E S E Construction
- Based in
- Hayward
- On San Francisco permits
- Jun 2022 to Jul 2022
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 20, 2022 | Completed final sign-off Dec 2023 | 737 Panorama Dr | legalize (e) family room and bedroom at 1st fl built without permit (270 sqft). remodel non-permitted bathroom. relocation of furnace and water heater to garage; remove furnace room on 1st flDetails
legalize (e) family room and bedroom at 1st fl built without permit (270 sqft). remodel non-permitted bathroom. relocation of furnace and water heater to garage; remove furnace room on 1st fl | $5,000 |
| Jun 28, 2022 | Completed final sign-off Feb 2023 | 99 Devonshire Wy | one kitchen and one bathroom remodel. remodel both a like in kind. no walls moving new tile, counters, vanity, sinks, cabinets, fixtures and appliances.Details
one kitchen and one bathroom remodel. remodel both a like in kind. no walls moving new tile, counters, vanity, sinks, cabinets, fixtures and appliances. | $40,000 |