Elemental Builders Incorporated
- Based in
- El Dorado Hills
- On San Francisco permits
- Jun 2025 to Sep 2026
- Last 24 months
- 13 permits filed
13 permits since 2000: 5 completed, 8 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 1, 2026 | In progress issued Sep 2026 | 2150 Fell St | unit 301: on the 4th floor, including relocate kitchen, new bedroom, in kind bahtroom renovation, new laundry, no structural, no exterior work and no change to areas or egress.Details
unit 301: on the 4th floor, including relocate kitchen, new bedroom, in kind bahtroom renovation, new laundry, no structural, no exterior work and no change to areas or egress. | $40,000 |
| Aug 31, 2026 | In progress issued Aug 2026 | 930 Post St | unit 14 -renovate interior unit like for like cabinets, flooring, countertops, interior finishes. add washer dryer all in one.Details
unit 14 -renovate interior unit like for like cabinets, flooring, countertops, interior finishes. add washer dryer all in one. | $40,000 |
| Aug 31, 2026 | In progress issued Aug 2026 | 701 Fell St | interior unit renovation like for like new cabinets, drywell, add dishwasher/laundry. rewire add new subpanel in common area accessible. new plumbing fixtures, appliancesDetails
interior unit renovation like for like new cabinets, drywell, add dishwasher/laundry. rewire add new subpanel in common area accessible. new plumbing fixtures, appliances | $40,000 |
| Aug 28, 2026 | In progress issued Aug 2026 | 55 Genoa Pl | private parking area: remove concrete where it failed, allowing water to pass to basement. waterproof deck and pour back concrete. 15x15 area (225 sf). topping slab only.Details
private parking area: remove concrete where it failed, allowing water to pass to basement. waterproof deck and pour back concrete. 15x15 area (225 sf). topping slab only. | $8,000 |
| Aug 26, 2026 | In progress issued Aug 2026 | 676 Greenwich St | revision to bpa# 202604229892, add partition wall at (2) door way, remove (2) doorsDetails
revision to bpa# 202604229892, add partition wall at (2) door way, remove (2) doors | $1,200 |
| Aug 17, 2026 | In progress issued Aug 2026 | 350 Judah St | commerical restaurant area: remove tile concrete and soil, to repair plumbing drain, back fill moisture barrier, rebar and pour concrete upon pipe fix. a seperate plumbing permit will be pulled for plumbing work. no electrical to be completed. all work is interior.Details
commerical restaurant area: remove tile concrete and soil, to repair plumbing drain, back fill moisture barrier, rebar and pour concrete upon pipe fix. a seperate plumbing permit will be pulled for plumbing work. no electrical to be completed. all work is interior. | $6,000 |
| Aug 3, 2026 | In progress issued Sep 2026 | 1106 Bush St | repair parapet wal where cracked and failed approx. 15 lf x 2 ft high. repair to converted to steel stud framed with denz glass.Details
repair parapet wal where cracked and failed approx. 15 lf x 2 ft high. repair to converted to steel stud framed with denz glass. | $6,000 |
| Jun 11, 2026 | Completed final sign-off Aug 2026 | 759 06th Av | to comply with nov# 202650804 items 2 and 5: stucco replacement at the front of building and staircase repair (less than 50% repair) at the rear.Details
to comply with nov# 202650804 items 2 and 5: stucco replacement at the front of building and staircase repair (less than 50% repair) at the rear. | $10,000 |
| Apr 22, 2026 | In progress issued Apr 2026 | 676 Greenwich St | interior renovation, new flooring, cabinets, plumbing trim, electrical trim, paint and flooring, renovation to be like for like in same location, new electrical sub panel to be installed.Details
interior renovation, new flooring, cabinets, plumbing trim, electrical trim, paint and flooring, renovation to be like for like in same location, new electrical sub panel to be installed. | $50,000 |
| Oct 20, 2025 | Completed final sign-off Jun 2026 | 621 03rd Av | construction addendum (revision) to permit 202509094908. add skylight in bathroom and open wall between kitchen and dining room.Details
construction addendum (revision) to permit 202509094908. add skylight in bathroom and open wall between kitchen and dining room. | $10,000 |
| Sep 9, 2025 | Completed final sign-off Jun 2026 | 621 03rd Av | renovate kitchen and bathrooms. no change to exterior.Details
renovate kitchen and bathrooms. no change to exterior. | $30,000 |
| Aug 25, 2025 | Completed final sign-off Oct 2025 | 2390 Francisco St | kitchen remodel in kind. approx. 90 sq ft.remove and install new cabinets & flooring. remove drywall for electrical and reinstall.Details
kitchen remodel in kind. approx. 90 sq ft.remove and install new cabinets & flooring. remove drywall for electrical and reinstall. | $35,000 |
| Jun 3, 2025 | Completed final sign-off Sep 2025 | 1555 Chestnut St | unit #31: remove and replace (1) kitchen cabinetry, (1) bathroom appliances bath valve vanity paint. move electrical sub panel out of closet to common area wall update finishes switch plug lighting.Details
unit #31: remove and replace (1) kitchen cabinetry, (1) bathroom appliances bath valve vanity paint. move electrical sub panel out of closet to common area wall update finishes switch plug lighting. | $30,000 |