Edl Construction Corp
- Based in
- Hayward
- On San Francisco permits
- Oct 2002 to Jul 2026
- Last 24 months
- 5 permits filed
39 permits since 2000: 36 completed, 2 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 23, 2026 | In progress issued Jul 2026 | 652 Duncan St | remodel primary bathroom like for like, all new tiles fixtures etc. remove stucco on wall facing street due to a leak over roofing drain-spout.Details
remodel primary bathroom like for like, all new tiles fixtures etc. remove stucco on wall facing street due to a leak over roofing drain-spout. | $40,000 |
| Jul 9, 2026 | In progress issued Jul 2026 | 652 Duncan St | a restroom remodel including new interior finishes., plumbing fixtures, and lighting. work also includes the proposed infill of an (e) lightwell to allow restroom expansion, with installation of a new fire rated skylight aboveDetails
a restroom remodel including new interior finishes., plumbing fixtures, and lighting. work also includes the proposed infill of an (e) lightwell to allow restroom expansion, with installation of a new fire rated skylight above | $60,000 |
| Feb 10, 2026 | Completed final sign-off Mar 2026 | 677 Duncan St | remove some stucco due to dry rot approxiamately 4'x8'0' on right side of kitchen window. like for like, street visible.Details
remove some stucco due to dry rot approxiamately 4'x8'0' on right side of kitchen window. like for like, street visible. | $9,000 |
| May 29, 2025 | Completed final sign-off Sep 2025 | 671 Duncan St | remodel of (e) 53 sq ft bathroom. scope includes demolition of existing finishes, relocation of toilet and sink, installation of new bathtub, shower valve, and lighting. work involves new plumbing and electrical. rough ins, moisture resistant drywall, cement boards at wet areasDetails
remodel of (e) 53 sq ft bathroom. scope includes demolition of existing finishes, relocation of toilet and sink, installation of new bathtub, shower valve, and lighting. work involves new plumbing and electrical. rough ins, moisture resistant drywall, cement boards at wet areas | $34,000 |
| Nov 6, 2024 | Completed final sign-off Sep 2025 | 670 Duncan St | remodel (2) bathrooms, master and guest bathroom like for like - includes new toilet, 1.25 gpm, (3) light fixtures, led, new shower valve etc. remodel kitchen like for like - new appliances. new cabinetry, new counter top/back splash.Details
remodel (2) bathrooms, master and guest bathroom like for like - includes new toilet, 1.25 gpm, (3) light fixtures, led, new shower valve etc. remodel kitchen like for like - new appliances. new cabinetry, new counter top/back splash. | $95,000 |
| Aug 23, 2024 | Completed final sign-off Sep 2025 | 670 Duncan St | repair foundation about 8'-6" between garage and main entrance.Details
repair foundation about 8'-6" between garage and main entrance. | $18,000 |
| Sep 12, 2023 | Completed final sign-off Dec 2024 | 664 Duncan St | add additional foundation at front covered entry per drawings in including section of shear wall. existing permit issued for stucco replacement (202304185898)Details
add additional foundation at front covered entry per drawings in including section of shear wall. existing permit issued for stucco replacement (202304185898) | $25,000 |
| Apr 18, 2023 | Completed final sign-off Jun 2024 | 664 Duncan St | remove & replace 3-windows, stucco on entire front proposed wood aluminum clad windowsDetails
remove & replace 3-windows, stucco on entire front proposed wood aluminum clad windows | $65,000 |
| Mar 27, 2019 | Completed final sign-off Jul 2019 | 73 Oakwood St | all work in unit# 73: install new cabinets like for like. upgrade electrical by installing 2/3 dedicated circuits for gfci plugs. install hood and duct pipes. everything is like for like. no structural work.Details
all work in unit# 73: install new cabinets like for like. upgrade electrical by installing 2/3 dedicated circuits for gfci plugs. install hood and duct pipes. everything is like for like. no structural work. | $30,000 |
| Mar 27, 2019 | Completed final sign-off Jul 2019 | 71 Oakwood St | all work in unit# 71: install new cabinets like for like. upgrade electrical by installing 2/3 dedicated circuits for gfci plugs. install hood and duct pipes. everything is like for like. no structural work.Details
all work in unit# 71: install new cabinets like for like. upgrade electrical by installing 2/3 dedicated circuits for gfci plugs. install hood and duct pipes. everything is like for like. no structural work. | $25,000 |
| Jul 17, 2017 | Completed final sign-off Aug 2017 | 408 Franconia St | in-kind replacement of the upper portion of the siding on the front facade (individual board lengths) due to water damageDetails
in-kind replacement of the upper portion of the siding on the front facade (individual board lengths) due to water damage | $7,000 |
| Jan 25, 2017 | Completed final sign-off May 2017 | 3315 22nd St | remove and replace (2) windows. (1) at 2nd floor 36" x 60" and (1) at 1st floor 60" x 48"Details
remove and replace (2) windows. (1) at 2nd floor 36" x 60" and (1) at 1st floor 60" x 48" | $1,800 |
| Jul 14, 2016 | Completed final sign-off Dec 2016 | 408 Franconia St | remove and replace windows and sliding doors. 8 windows in the front - 2 windows at the back - 2 sliding doors in the back. the front windows will be wood aluminum clad windows. u factor not > .32Details
remove and replace windows and sliding doors. 8 windows in the front - 2 windows at the back - 2 sliding doors in the back. the front windows will be wood aluminum clad windows. u factor not > .32 | $18,000 |
| Jul 14, 2016 | Completed final sign-off Jan 2017 | 408 Franconia St | remodel (2) full bathroom and 1-1/2 baths; install 3/fans, remove/replace siding on the back of a houseDetails
remodel (2) full bathroom and 1-1/2 baths; install 3/fans, remove/replace siding on the back of a house | $60,000 |
| Dec 20, 2013 | Completed final sign-off Jan 2014 | 1510 Pacific Av | to comply with notice of violation #201333261.Details
to comply with notice of violation #201333261. | $7,000 |
| Apr 14, 2011 | Completed final sign-off Jul 2011 | 1575 South Van Ness Av | comply w/ dcp nov east billboard sign.Details
comply w/ dcp nov east billboard sign. | $1,000 |
| Apr 14, 2011 | Completed final sign-off May 2011 | 476 05th St | west face. comply w/ dcp nov west bullboard sign. see other bpa 2011/04/14/4036 for east face, see other bpa 2011/04/14/4036.Details
west face. comply w/ dcp nov west bullboard sign. see other bpa 2011/04/14/4036 for east face, see other bpa 2011/04/14/4036. | $1,000 |
| Apr 14, 2011 | Completed final sign-off May 2011 | 476 05th St | east face - comply w/ dcp nov 10772. see other bpa for west face - 2011-0414-4037.Details
east face - comply w/ dcp nov 10772. see other bpa for west face - 2011-0414-4037. | $1,000 |
| Oct 22, 2010 | Completed final sign-off Dec 2010 | 245 Westgate Dr | remove bricks, membrane, some stucco 10" to 12" for the installation of new membrane, install new bricks to match existing stairsDetails
remove bricks, membrane, some stucco 10" to 12" for the installation of new membrane, install new bricks to match existing stairs | $7,800 |
| Oct 13, 2010 | Expired or cancelled cancelled Jan 2026 | 3156 24th St | removed illegal unit on 1st floor as well as the kitchen. rooms (storage rooms) which are to be removed are show on plans a, follow upon pa# 2010-0415-0338Details
removed illegal unit on 1st floor as well as the kitchen. rooms (storage rooms) which are to be removed are show on plans a, follow upon pa# 2010-0415-0338 | $4,000 |
| May 28, 2010 | Completed final sign-off Oct 2010 | 140 Paloma Av | remove some stucco and replace it to match extg due to some dryrot. as well repair dryrot as need on the back of the house. stucco area = 8x10 approx. no structural and no replacement of studs.Details
remove some stucco and replace it to match extg due to some dryrot. as well repair dryrot as need on the back of the house. stucco area = 8x10 approx. no structural and no replacement of studs. | $3,000 |
| May 19, 2010 | Completed final sign-off Oct 2010 | 140 Paloma Av | remodel (e) bathroom, install new toilet, vanity, shower head, upgrade electrical to gfci, install 2 new dedicated circuits. upgrade plumbing. install new fan for bathroomDetails
remodel (e) bathroom, install new toilet, vanity, shower head, upgrade electrical to gfci, install 2 new dedicated circuits. upgrade plumbing. install new fan for bathroom | $13,000 |
| May 19, 2010 | Completed final sign-off Jul 2010 | 3156 24th St | permit to comply with violation #201043278. removed wooden ladder.Details
permit to comply with violation #201043278. removed wooden ladder. | $600 |
| May 19, 2010 | Completed final sign-off Jul 2010 | 508 Judah St | remove & replace 4 windows, repair some dry rot & finish paintDetails
remove & replace 4 windows, repair some dry rot & finish paint | $12,000 |
| Apr 22, 2010 | Completed final sign-off Dec 2010 | 419 Joost Av | remove existing deck and stairs in rear. construct new deck and stairs with 2 levels in rear. replace existing slab and retaining wall with new concrete retaining wallDetails
remove existing deck and stairs in rear. construct new deck and stairs with 2 levels in rear. replace existing slab and retaining wall with new concrete retaining wall | $32,879 |
| Apr 15, 2010 | Completed final sign-off Jul 2010 | 419 Joost Av | remove some stucco & repair by front window and repair if there is any wood member damaged due to dry rotDetails
remove some stucco & repair by front window and repair if there is any wood member damaged due to dry rot | $1,500 |
| Apr 15, 2010 | Completed final sign-off Apr 2011 | 3158 24th St | correct 2 violations, 200724210 dtd, 10-11-07, and 200004229 dtd 4-24-2000, demo playroom with kitchen & bathrm in order to comply, as well as to comply with novDetails
correct 2 violations, 200724210 dtd, 10-11-07, and 200004229 dtd 4-24-2000, demo playroom with kitchen & bathrm in order to comply, as well as to comply with nov | $2,000 |
| Oct 22, 2009 | Completed final sign-off Nov 2009 | 1888 Church St | repair 2/3 pieces of siding including block for min joist. remove and replace (2) 2x6 top plates 8' long. remove several boards from landing and replace. not visible from the street.Details
repair 2/3 pieces of siding including block for min joist. remove and replace (2) 2x6 top plates 8' long. remove several boards from landing and replace. not visible from the street. | $1,500 |
| Jan 6, 2009 | Completed final sign-off Apr 2009 | 1883 Church St | upgrade electrical in whole interior. install new 220-amps panel. removal of wall only for electricy. install new furnace, new cabinets, new appliance for 1 kitchen. 1 bath tub, shower, head, repair 6 x 16 siding that has dry rot @ side of house. in kind. install insulation & 1/2" sheetrock onDetails
upgrade electrical in whole interior. install new 220-amps panel. removal of wall only for electricy. install new furnace, new cabinets, new appliance for 1 kitchen. 1 bath tub, shower, head, repair 6 x 16 siding that has dry rot @ side of house. in kind. install insulation & 1/2" sheetrock on | $40,000 |
| Jun 26, 2007 | Completed final sign-off Aug 2007 | 3315 22nd St | remove & replace bathtub, install 1/2 inch wonder board & install tile on walls. install new shower head water valance.Details
remove & replace bathtub, install 1/2 inch wonder board & install tile on walls. install new shower head water valance. | $3,100 |
| Apr 4, 2007 | Completed final sign-off May 2007 | 819 Ocean Av | existing deck at back of house. due to dryrot, replace in kind. replace existing deck means of 2nd egress, less 50% requiredDetails
existing deck at back of house. due to dryrot, replace in kind. replace existing deck means of 2nd egress, less 50% required | $9,000 |
| Oct 13, 2006 | Completed final sign-off Dec 2006 | 245 Westgate Dr | remove & replace shower pan. also remove & replace shower head. remove tile from walls & replace. no changes to partition.Details
remove & replace shower pan. also remove & replace shower head. remove tile from walls & replace. no changes to partition. | $5,300 |
| Jul 20, 2006 | Completed final sign-off Sep 2006 | 109 Dalewood Wy | remove tile & reinstall also replace shower value.Details
remove tile & reinstall also replace shower value. | $5,000 |
| Jan 27, 2006 | Completed final sign-off Mar 2006 | 2266 48th Av | install 1/2 bath on proposed area show on plans. 2nd floor.Details
install 1/2 bath on proposed area show on plans. 2nd floor. | $4,500 |
| Jul 8, 2005 | Completed final sign-off Aug 2005 | 174 Southwood Dr | remove & replace window, bathum, upgrade gfi & install fan with light, replace service panel.Details
remove & replace window, bathum, upgrade gfi & install fan with light, replace service panel. | $12,000 |
| Jun 22, 2005 | Completed final sign-off Nov 2005 | 2266 48th Av | replace kitchen cabinets,appl,upgrade electrical plumb also remove 1 window on kitchen.garage area..Details
replace kitchen cabinets,appl,upgrade electrical plumb also remove 1 window on kitchen.garage area.. | $24,000 |
| Jan 21, 2005 | Completed final sign-off Mar 2005 | 744 24th Av | install washer/dryer,install 220-110 electrical plumbing for washer & vents in (e) bathroom,Details
install washer/dryer,install 220-110 electrical plumbing for washer & vents in (e) bathroom, | $2,800 |
| Sep 10, 2004 | Completed final sign-off Mar 2005 | 4156 22nd St | remodel a bthrm install 1 pocket door replace tub/fuacet & toilet/install skylight at dng roomDetails
remodel a bthrm install 1 pocket door replace tub/fuacet & toilet/install skylight at dng room | $22,000 |
| Oct 22, 2002 | Completed final sign-off Dec 2002 | 819 Ocean Av | bathroom remodel,tile replacement,small amount of sheetrock,bathtub toilet & repair some dry (if anyDetails
bathroom remodel,tile replacement,small amount of sheetrock,bathtub toilet & repair some dry (if any | $6,000 |