Ecocosm
- Based in
- Napa
- On San Francisco permits
- Jun 2014 to Jun 2014
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 17, 2014 | Expired or cancelled cancelled Jan 2026 | 2601 Mission St | installation of new cooling tower with new vfd, install vfd on fan, reconnect existing electrical to new cooling tower, reconnect existing supply and return piping to new cooling towerDetails
installation of new cooling tower with new vfd, install vfd on fan, reconnect existing electrical to new cooling tower, reconnect existing supply and return piping to new cooling tower | $74,149 |