Dunne-Right Remodeling
- Based in
- Napa
- On San Francisco permits
- Apr 2015 to Apr 2015
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 23, 2015 | Never finaled issued Apr 2015, no final | 460 Duboce Av | unit 4: remove cabinets, remove wall covering about 4'ht. reroute gas & cold water line. add new recepticals, switches, move 2 light fixtures. install led can lights. install new cabinet. install drywall/tape/texture. new flooring, replace 2 windows and 1 door - none visible from st. all work withinDetails
unit 4: remove cabinets, remove wall covering about 4'ht. reroute gas & cold water line. add new recepticals, switches, move 2 light fixtures. install led can lights. install new cabinet. install drywall/tape/texture. new flooring, replace 2 windows and 1 door - none visible from st. all work within | $16,560 |