E & E General Construction Inc
- Based in
- Richmond
- On San Francisco permits
- Jul 2022 to Feb 2026
- Last 24 months
- 3 permits filed
8 permits since 2000: 6 completed, 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 13, 2026 | In progress issued Feb 2026 | 12 Hoffman Av | partial foundation replacement and approximately 500 sqft of wall dry rot repair.Details
partial foundation replacement and approximately 500 sqft of wall dry rot repair. | $40,000 |
| Jul 18, 2025 | Completed final sign-off Sep 2026 | 2735 Clay St | unit 6: kitchen cabinets replacement like for like.Details
unit 6: kitchen cabinets replacement like for like. | $45,000 |
| Jul 14, 2025 | Completed final sign-off Nov 2025 | 601 Van Ness Av | #441: demo of existing kitchen casework & appliances. demo of peninsula in the kitchen sink to remain. new upper & lower kitchen casework & appliances. new lighting throughout. new non load bearing walls separating common areas from bedroom.Details
#441: demo of existing kitchen casework & appliances. demo of peninsula in the kitchen sink to remain. new upper & lower kitchen casework & appliances. new lighting throughout. new non load bearing walls separating common areas from bedroom. | $101,685 |
| Aug 13, 2024 | In progress issued Aug 2024 | 814 Hayes St | unit #1: water heater vent replacement - drywall work w/5/8" type 'x' gyp. bd. - paint work. comply with 2022 cmc 802.6 & sfmc 802.6.1, up through existing chase.Details
unit #1: water heater vent replacement - drywall work w/5/8" type 'x' gyp. bd. - paint work. comply with 2022 cmc 802.6 & sfmc 802.6.1, up through existing chase. | $500 |
| Aug 5, 2024 | Completed final sign-off Nov 2024 | 631 O'farrell St | unit 604: minor kitchen remodel: new appliances, new casework, new floor, minor electricalDetails
unit 604: minor kitchen remodel: new appliances, new casework, new floor, minor electrical | $15,000 |
| May 20, 2024 | Completed final sign-off Sep 2024 | 814 Hayes St | shower work in master bedroom, drywall work in garage, installation of living guard rail, paint work. final plumbing work in kitchen sink, . revision 202206136152.Details
shower work in master bedroom, drywall work in garage, installation of living guard rail, paint work. final plumbing work in kitchen sink, . revision 202206136152. | $4,000 |
| Sep 22, 2023 | Completed final sign-off Jul 2025 | 735 Chestnut St | repair and replace floor drains and toilets and supply in rear building on property. reframe (e) bathroom nonloadbearing walls. re-wire plugs to panel. replace exterior doors in kind (same size & location, not visible from street).Details
repair and replace floor drains and toilets and supply in rear building on property. reframe (e) bathroom nonloadbearing walls. re-wire plugs to panel. replace exterior doors in kind (same size & location, not visible from street). | $2,000 |
| Jul 21, 2022 | Completed final sign-off Oct 2022 | 735 Chestnut St | remove and replace approx. 460sf of drywall in one bedroom 5/8" type x. installation of insulation. installation of drywall 460 sq ft.Details
remove and replace approx. 460sf of drywall in one bedroom 5/8" type x. installation of insulation. installation of drywall 460 sq ft. | $15,000 |