- 3 permits filed
55 permits since 2000: 44 completed, 1 in progress, 10 never finaled.
Of the 10 never-finaled permits, 2 are 3 to 5 years old, 8 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 22, 2026 | Completed final sign-off Jun 2026 | 73 Santa Paula Av | reroofing - no torch down. replacement of top roofing system in kind with gaf hd2 preminum shingles. solar roof replacement (solar stand off waterproofing)Details
reroofing - no torch down. replacement of top roofing system in kind with gaf hd2 preminum shingles. solar roof replacement (solar stand off waterproofing) | $93,520 |
| Mar 6, 2026 | Completed final sign-off Jul 2026 | 770 North Point St | partial top roofing repair and reinforcement as needed, repair of upper concrete half walls at top roof. repair of back wall (concrete) by patching, crystalize and spacing. restoration of original windows in back (sanding, priming, painting) roof sealing is outside of scope of this permit.Details
partial top roofing repair and reinforcement as needed, repair of upper concrete half walls at top roof. repair of back wall (concrete) by patching, crystalize and spacing. restoration of original windows in back (sanding, priming, painting) roof sealing is outside of scope of this permit. | $198,500 |
| Jun 2, 2025 | Completed final sign-off Dec 2025 | 155 25th Av | bathroom remodling in kind. installation of shower pan, tile, sink, toilet and mirror, primarily and partially as necessary. install glass shower enclose and fan. replace ceiling light fixture. approx. 50 sq ft.Details
bathroom remodling in kind. installation of shower pan, tile, sink, toilet and mirror, primarily and partially as necessary. install glass shower enclose and fan. replace ceiling light fixture. approx. 50 sq ft. | $65,000 |
| Jul 15, 2024 | In progress filed Jul 2024, not yet issued | 70 Santa Rita Av | rev 202212279154-replacement of front balcony system with railings finishes and stucco system including tile installation and structural reinformenet according to plansDetails
rev 202212279154-replacement of front balcony system with railings finishes and stucco system including tile installation and structural reinformenet according to plans | |
| May 20, 2024 | Completed final sign-off Jun 2024 | 716 Funston Av | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $72,600 |
| Oct 12, 2023 | Completed final sign-off Mar 2024 | 180 12th St | removal of existing 2-oversized skylights and re-framing ceiling joists according to plans, installation of 4-skylights per big opening. roofing and painting to match existing skylights, total is 8 composed of galvanized steel and mesh glass.Details
removal of existing 2-oversized skylights and re-framing ceiling joists according to plans, installation of 4-skylights per big opening. roofing and painting to match existing skylights, total is 8 composed of galvanized steel and mesh glass. | $78,130 |
| Aug 28, 2023 | Completed final sign-off Oct 2023 | 2941 Geary Bl | repair of back upper wall, removal of damaged metal sheathing & installation of (n) fiber cement siding w/ (n) waterproofing membrane followed by trims & casings out of fiber center. invisible street - back upper wallDetails
repair of back upper wall, removal of damaged metal sheathing & installation of (n) fiber cement siding w/ (n) waterproofing membrane followed by trims & casings out of fiber center. invisible street - back upper wall | $56,130 |
| Aug 21, 2023 | Completed final sign-off Sep 2023 | 2941 Geary Bl | reroofing. use gaf energy cote roof coating to comply with commercial insDetails
reroofing. use gaf energy cote roof coating to comply with commercial ins | $79,210 |
| Aug 21, 2023 | Completed final sign-off Sep 2023 | 441 Waller St | reroofingDetails
reroofing | $76,210 |
| Aug 14, 2023 | Completed final sign-off Aug 2023 | 1977 15th St | re-roofing.Details
re-roofing. | $57,710 |
| Apr 11, 2023 | Completed final sign-off May 2023 | 366 Sawyer St | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $52,360 |
| Dec 27, 2022 | Never finaled issued Dec 2022, no final | 70 Santa Rita Av | removal/replace all (e)stucco system around bldg, repair all damaged framing, sections of top roof system, install new waterproofing membrane, volunary structural reinforcement/plans, reinstall/replace front & back deck less than 50%Details
removal/replace all (e)stucco system around bldg, repair all damaged framing, sections of top roof system, install new waterproofing membrane, volunary structural reinforcement/plans, reinstall/replace front & back deck less than 50% | $956,250 |
| Dec 18, 2022 | Completed final sign-off Dec 2022 | 3233 Noriega St | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $62,204 |
| Aug 5, 2022 | Completed final sign-off Aug 2022 | 875 South Van Ness Av | reroofingDetails
reroofing | $73,585 |
| May 11, 2022 | Completed final sign-off Dec 2022 | 2554 27th Av | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $46,090 |
| Mar 2, 2022 | Completed final sign-off Jan 2023 | 531 05th Av | reroofingDetails
reroofing | $69,320 |
| Feb 23, 2022 | Completed final sign-off Dec 2022 | 585 Crestlake Dr | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $53,000 |
| Feb 10, 2022 | Completed final sign-off Dec 2022 | 1240 Diamond St | reroofingDetails
reroofing | $65,210 |
| Feb 10, 2022 | Completed final sign-off Dec 2022 | 180 12th St | reroofingDetails
reroofing | $164,210 |
| Jan 13, 2022 | Completed final sign-off Jan 2023 | 2516 Pacific Av | replacement of the membrane at back deck system with a 3-ply layer over system with new flashings and re-installation of back deck as is using trex decking system. all work invisbile from street.Details
replacement of the membrane at back deck system with a 3-ply layer over system with new flashings and re-installation of back deck as is using trex decking system. all work invisbile from street. | $250,000 |
| Dec 1, 2021 | Completed final sign-off Dec 2022 | 24 Clarendon Av | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $29,280 |
| Nov 23, 2021 | Never finaled issued Nov 2021, no final | 2516 Pacific Av | reroofingDetails
reroofing | $85,820 |
| Nov 23, 2021 | Completed final sign-off Dec 2021 | 1802 Scott St | reroofingDetails
reroofing | $58,120 |
| Nov 3, 2021 | Completed final sign-off Dec 2022 | 41 Grattan St | reroofingDetails
reroofing | $39,985 |
| Nov 3, 2021 | Completed final sign-off Dec 2021 | 44 Vasquez Av | reroofingDetails
reroofing | $57,310 |
| Nov 2, 2021 | Completed final sign-off Dec 2022 | 182 Nevada St | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $29,300 |
| Jul 14, 2021 | Completed final sign-off Nov 2021 | 2184 Funston Av | replacement of all damaged fromt wood siding sheath with new sheathing trims & casings using fiber cement siding sheathing. to look identical to existing visual profile. prome & paint. new front membrane.Details
replacement of all damaged fromt wood siding sheath with new sheathing trims & casings using fiber cement siding sheathing. to look identical to existing visual profile. prome & paint. new front membrane. | $198,560 |
| Jul 14, 2021 | Completed final sign-off Jul 2021 | 19 Santa Rita Av | reroofingDetails
reroofing | $96,320 |
| Jul 6, 2021 | Completed final sign-off Dec 2022 | 775 38th Av | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $37,240 |
| May 19, 2021 | Never finaled issued May 2021, no final | 329 Waller St | reroofingDetails
reroofing | $31,300 |
| May 19, 2021 | Never finaled issued May 2021, no final | 757 07th Av | reroofingDetails
reroofing | $37,600 |
| Mar 4, 2021 | Never finaled issued Mar 2021, no final | 70 Santa Rita Av | replacement of dryrot damange and replce of stucoo stystem as-is in the back & front sectionds of building (repair).Details
replacement of dryrot damange and replce of stucoo stystem as-is in the back & front sectionds of building (repair). | $93,650 |
| Mar 4, 2021 | Completed final sign-off Nov 2021 | 155 25th Av | limited to front lower sections of building: replace damaged stucco system, repair of dryrot as-is, replace damaged staircase and landings as-is. prime & paint.Details
limited to front lower sections of building: replace damaged stucco system, repair of dryrot as-is, replace damaged staircase and landings as-is. prime & paint. | $215,350 |
| Dec 20, 2020 | Never finaled issued Dec 2020, no final | 1962 19th Av | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $35,380 |
| Dec 3, 2020 | Never finaled issued Dec 2020, no final | 766 32nd Av | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $35,380 |
| Oct 14, 2020 | Never finaled issued Oct 2020, no final | 551 25th Av | dry rot repair of to back deck, repair of dry rot at center back deck & stair case, repair dry rot at lower ack deck & installation of plastic decking system on all decks, remove poisioned earthDetails
dry rot repair of to back deck, repair of dry rot at center back deck & stair case, repair dry rot at lower ack deck & installation of plastic decking system on all decks, remove poisioned earth | $21,350 |
| Oct 14, 2020 | Never finaled issued Oct 2020, no final | 563 Munich St | reroofingDetails
reroofing | $34,200 |
| Aug 20, 2020 | Completed final sign-off Dec 2020 | 933 Wisconsin St | reroofing of top section of building roof, invisible from street in kind with new solar ready roof consisting of bitumen down systemDetails
reroofing of top section of building roof, invisible from street in kind with new solar ready roof consisting of bitumen down system | $36,830 |
| Aug 20, 2020 | Completed final sign-off Dec 2020 | 144 Hernandez Av | reroofing of top section of buildings roof inkind with new roofing system solar consisting of bitumen torch down roofing systemDetails
reroofing of top section of buildings roof inkind with new roofing system solar consisting of bitumen torch down roofing system | $41,230 |
| Aug 14, 2020 | Never finaled issued Aug 2020, no final | 162 Lower Tr | replacement of top roofing system invisible from street with new, solar roofing system in kind. bitumen toruch down 3 ply systemDetails
replacement of top roofing system invisible from street with new, solar roofing system in kind. bitumen toruch down 3 ply system | $33,210 |
| Aug 12, 2020 | Completed final sign-off Dec 2020 | 846 Niagara Av | reroofing. replace flat roofing system in-kind w/ new bitumen. install solar ready system.Details
reroofing. replace flat roofing system in-kind w/ new bitumen. install solar ready system. | $34,200 |
| Jul 20, 2020 | Completed final sign-off Dec 2020 | 155 25th Av | limited to front sectoins of bldg; replace damaged siding in several sections using same type & grade siding & trim inkind. seal the bldg, prime & paint. total amount of non-struction damage replacement: 10000 sqftDetails
limited to front sectoins of bldg; replace damaged siding in several sections using same type & grade siding & trim inkind. seal the bldg, prime & paint. total amount of non-struction damage replacement: 10000 sqft | $159,650 |
| May 26, 2020 | Completed final sign-off Jun 2020 | 289 San Marcos Av | roofing repair based on the damage caused by other contractor (scratches, damage to flat and sloped sections of the roof system) repair in kind.Details
roofing repair based on the damage caused by other contractor (scratches, damage to flat and sloped sections of the roof system) repair in kind. | $14,600 |
| Mar 3, 2020 | Completed final sign-off Dec 2020 | 1963 Clay St | re-roofingDetails
re-roofing | $72,300 |
| Mar 3, 2020 | Completed final sign-off Apr 2020 | 219 Hartford St | re-roofingDetails
re-roofing | $73,200 |
| Feb 26, 2020 | Completed final sign-off Mar 2020 | 490 Colon Av | reroofingDetails
reroofing | $89,530 |
| Dec 27, 2019 | Completed final sign-off Jan 2020 | 82 Idora Av | reroofingDetails
reroofing | $42,120 |
| Dec 27, 2019 | Completed final sign-off Jan 2020 | 155 25th Av | reroofingDetails
reroofing | $48,300 |
| Nov 5, 2019 | Completed final sign-off Nov 2019 | 373 Richland Av | replace existing asphalt shingle roof with new 3-tab asphalt shingles. approved otc.Details
replace existing asphalt shingle roof with new 3-tab asphalt shingles. approved otc. | $37,820 |
| Oct 25, 2019 | Completed final sign-off Jan 2020 | 707 Guerrero St | re-roofingDetails
re-roofing | $80,968 |
| Oct 10, 2019 | Completed final sign-off Jan 2020 | 70 Santa Rita Av | reroofingDetails
reroofing | $73,600 |
| Oct 10, 2019 | Completed final sign-off Oct 2019 | 533 Ortega St | reroofingDetails
reroofing | $48,000 |
| Sep 13, 2019 | Completed final sign-off Sep 2019 | 681 10th Av | re-roofing in-kind. not visible from street.Details
re-roofing in-kind. not visible from street. | $24,600 |
| Sep 13, 2019 | Completed final sign-off Oct 2019 | 818 Duncan St | reroofingDetails
reroofing | $37,840 |
| Sep 13, 2019 | Completed final sign-off Oct 2019 | 101 Lee Av | reroofingDetails
reroofing | $36,500 |