural work increase at 1st fl foundation (north & east exterior walls) & area of interior concrete slab on grade replacement | $61,488 |
| Dec 1, 2023 | In progress issued Oct 2024 | 1462 11th Av | 941 sf vert addition of (n) 3rd flr to incl: 3 bdrms,2 baths. (n)doors, wndws & skylites. int partition chnges @ 1st & 2nd flrs. (n)2nd fl blcny & stair to rear yd. 9sf court infill 2nd fl. relocate 1st fl mech equip. full seismic upgrd of bldg. rmdl entry hall at level 1. relocate garage door.Details
941 sf vert addition of (n) 3rd flr to incl: 3 bdrms,2 baths. (n)doors, wndws & skylites. int partition chnges @ 1st & 2nd flrs. (n)2nd fl blcny & stair to rear yd. 9sf court infill 2nd fl. relocate 1st fl mech equip. full seismic upgrd of bldg. rmdl entry hall at level 1. relocate garage door. | $450,000 |
| Mar 16, 2023 | In progress issued Jun 2024 | 72 Harper St | 3 story rear addition,convert 1st fl to adu,elevate portion of roof,interior partition changes on all fls,construct excavated rear yard light court,re-build front steps in kind to met egress code,install fire sprinkler stystem,full seismic upgrade of bldg,new fixtures fitting & finishes throughout.Details
3 story rear addition,convert 1st fl to adu,elevate portion of roof,interior partition changes on all fls,construct excavated rear yard light court,re-build front steps in kind to met egress code,install fire sprinkler stystem,full seismic upgrade of bldg,new fixtures fitting & finishes throughout. | $985,000 |
| Mar 26, 2018 | Expired or cancelled suspend Jul 2019 | 184 Lunado Wy | construct family room, (2) bedroom, media room, (2) full bath room & (1) powder room at g/f. remodel (e) kitchen, (2) bathroom & add (1) powder room. relocate interior staircase & construct (4) skylight at 2/f. upgrade partial (e) foundation.Details
construct family room, (2) bedroom, media room, (2) full bath room & (1) powder room at g/f. remodel (e) kitchen, (2) bathroom & add (1) powder room. relocate interior staircase & construct (4) skylight at 2/f. upgrade partial (e) foundation. | $180,000 |
| Dec 26, 2017 | Completed final sign-off Sep 2018 | 355 Highland Av | convert rear portion of garage to family room and half bath. maher naDetails
convert rear portion of garage to family room and half bath. maher na | $45,000 |
| Sep 23, 2015 | Completed final sign-off Oct 2016 | 168 Lunado Ct | to comply with comp. 201569141 - legalize 2 bedrooms, family room; remodel 1 (e) bedroom & bathroom & construct new bath room at ground floor; relocate (e) kitchen, convert kitchen into bedroom & bathroom. re-wire electrical and lighting at 2/f; remodel (e) bedroom and bath room @ 3rd flDetails
to comply with comp. 201569141 - legalize 2 bedrooms, family room; remodel 1 (e) bedroom & bathroom & construct new bath room at ground floor; relocate (e) kitchen, convert kitchen into bedroom & bathroom. re-wire electrical and lighting at 2/f; remodel (e) bedroom and bath room @ 3rd fl | $85,000 |
| Aug 27, 2015 | Completed final sign-off Feb 2016 | 721 San Bruno Av | revision to 9926483 and 201503302185 & 201302260953. construct laundry room at gr fl and interior staircase from gr fl up to 2nd flDetails
revision to 9926483 and 201503302185 & 201302260953. construct laundry room at gr fl and interior staircase from gr fl up to 2nd fl | $12,000 |
| Mar 30, 2015 | Completed final sign-off Feb 2016 | 721 San Bruno Av | to obtain final inspection for work approved under pa#9926483. all work is complete.Details
to obtain final inspection for work approved under pa#9926483. all work is complete. | |
| Mar 30, 2015 | Completed final sign-off Feb 2016 | 721 San Bruno Av | to obtain final inspection for work approved under pa#201205311598. al owrk is complete.Details
to obtain final inspection for work approved under pa#201205311598. al owrk is complete. | |
| Mar 30, 2015 | Completed final sign-off Mar 2016 | 721 San Bruno Av | to complete work and obtain final inspection for work approved under pa#201302260953.Details
to complete work and obtain final inspection for work approved under pa#201302260953. | $30,000 |
| Mar 30, 2007 | Expired or cancelled expired Dec 2019 | 1225 Dolores St | demolish 1 story storage garage.Details
demolish 1 story storage garage. | $2,000 |
| Mar 30, 2007 | Completed final sign-off Dec 2019 | 1225 Dolores St | to erect 4 stories, single family dwelling.Details
to erect 4 stories, single family dwelling. | $600,000 |