Electric M D
- Based in
- La Honda
- On San Francisco permits
- Nov 2024 to Nov 2024
- Last 24 months
- 2 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 21, 2024 | Completed final sign-off Jan 2025 | 191 Gellert Dr | battery storage (1x ess)-29.2kwh. and batteries and two units powered from same temp sourceDetails
battery storage (1x ess)-29.2kwh. and batteries and two units powered from same temp source | $20,000 |
| Nov 18, 2024 | Completed final sign-off Dec 2024 | 201 Gellert Dr | battery storage system to provide temporary power to 2 residential dwelling units until pg&e energizes the building; 29.2 kwh; inverter (eg4 18 kpv) (rule 21, ca.approved); 2 batteries (eg4 pro 14.6 kwh 48 dclfp) (ul1973, ul954oa approved).Details
battery storage system to provide temporary power to 2 residential dwelling units until pg&e energizes the building; 29.2 kwh; inverter (eg4 18 kpv) (rule 21, ca.approved); 2 batteries (eg4 pro 14.6 kwh 48 dclfp) (ul1973, ul954oa approved). | $20,000 |