Dv Rasmussen & Son
- Based in
- Novato
- On San Francisco permits
- Apr 2001 to May 2008
- Last 24 months
- 0 permits filed
17 permits since 2000: 13 completed, 1 never finaled, 3 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 29, 2008 | Completed final sign-off Apr 2009 | 2500 Steiner St | work @ unit# 7 only. 7th floor. remodel 7th floor apartment including kitchen & 3 baths. non structural. fixtures & finishes only. in kind. no door & window work on this permit. no lighting work involved. plumbing & electrical under separate permit.Details
work @ unit# 7 only. 7th floor. remodel 7th floor apartment including kitchen & 3 baths. non structural. fixtures & finishes only. in kind. no door & window work on this permit. no lighting work involved. plumbing & electrical under separate permit. | $250,000 |
| Apr 10, 2008 | Completed final sign-off Sep 2008 | 20 Mountain Spring Av | replace exist windows & doors at sides. not visible from street. blomberg need frame replacement in kind. 0.67 u factor max.Details
replace exist windows & doors at sides. not visible from street. blomberg need frame replacement in kind. 0.67 u factor max. | $10,000 |
| Jun 12, 2007 | Completed final sign-off Nov 2007 | 3485 Washington St | remodel of existing bathroom including new fixtures, cabinets and tile. no structural work or exterior changes.Details
remodel of existing bathroom including new fixtures, cabinets and tile. no structural work or exterior changes. | $50,000 |
| Oct 6, 2006 | Completed final sign-off Jun 2007 | 310 Laurel St | repairs to (e) garage roof deck membrane. replace (e) roof deck brick paving. remove & replace side yard concrete walk to install foundation waterproofing & drainage. walk 153' x 40'. not visible from street. new roof deck brick paving shall be of same weight or less.Details
repairs to (e) garage roof deck membrane. replace (e) roof deck brick paving. remove & replace side yard concrete walk to install foundation waterproofing & drainage. walk 153' x 40'. not visible from street. new roof deck brick paving shall be of same weight or less. | $20,000 |
| Jul 20, 2004 | Expired or cancelled expired Apr 2008 | 755 El Camino Del Mar | to renew for #200307159557,e200309104400 for final inspectionDetails
to renew for #200307159557,e200309104400 for final inspection | |
| May 12, 2004 | Completed final sign-off May 2006 | 2500 Steiner St | remodel 4th fl. apartment. remove & replace non bearing partition walls, new electrical & plumbingDetails
remodel 4th fl. apartment. remove & replace non bearing partition walls, new electrical & plumbing | $600,000 |
| Oct 15, 2003 | Never finaled issued Oct 2003, no final | 282 29th Av | to renew app #200111163405s permit #966561Details
to renew app #200111163405s permit #966561 | |
| Jul 23, 2003 | Completed final sign-off Oct 2003 | 3425 Jackson St | to renew app#2001/07/29/6456 for final inspection.Details
to renew app#2001/07/29/6456 for final inspection. | |
| Jun 25, 2003 | Completed final sign-off Oct 2003 | 190 Edgewood Av | non structural demolition in prepration for remidel work per building permit ap 200301175486Details
non structural demolition in prepration for remidel work per building permit ap 200301175486 | $10,000 |
| May 29, 2003 | Completed final sign-off May 2004 | 755 El Camino Del Mar | interior renovation including remodeling of five existing baths & existing kitchen, fam rm remodel iDetails
interior renovation including remodeling of five existing baths & existing kitchen, fam rm remodel i | $175,000 |
| Aug 29, 2002 | Completed final sign-off Aug 2002 | 2521 Broadway | renew appl#200104046016 for final inspectionDetails
renew appl#200104046016 for final inspection | |
| Aug 28, 2002 | Completed final sign-off Aug 2002 | 2521 Broadway | skylight added to existing permit#936419 work has been inspected & completed. dis field inspector reDetails
skylight added to existing permit#936419 work has been inspected & completed. dis field inspector re | $300 |
| Aug 27, 2002 | Completed final sign-off Sep 2003 | 50 Pixley St | remodel existing garage levelDetails
remodel existing garage level | $45,000 |
| Jan 15, 2002 | Expired or cancelled expired Jul 2002 | 825 Francisco St | install new lighting & plumbing fixts & finishes in bsmt(e)half bath.add new lighting & cabinetry inDetails
install new lighting & plumbing fixts & finishes in bsmt(e)half bath.add new lighting & cabinetry in | $25,000 |
| Jul 23, 2001 | Completed final sign-off Jul 2002 | 310 Laurel St | replace damaged wood sgingle siding on the front, rear & south side of the houseDetails
replace damaged wood sgingle siding on the front, rear & south side of the house | $35,000 |
| Apr 4, 2001 | Completed final sign-off Jun 2001 | 2540 Filbert St | revision to pa 9901315Details
revision to pa 9901315 | |
| Apr 4, 2001 | Expired or cancelled expired Apr 2002 | 2521 Broadway | remodel of (e) master bath including installation of new shower, tub and cabinetsDetails
remodel of (e) master bath including installation of new shower, tub and cabinets | $100,000 |