Duggan Development
- Based in
- Daly City
- On San Francisco permits
- Jan 2022 to May 2026
- Last 24 months
- 5 permits filed
16 permits since 2000: 12 completed, 2 in progress, 2 never finaled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 6, 2026 | In progress issued May 2026 | 10 Shore View Av | remodel (e) bathroom in-kind. new shower pan and tile replace with new bathroom fixtures. no wall to be removed.Details
remodel (e) bathroom in-kind. new shower pan and tile replace with new bathroom fixtures. no wall to be removed. | $30,000 |
| Apr 16, 2026 | Completed final sign-off Jun 2026 | 464 Day St | repair dry-rot in existing deck at rear of property. replace redwood decking with trex decking boards. replacing less then 50% of deck. in kindDetails
repair dry-rot in existing deck at rear of property. replace redwood decking with trex decking boards. replacing less then 50% of deck. in kind | $7,500 |
| Aug 22, 2025 | In progress issued Sep 2025 | 1721 Sanchez St | lower level (n) lounge room and laundry room (n) mep , finishes, windows and doors not visible from street. (n) internal stairs, exterior landing with stair to backyard. main level (n) dining room and internal staircase. upper level repalce (e) exterior deck at rear. add 451 sfDetails
lower level (n) lounge room and laundry room (n) mep , finishes, windows and doors not visible from street. (n) internal stairs, exterior landing with stair to backyard. main level (n) dining room and internal staircase. upper level repalce (e) exterior deck at rear. add 451 sf | $400,000 |
| Jun 16, 2025 | Completed final sign-off Jun 2025 | 464 Day St | repair dryrot in front steps. replace in kindDetails
repair dryrot in front steps. replace in kind | $2,500 |
| May 20, 2025 | Completed final sign-off Jun 2025 | 742 Castro St | remove approx 100sqft of stucco and repair dryrot and replace with new 7/8th stucco 3 ply. front facing the street.Details
remove approx 100sqft of stucco and repair dryrot and replace with new 7/8th stucco 3 ply. front facing the street. | $9,000 |
| Oct 2, 2023 | Completed final sign-off Dec 2023 | 1405 37th Av | repair damage to north side of garage. remove and replace approx 20 sq ft of stucco and siding and replace any damgaed wood members. replace existing garage door.Details
repair damage to north side of garage. remove and replace approx 20 sq ft of stucco and siding and replace any damgaed wood members. replace existing garage door. | $9,000 |
| May 31, 2023 | Completed final sign-off Dec 2023 | 464 Day St | remodel existing kitchen, replace cabinets and countertops, replace one 6' slider to bck deck and patch approx 80 sq ft of cracked sheetrock non structuralDetails
remodel existing kitchen, replace cabinets and countertops, replace one 6' slider to bck deck and patch approx 80 sq ft of cracked sheetrock non structural | $53,000 |
| Feb 23, 2023 | Completed final sign-off Dec 2023 | 464 Day St | remodel existing bathroom add one vnaity and 4 recessed cans. non structural.Details
remodel existing bathroom add one vnaity and 4 recessed cans. non structural. | $28,000 |
| Feb 10, 2023 | Completed final sign-off Jul 2023 | 933 Noe St | respond to planning nov 2022-009339enf. repalce (e) gas range w/ new 2 burner cooktop. legalize ground fl living rm, secondary kitchen, bath, storage, laundry, bonus room, and fire rated egress @ hallway ground level.Details
respond to planning nov 2022-009339enf. repalce (e) gas range w/ new 2 burner cooktop. legalize ground fl living rm, secondary kitchen, bath, storage, laundry, bonus room, and fire rated egress @ hallway ground level. | $1,000 |
| Feb 1, 2023 | Completed final sign-off Apr 2023 | 4217 21st St | remove and replace sections of worn out t-111 siding on building (not street visible) and prime and paint. approx 1500 sq ftDetails
remove and replace sections of worn out t-111 siding on building (not street visible) and prime and paint. approx 1500 sq ft | $20,000 |
| Aug 17, 2022 | Never finaled issued Aug 2022, no final | 2598 San Bruno Av | to obtain final inspection for work approved under pa# 200504069314. all work is complete.Details
to obtain final inspection for work approved under pa# 200504069314. all work is complete. | |
| Aug 17, 2022 | Completed final sign-off Mar 2023 | 2598 San Bruno Av | to obtain final inspection for work approved under pa# 200005049076 and 200005049078. all work is complete.Details
to obtain final inspection for work approved under pa# 200005049076 and 200005049078. all work is complete. | |
| Aug 17, 2022 | Completed final sign-off Mar 2023 | 2598 San Bruno Av | to obtain final inspection for work approved under pa# 200805011033. all work is complete.Details
to obtain final inspection for work approved under pa# 200805011033. all work is complete. | |
| Jul 5, 2022 | Completed final sign-off Apr 2025 | 691 Morse St | repair dryrot caused by (3) leaking windows. replace (3) windows & patch stucco around windows. all work repair in kind.Details
repair dryrot caused by (3) leaking windows. replace (3) windows & patch stucco around windows. all work repair in kind. | $12,000 |
| Mar 2, 2022 | Never finaled issued Aug 2022, no final | 2598 San Bruno Av | to comply with nov 202184844 and 202185314. remodel (e) deli/cafe, work include new grease interceptor, new ventless hood with deep fryers. remove side door and built one 1-hr rated partition.Details
to comply with nov 202184844 and 202185314. remodel (e) deli/cafe, work include new grease interceptor, new ventless hood with deep fryers. remove side door and built one 1-hr rated partition. | $15,000 |
| Jan 6, 2022 | Completed final sign-off Aug 2022 | 488 Gold Mine Dr | bathroom remodel in kind. tiles, change tub to shower, new toilet, new sink/vanity. no wall layout changes.Details
bathroom remodel in kind. tiles, change tub to shower, new toilet, new sink/vanity. no wall layout changes. | $35,000 |