Durkan Construction
- Based in
- San Francisco
- On San Francisco permits
- Nov 2001 to Aug 2014
- Last 24 months
- 0 permits filed
26 permits since 2000: 23 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 28, 2014 | Completed final sign-off Jan 2015 | 32 Carson St | repair work at front stairway. remove and re-insptall terraza steps after repairs to support, double up supporting elements, replace plywoodd ramp and memebtane. all work in kind, less than 50%Details
repair work at front stairway. remove and re-insptall terraza steps after repairs to support, double up supporting elements, replace plywoodd ramp and memebtane. all work in kind, less than 50% | $7,000 |
| Apr 1, 2014 | Completed final sign-off Jan 2015 | 259 07th Av | repair in kind front stairway, replace (e) terazzo steps & risers in kind, cap existing foundation to correct grade issue, replace adjacent "range" walls in kind, less than 50%.Details
repair in kind front stairway, replace (e) terazzo steps & risers in kind, cap existing foundation to correct grade issue, replace adjacent "range" walls in kind, less than 50%. | $12,000 |
| Jun 20, 2013 | Completed final sign-off Jul 2013 | 1562 20th Av | remove damaged 1x10 cover rustic siding @ rear 2nd story sun room, install insulation (r_13) at exposed sun room walls, install new 3/4 inch cdx sheath, install new hardi plank sidingDetails
remove damaged 1x10 cover rustic siding @ rear 2nd story sun room, install insulation (r_13) at exposed sun room walls, install new 3/4 inch cdx sheath, install new hardi plank siding | $5,000 |
| Feb 5, 2013 | Never finaled issued Feb 2013, no final | 2346 27th Av | replace front stairway "in kind", use (e) terazzo steps, re-install, match existing finishes.Details
replace front stairway "in kind", use (e) terazzo steps, re-install, match existing finishes. | $10,000 |
| Apr 12, 2012 | Completed final sign-off Apr 2012 | 647 04th Av | repair lower unit central wall, rear protion bearing over existing beam. no new structural work, level foor at wall.Details
repair lower unit central wall, rear protion bearing over existing beam. no new structural work, level foor at wall. | $700 |
| Apr 29, 2010 | Completed final sign-off May 2010 | 136 07th Av | voluntary upgrade at garage level only. work includes installing 5/8" anchor bolts to existing foundation at 32 inches oc use epoxy, 8" embedment also, provide positive connection to existing existing 6x6 post to footing with 2 dimpson ltt208 epoxiedDetails
voluntary upgrade at garage level only. work includes installing 5/8" anchor bolts to existing foundation at 32 inches oc use epoxy, 8" embedment also, provide positive connection to existing existing 6x6 post to footing with 2 dimpson ltt208 epoxied | $1,500 |
| Apr 6, 2010 | Completed final sign-off Jun 2010 | 252 Yerba Buena Av | replace in kind front stairway. repair various area of perimeter ( rear and sides) for dry rot, replace stucco to match existing/ correct grade issues at alleys and rear if applicableDetails
replace in kind front stairway. repair various area of perimeter ( rear and sides) for dry rot, replace stucco to match existing/ correct grade issues at alleys and rear if applicable | $25,000 |
| Dec 7, 2009 | Completed final sign-off Feb 2010 | 1571 26th Av | remove & replace in kind, front elevation stucco & wall sheath, 15 ft (match (e) finishes & trim. remove front stairway, replace hot mop. matche (e) terra cotta tile steps & risersDetails
remove & replace in kind, front elevation stucco & wall sheath, 15 ft (match (e) finishes & trim. remove front stairway, replace hot mop. matche (e) terra cotta tile steps & risers | $24,000 |
| Oct 6, 2009 | Completed final sign-off Nov 2009 | 1562 20th Av | repair flashing over bay windows, repair and patch stucco at front of house.Details
repair flashing over bay windows, repair and patch stucco at front of house. | $8,000 |
| Jul 11, 2008 | Completed final sign-off Sep 2008 | 2306 32nd Av | repair in kind dry rot on front elevation, match (e) finishes and conditions. replace dry rot damaged joists at bay window.Details
repair in kind dry rot on front elevation, match (e) finishes and conditions. replace dry rot damaged joists at bay window. | $10,000 |
| Dec 15, 2005 | Completed final sign-off Mar 2006 | 31 South Hill Bl | stair repair due to car accident. remove damaged stucco. remove terrazzo stairs. replace damaged rap hot mop ramp and replace terrazzo steps. restucco to match existing. stucco work is roughly 120 square feet. pressure trented plywood & 2x12 stringers will be used to support theramp.Details
stair repair due to car accident. remove damaged stucco. remove terrazzo stairs. replace damaged rap hot mop ramp and replace terrazzo steps. restucco to match existing. stucco work is roughly 120 square feet. pressure trented plywood & 2x12 stringers will be used to support theramp. | $12,500 |
| Nov 3, 2005 | Completed final sign-off Dec 2005 | 143 Congo St | break out stucco to remove extg terrazzo stairs/remove damaged wood/rehot mop ramp when extg stairs are refinished and set in place/wll restucco to maech extg/hot mop will extend up the wall 18" maintain main rise 8 min 9 of stairsDetails
break out stucco to remove extg terrazzo stairs/remove damaged wood/rehot mop ramp when extg stairs are refinished and set in place/wll restucco to maech extg/hot mop will extend up the wall 18" maintain main rise 8 min 9 of stairs | $4,000 |
| Nov 3, 2005 | Completed final sign-off Feb 2006 | 2631 Quintara St | remove stucco from face of house and rotted wood/replaywood 3/4's cd x plywood/replace 5 wdnw/insulate and restucco to match extg/the facade of the bldg will not change/500 sq ft of stuccoDetails
remove stucco from face of house and rotted wood/replaywood 3/4's cd x plywood/replace 5 wdnw/insulate and restucco to match extg/the facade of the bldg will not change/500 sq ft of stucco | $22,000 |
| Oct 26, 2005 | Completed final sign-off Jan 2006 | 1618 23rd Av | hot mop vertical min. 12"/stair repair break stucco out so that terruzzo steps can be removed and be refinished/install new ramp with 2x12 pressure treated wood and plywood /this ramp will be hot mopped/replace steps/stucco to match extgDetails
hot mop vertical min. 12"/stair repair break stucco out so that terruzzo steps can be removed and be refinished/install new ramp with 2x12 pressure treated wood and plywood /this ramp will be hot mopped/replace steps/stucco to match extg | $12,000 |
| Oct 26, 2005 | Completed final sign-off Dec 2005 | 2001 Rivera St | remove stucco and repair damaged wood from the down spout area/reply wood and stucco to match extgDetails
remove stucco and repair damaged wood from the down spout area/reply wood and stucco to match extg | $1,200 |
| Apr 25, 2005 | Completed final sign-off May 2005 | 615 16th Av | remove stucco & repair damaged banisters with treated lumber and plywood/install proper ventilationDetails
remove stucco & repair damaged banisters with treated lumber and plywood/install proper ventilation | $4,550 |
| Sep 7, 2004 | Completed final sign-off Sep 2004 | 503 Sanchez St | install proper hand rail in rear stairs of property per nov #200451410Details
install proper hand rail in rear stairs of property per nov #200451410 | $1,000 |
| Apr 28, 2003 | Completed final sign-off Jun 2003 | 3918 Noriega St | dry rot stair repair (front) remove (e)deteriated terrazo steps & replace w/new brick stairs to matcDetails
dry rot stair repair (front) remove (e)deteriated terrazo steps & replace w/new brick stairs to matc | $9,100 |
| Mar 7, 2003 | Completed final sign-off Jul 2003 | 1727 40th Av | add new bedroom and bathroom to existing unfinished garage areaDetails
add new bedroom and bathroom to existing unfinished garage area | $25,000 |
| Oct 31, 2002 | Expired or cancelled expired Dec 2006 | 755 Dolores St | repair stairs @ rear of bldg., remove fungas damage stringer/treads, replace landing/bottom step,Details
repair stairs @ rear of bldg., remove fungas damage stringer/treads, replace landing/bottom step, | $2,200 |
| Sep 13, 2002 | Completed final sign-off Oct 2002 | 4096 17th St | remove water damaged plywood & stubs at rear corner of building. replace with pressure treated woodDetails
remove water damaged plywood & stubs at rear corner of building. replace with pressure treated wood | $2,100 |
| Aug 16, 2002 | Completed final sign-off Aug 2002 | 1384 17th Av | back stair repair-wood deterioration decay at stringers joists and support structure at back stair.Details
back stair repair-wood deterioration decay at stringers joists and support structure at back stair. | $800 |
| Apr 23, 2002 | Completed final sign-off Jul 2002 | 342 Pierce St | replace rotted post w/ treatedlumber, replace bottom landingDetails
replace rotted post w/ treatedlumber, replace bottom landing | $3,200 |
| Mar 28, 2002 | Expired or cancelled expired Jul 2002 | 887 37th Av | replace rotted posts,replace threads, repair handrails to code, at rear of buildingDetails
replace rotted posts,replace threads, repair handrails to code, at rear of building | $1,600 |
| Jan 18, 2002 | Completed final sign-off Mar 2002 | 1727 40th Av | remove cracked & damaged stucco. replace rotted studs & plywood & replace with new treated studs &Details
remove cracked & damaged stucco. replace rotted studs & plywood & replace with new treated studs & | $7,200 |
| Nov 19, 2001 | Completed final sign-off Dec 2001 | 1183 Filbert St | repair 35% of existing back stairs due to dryrot and fungus all work to be done according to codeDetails
repair 35% of existing back stairs due to dryrot and fungus all work to be done according to code | $1,200 |