Econoquality Inc
- Based in
- San Francisco
- On San Francisco permits
- Dec 2009 to Jul 2013
- Last 24 months
- 0 permits filed
37 permits since 2000: 33 completed, 4 never finaled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 12, 2013 | Completed final sign-off Nov 2013 | 1034 Treat Av | tearing out or demo of kitchen and bathroom, remove debris such as plaster, tile and debris. demo work only, remodel kitchen & bath under seperate permit.Details
tearing out or demo of kitchen and bathroom, remove debris such as plaster, tile and debris. demo work only, remodel kitchen & bath under seperate permit. | $6,000 |
| Jun 7, 2013 | Completed final sign-off May 2014 | 615 Union St | to comply with ordinance 029-13 only; installation of grab bars in sro at the following location(s): 2nd fl: 3 bars in shower & 4 bars in the toilet; 3rd fl: 3 bars in shower & 4 bars in the toilet.Details
to comply with ordinance 029-13 only; installation of grab bars in sro at the following location(s): 2nd fl: 3 bars in shower & 4 bars in the toilet; 3rd fl: 3 bars in shower & 4 bars in the toilet. | $800 |
| Jun 7, 2013 | Completed final sign-off Apr 2014 | 166 Turk St | to comply with ordinance 029-13 only; installation of grab bars in sro at the following location(s): 4 toilet rooms & 4 bathrooms. total grab bars installed: 8Details
to comply with ordinance 029-13 only; installation of grab bars in sro at the following location(s): 4 toilet rooms & 4 bathrooms. total grab bars installed: 8 | $700 |
| Jun 7, 2013 | Completed final sign-off May 2014 | 1048 Larkin St | to comply with ordinance 029-13 only; installation of grab bars in sro at the following location(s): 4 bars in toilet rooms; 3 bars in shower rooms; 3 bars in rooms with bathrooms. total grab bars installed: 10Details
to comply with ordinance 029-13 only; installation of grab bars in sro at the following location(s): 4 bars in toilet rooms; 3 bars in shower rooms; 3 bars in rooms with bathrooms. total grab bars installed: 10 | $900 |
| Jun 7, 2013 | Completed final sign-off Jul 2013 | 1715 Newcomb Av | comply with complaint #200565425-demolition of kitchen & bathroom on ground floor,revert pack to storageDetails
comply with complaint #200565425-demolition of kitchen & bathroom on ground floor,revert pack to storage | $15,000 |
| Jun 7, 2013 | Never finaled issued Jun 2013, no final | 556 Jones St | to comply with ordinance 029-13 only; installation of grab bars in sro at the following location(s): 40 bathrooms with toilet & 1 bathroom in manager unit. total grab bars installed: 41Details
to comply with ordinance 029-13 only; installation of grab bars in sro at the following location(s): 40 bathrooms with toilet & 1 bathroom in manager unit. total grab bars installed: 41 | $3,000 |
| May 15, 2013 | Completed final sign-off Jun 2013 | 1715 Newcomb Av | to comply with nov# 201396211 #1-17Details
to comply with nov# 201396211 #1-17 | $1,000 |
| Sep 4, 2012 | Completed final sign-off Jul 2013 | 393 Warren Dr | interior renovation first level behind garage. new bedroom, bathroom and living room. new window and sliding glass door. extg stair to 2nd floor to remain.Details
interior renovation first level behind garage. new bedroom, bathroom and living room. new window and sliding glass door. extg stair to 2nd floor to remain. | $58,000 |
| Aug 29, 2012 | Completed final sign-off May 2013 | 506 Grove St | ground floor only-remove (e) non bearing walls, partition walls, remove (e) doors, new tile floor, new washer/dryer units. new hot/cold water supply. new electrical sub panel, 4 new electrical 20 amp outletsDetails
ground floor only-remove (e) non bearing walls, partition walls, remove (e) doors, new tile floor, new washer/dryer units. new hot/cold water supply. new electrical sub panel, 4 new electrical 20 amp outlets | $8,000 |
| Jun 18, 2012 | Completed final sign-off Jun 2012 | 1286 South Van Ness Av | install new door closet, fix window in kind. max u factor is 0.40. stair less than 50% in kind to dry rotted. install new dead bolt to comply with complaint his #201144401.Details
install new door closet, fix window in kind. max u factor is 0.40. stair less than 50% in kind to dry rotted. install new dead bolt to comply with complaint his #201144401. | $3,000 |
| Jun 14, 2012 | Completed final sign-off Nov 2012 | 393 Warren Dr | remodel ktichen and bathrooms (2); no lighting changeDetails
remodel ktichen and bathrooms (2); no lighting change | $18,000 |
| Jun 1, 2012 | Never finaled issued Jun 2012, no final | 3475 16th St | to obtain final inspection for work approved under pa # 200912103030. all work is complete.Details
to obtain final inspection for work approved under pa # 200912103030. all work is complete. | $6,000 |
| May 8, 2012 | Completed final sign-off Jul 2012 | 2337 Market St | remove atm machine to abate nov #201109483Details
remove atm machine to abate nov #201109483 | $1,000 |
| Mar 22, 2012 | Completed final sign-off Jul 2012 | 935 Sutter St | #56- remodeling kitchen and bathroom, no doors, windows, walls under this permit, co. alarms are required per cbc-2010 section 420.4Details
#56- remodeling kitchen and bathroom, no doors, windows, walls under this permit, co. alarms are required per cbc-2010 section 420.4 | $19,000 |
| Jan 10, 2012 | Completed final sign-off Apr 2012 | 1771 37th Av | remodel kitchen.Details
remodel kitchen. | $10,000 |
| Feb 2, 2011 | Completed final sign-off May 2011 | 1225 Pine St | remodel 1 kitchen and 1 bath. no change to walls, window, door. elec , new subpanel lighting to comply with cec 150 kDetails
remodel 1 kitchen and 1 bath. no change to walls, window, door. elec , new subpanel lighting to comply with cec 150 k | $16,000 |
| Feb 2, 2011 | Completed final sign-off Apr 2011 | 1225 Pine St | remodel kitchen and 1 bath. elec new subpanel. no change to wall, window,doors. lighting to comply cec 150kDetails
remodel kitchen and 1 bath. elec new subpanel. no change to wall, window,doors. lighting to comply cec 150k | $16,000 |
| Nov 16, 2010 | Completed final sign-off Aug 2011 | 1345 Clement St | install 2 washers & dryers in (e) storage room on 1st floor (ground fl)Details
install 2 washers & dryers in (e) storage room on 1st floor (ground fl) | $7,500 |
| Oct 21, 2010 | Completed final sign-off Oct 2010 | 3425 19th St | repair the deck. (change old bolts, replace or put sister. repair in kind. not visible from street at rear of the building.Details
repair the deck. (change old bolts, replace or put sister. repair in kind. not visible from street at rear of the building. | $1,500 |
| Oct 14, 2010 | Completed final sign-off Dec 2010 | 990 Bay St | interior renovation of unit #405-remodel kitchen, relocate walls, no exterior work. replace all windows in kind ( no structural). convert (e) dining room to bedroom. window replacement about 10 windows. same sizeDetails
interior renovation of unit #405-remodel kitchen, relocate walls, no exterior work. replace all windows in kind ( no structural). convert (e) dining room to bedroom. window replacement about 10 windows. same size | $20,000 |
| Sep 24, 2010 | Never finaled issued Sep 2010, no final | 230 Oak St | close off door opening in bedroom in unit #26. revision to bpa#201009100622.Details
close off door opening in bedroom in unit #26. revision to bpa#201009100622. | $2,000 |
| Sep 22, 2010 | Completed final sign-off Jan 2011 | 1225 Pine St | unit #14-remodel 1 bathroom & kitchen, new wiring in whole unit. maintain fire resistivness of rated wall assembles. lighting to comply with cec 150(k)Details
unit #14-remodel 1 bathroom & kitchen, new wiring in whole unit. maintain fire resistivness of rated wall assembles. lighting to comply with cec 150(k) | $28,000 |
| Sep 22, 2010 | Completed final sign-off Jan 2011 | 1225 Pine St | unit #7-remodel 1 bathroom & kitchen, new wiring in whole unit. maintain fire resistivness of rated wall assembles. lighting to comply with cec 150(k)Details
unit #7-remodel 1 bathroom & kitchen, new wiring in whole unit. maintain fire resistivness of rated wall assembles. lighting to comply with cec 150(k) | $28,000 |
| Sep 10, 2010 | Completed final sign-off Nov 2010 | 230 Oak St | unit #26-kitchen & bathroom remodel, no moving or adding wallsDetails
unit #26-kitchen & bathroom remodel, no moving or adding walls | $18,000 |
| Aug 11, 2010 | Completed final sign-off Oct 2010 | 1745 Franklin St | unit #302-remodel kitchen & bathroom-new countertop, cabinets, new appliances, new lighting, new flooring & vanity. bathroom: new vanity, new toilet, new flooring. no change to exhaust system, kitchen sq ft 12x12, bathroom sq ft 5x7Details
unit #302-remodel kitchen & bathroom-new countertop, cabinets, new appliances, new lighting, new flooring & vanity. bathroom: new vanity, new toilet, new flooring. no change to exhaust system, kitchen sq ft 12x12, bathroom sq ft 5x7 | $25,537 |
| May 17, 2010 | Completed final sign-off Oct 2010 | 43 Cole St | remodel kitchen & bathroom. no remval of walls. no structural work. in-kind.Details
remodel kitchen & bathroom. no remval of walls. no structural work. in-kind. | $18,000 |
| May 13, 2010 | Completed final sign-off Sep 2010 | 137 Clifford Tr | unit # 3; amend pa #201001154857. drywall approximately 4,500 sq. feet ceiling and walls. 5/8" type x. per building inspector's request of 5/12/10 - unit #3. work in bedroom, living room, kitchen and bathroom.Details
unit # 3; amend pa #201001154857. drywall approximately 4,500 sq. feet ceiling and walls. 5/8" type x. per building inspector's request of 5/12/10 - unit #3. work in bedroom, living room, kitchen and bathroom. | $4,000 |
| May 12, 2010 | Completed final sign-off Feb 2011 | 990 Bay St | unit #305: interior renovation, remodel kitchen, relocate walls (non-structural, non-bearing & not plywood shear wall). replace all windows in kind, visible from street. convert existing dining room to bedroom.Details
unit #305: interior renovation, remodel kitchen, relocate walls (non-structural, non-bearing & not plywood shear wall). replace all windows in kind, visible from street. convert existing dining room to bedroom. | $28,000 |
| Apr 5, 2010 | Completed final sign-off Jun 2010 | 830 Hayes St | unit #305 - remodel (e) bathroom & kitchen: replace counter, cabinet & fixtures. all work at third floor. replace plumbing fixtures & retile the floor & walls @ one bathroom. no structural work or wall relocation.Details
unit #305 - remodel (e) bathroom & kitchen: replace counter, cabinet & fixtures. all work at third floor. replace plumbing fixtures & retile the floor & walls @ one bathroom. no structural work or wall relocation. | $15,000 |
| Apr 2, 2010 | Completed final sign-off Jul 2010 | 1664 Fell St | remodel kitchen replace cabinets. remove non-bearing wall. no structural work.Details
remodel kitchen replace cabinets. remove non-bearing wall. no structural work. | $14,000 |
| Mar 25, 2010 | Completed final sign-off Jun 2011 | 2826 Jennings St | abate complaint #200449317 & #200453671. remodel (e) bathroom. replace heating unit, fix crack & paint living room.Details
abate complaint #200449317 & #200453671. remodel (e) bathroom. replace heating unit, fix crack & paint living room. | $19,000 |
| Mar 25, 2010 | Completed final sign-off Aug 2010 | 1306 Fitzgerald Av | remodel residential unit @ 2nd. flr. replace furnace, insulate perimeter walls, replace all exterior windows. remodel bathroom & kitchen.Details
remodel residential unit @ 2nd. flr. replace furnace, insulate perimeter walls, replace all exterior windows. remodel bathroom & kitchen. | $35,000 |
| Mar 9, 2010 | Completed final sign-off Feb 2011 | 990 Bay St | interior renovation of unit 102 (2nd fl) remodel kitchen, relocate walls. non structural. replace 10 windows. visible from street. replace in kind wood windows. convert e dining room to bedroomDetails
interior renovation of unit 102 (2nd fl) remodel kitchen, relocate walls. non structural. replace 10 windows. visible from street. replace in kind wood windows. convert e dining room to bedroom | $25,000 |
| Mar 9, 2010 | Completed final sign-off Feb 2011 | 990 Bay St | interior renovation of unit 101,2nd fl. remodel kitchen, relocate non structural walls. replace 6 windows, wood windows in kind, visible from street. new full bath. convert existing dining room to bedroomDetails
interior renovation of unit 101,2nd fl. remodel kitchen, relocate non structural walls. replace 6 windows, wood windows in kind, visible from street. new full bath. convert existing dining room to bedroom | $25,000 |
| Jan 15, 2010 | Completed final sign-off Sep 2010 | 137 Clifford Tr | remodel kitchen & bathroom, change ceiling in room & paintDetails
remodel kitchen & bathroom, change ceiling in room & paint | $14,000 |
| Dec 10, 2009 | Never finaled issued Dec 2009, no final | 3475 16th St | kitchen remodel unit 12, cabinets, countertops, no structural or new lightingDetails
kitchen remodel unit 12, cabinets, countertops, no structural or new lighting | $6,000 |
| Dec 7, 2009 | Completed final sign-off Dec 2009 | 835 Hyde St | replace partial section in the roof by approximately 8'x8'. repair part of deck. fix wall exterior near to deck. repair walls, ceiling in the stairs. (change sheetrock, tapping & painting) due to fire damaged.Details
replace partial section in the roof by approximately 8'x8'. repair part of deck. fix wall exterior near to deck. repair walls, ceiling in the stairs. (change sheetrock, tapping & painting) due to fire damaged. | $7,000 |