Elite Construction Company
- Based in
- San Bruno
- On San Francisco permits
- Oct 2008 to Mar 2013
- Last 24 months
- 0 permits filed
7 permits since 2000: 6 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 11, 2013 | Completed final sign-off Jul 2013 | 126 Everson St | remodel of bathroom, install shower/tub, and toilet vanity with sinkDetails
remodel of bathroom, install shower/tub, and toilet vanity with sink | $5,900 |
| Aug 4, 2011 | Completed final sign-off Sep 2011 | 570 Huron Av | gut existing bathroom, replace sheetrock, replace all tiles, and replace all plumbing fixtures. all (n) lighting must comply with cec 150(k)Details
gut existing bathroom, replace sheetrock, replace all tiles, and replace all plumbing fixtures. all (n) lighting must comply with cec 150(k) | $12,000 |
| Mar 15, 2011 | Completed final sign-off Apr 2011 | 132 Panorama Dr | replace 3 windows and one entry door. like for like. max u factor, .40Details
replace 3 windows and one entry door. like for like. max u factor, .40 | $6,500 |
| Aug 11, 2009 | Expired or cancelled withdrawn Nov 2009 | 190 Hanover St | stucco replacement on side exterior walls, replace same kind, no changesDetails
stucco replacement on side exterior walls, replace same kind, no changes | $20,000 |
| Jun 12, 2009 | Completed final sign-off Mar 2010 | 190 Hanover St | proposed conversion of non permitted living space to permitted living space. relocate bathroom, new water heater, furnace, new rear access to inside the house, new electrical. new staircase to access proposed living space.Details
proposed conversion of non permitted living space to permitted living space. relocate bathroom, new water heater, furnace, new rear access to inside the house, new electrical. new staircase to access proposed living space. | $40,000 |
| Nov 4, 2008 | Completed final sign-off Feb 2009 | 190 Hanover St | replace 2 wndws facing street like for like(inkind). remove wall and add beam in kitchen area. revision to app #200810073630Details
replace 2 wndws facing street like for like(inkind). remove wall and add beam in kitchen area. revision to app #200810073630 | $2,000 |
| Oct 7, 2008 | Completed final sign-off Feb 2009 | 190 Hanover St | 2nd floor. re-sheetrock & re-wire kitchen. replace windows in-kind. no change to wall door or exiting.Details
2nd floor. re-sheetrock & re-wire kitchen. replace windows in-kind. no change to wall door or exiting. | $92,000 |