Eide Industries Inc
- Based in
- Cerritos
- On San Francisco permits
- Jul 2009 to Jul 2009
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 21, 2009 | Completed final sign-off Dec 2009 | 500 Post St | framed in fabric shade system installed at 21st floor open patio. horizontal operation with pleated fabric attached to pulleys . pulleys to travel along horizontal steel cables. cables to anchor to perimeter frame.Details
framed in fabric shade system installed at 21st floor open patio. horizontal operation with pleated fabric attached to pulleys . pulleys to travel along horizontal steel cables. cables to anchor to perimeter frame. | $20,000 |