Permit GraphShortlistSan Francisco building permits since 2000

E W Lum Construction

Contractor license
724273
State license record
Based in
San Francisco
On San Francisco permits
Nov 2005 to Aug 2012
Last 24 months
0 permits filed

11 permits since 2000: 11 completed.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Most recent permits

AllStairs 1Kitchen remodel 3Bathroom remodel 5
FiledOutcomeAddressWork described on the permitDeclared cost
Aug 31, 2012Completed
final sign-off Oct 2012
637 Vallejo Streinforce extg wood beam at column line 3 at ground floor. reinforce extg crack floor joist.
Details
Permit
201208318716
Status
complete
Filed
Aug 31, 2012
Permit issued
Sep 14, 2012
Final sign-off
Oct 10, 2012
Declared cost
$3,400
Address
637 Vallejo St

reinforce extg wood beam at column line 3 at ground floor. reinforce extg crack floor joist.

Open the permit page

$3,400
Sep 21, 2010Completed
final sign-off Oct 2010
142 Sylvan Drrevise app#201008098425 to include remodel of hall bath on 2nd floor, retile shower wall & floors. no structural work.
Details
Permit
201009211308
Status
complete
Filed
Sep 21, 2010
Permit issued
Sep 21, 2010
Final sign-off
Oct 28, 2010
Declared cost
$5,000
Address
142 Sylvan Dr

revise app#201008098425 to include remodel of hall bath on 2nd floor, retile shower wall & floors. no structural work.

Open the permit page

$5,000
Mar 15, 2010Completed
final sign-off Apr 2010
637 Vallejo Strepair dry rotted beam at basement
Details
Permit
201003158198
Status
complete
Filed
Mar 15, 2010
Permit issued
Mar 15, 2010
Final sign-off
Apr 26, 2010
Declared cost
$3,500
Address
637 Vallejo St

repair dry rotted beam at basement

Open the permit page

$3,500
Mar 4, 2010Completed
final sign-off Apr 2010
637 Vallejo Stemergency temporary shoring to existing dry rotted girder on ground floor
Details
Permit
201003047538
Status
complete
Filed
Mar 4, 2010
Permit issued
Mar 4, 2010
Final sign-off
Apr 26, 2010
Declared cost
$3,000
Address
637 Vallejo St

emergency temporary shoring to existing dry rotted girder on ground floor

Open the permit page

$3,000
Jun 11, 2009Completed
final sign-off Nov 2009
2279 Sutter Strev.appl.200806265373, 200809111313, 200903204497& 200904226821. to show as built conditions,show changes during const.change (e) doors to 1 hr.rated door & windows to 1 hr. rated window. 2nd fl. relocate hallway & stairs with new doors. relocate skylights, remove fireplace.structural modifications.
Details
Permit
200906110257
Status
complete
Filed
Jun 11, 2009
Permit issued
Jun 11, 2009
Final sign-off
Nov 3, 2009
Declared cost
$10,000
Address
2279 Sutter St

rev.appl.200806265373, 200809111313, 200903204497& 200904226821. to show as built conditions,show changes during const.change (e) doors to 1 hr.rated door & windows to 1 hr. rated window. 2nd fl. relocate hallway & stairs with new doors. relocate skylights, remove fireplace.structural modifications.

Open the permit page

$10,000
Apr 22, 2009Completed
final sign-off Nov 2009
2279 Sutter St2nd floor unit: revision to 200903204497: modify interior arrangement, switch bedroom 2 with master bedroom and relocate bathroom. show as built for (e)3rd floor ceiling and (e)roof truss as found during construction.
Details
Permit
200904226821
Status
complete
Filed
Apr 22, 2009
Permit issued
Apr 22, 2009
Final sign-off
Nov 2, 2009
Address
2279 Sutter St

2nd floor unit: revision to 200903204497: modify interior arrangement, switch bedroom 2 with master bedroom and relocate bathroom. show as built for (e)3rd floor ceiling and (e)roof truss as found during construction.

Open the permit page

Mar 20, 2009Completed
final sign-off Nov 2009
2279 Sutter Strevision to 200806265373 to modify interior arrangement as follows: 2nd fl unit: convert rear bdrm to liv rm, liv rm to bdrm, relocate bath and combine w/ e bdrm to create master bdrm. 3rd fl unit: combine rear bdrm and kitchen/dr as 1 room, convert living rm to master bdrm with new bath, eliminate
Details
Permit
200903204497
Status
complete
Filed
Mar 20, 2009
Permit issued
Mar 25, 2009
Final sign-off
Nov 3, 2009
Declared cost
$5,000
Address
2279 Sutter St

revision to 200806265373 to modify interior arrangement as follows: 2nd fl unit: convert rear bdrm to liv rm, liv rm to bdrm, relocate bath and combine w/ e bdrm to create master bdrm. 3rd fl unit: combine rear bdrm and kitchen/dr as 1 room, convert living rm to master bdrm with new bath, eliminate

Open the permit page

$5,000
Apr 19, 2007Completed
final sign-off Oct 2007
680 Oak St680 oak, unit 1: remove (e) countertop. replace with new countertop. 682 oak, unit 1: remove (e) kitchen cabinets & contertop. replace with new kitchen cabinets & countertop. remove (e) bath fixtures. replace with new fixtures. new tile. remove & replace (e) rotted trim @ front fo bldg. no windows &
Details
Permit
200704199249
Status
complete
Filed
Apr 19, 2007
Permit issued
Apr 19, 2007
Final sign-off
Oct 4, 2007
Declared cost
$25,000
Address
680 Oak St

680 oak, unit 1: remove (e) countertop. replace with new countertop. 682 oak, unit 1: remove (e) kitchen cabinets & contertop. replace with new kitchen cabinets & countertop. remove (e) bath fixtures. replace with new fixtures. new tile. remove & replace (e) rotted trim @ front fo bldg. no windows &

Open the permit page

$25,000
Mar 29, 2007Completed
final sign-off Oct 2007
680 Oak Stremove/replace (e) kitchen cabinets & appliances. in both units remove/replace bath fixtures, toilet, lavy. new tile floor in bathrooms-both units. new lanudry hook up in both units.
Details
Permit
200703297614
Status
complete
Filed
Mar 29, 2007
Permit issued
Mar 29, 2007
Final sign-off
Oct 4, 2007
Declared cost
$30,000
Address
680 Oak St

remove/replace (e) kitchen cabinets & appliances. in both units remove/replace bath fixtures, toilet, lavy. new tile floor in bathrooms-both units. new lanudry hook up in both units.

Open the permit page

$30,000
Nov 8, 2005Completed
final sign-off Jan 2006
373 Broadwaysee demolition plan ab-17 demo only ti under seperate permit.
Details
Permit
200511087635
Status
complete
Filed
Nov 8, 2005
Permit issued
Nov 8, 2005
Final sign-off
Jan 20, 2006
Declared cost
$6,000
Address
373 Broadway

see demolition plan ab-17 demo only ti under seperate permit.

Open the permit page

$6,000
Nov 2, 2005Completed
final sign-off May 2006
637 Greenwich Streplace existing wood beam at garage renew app 200101109538
Details
Permit
200511027196
Status
complete
Filed
Nov 2, 2005
Permit issued
Nov 2, 2005
Final sign-off
May 8, 2006
Declared cost
$4,000
Address
637 Greenwich St

replace existing wood beam at garage renew app 200101109538

Open the permit page

$4,000