Driven Construction Llc
- Based in
- Alameda
- On San Francisco permits
- Sep 2025 to Jul 2026
- Last 24 months
- 5 permits filed
5 permits since 2000: 2 completed, 3 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 22, 2026 | In progress issued Jul 2026 | 151 Vicksburg St | revision to #202607084692- repair/rebuild rear deck and landings in kind due to dry rot less than 50% as needed. revise: a0 to include rear deck rebuild in kind, a2.1 to demo rear deck, a2.2, a4.2, a4.3, a4.4 to rebuild/repair deckDetails
revision to #202607084692- repair/rebuild rear deck and landings in kind due to dry rot less than 50% as needed. revise: a0 to include rear deck rebuild in kind, a2.1 to demo rear deck, a2.2, a4.2, a4.3, a4.4 to rebuild/repair deck | $35,000 |
| Jul 8, 2026 | In progress issued Jul 2026 | 151 Vicksburg St | top unit -nterior remodel of (e) condo unit including kitchen remodel, reconfige 2 (e) bathrooms, convert (e) half bath into full bath, removal of non bearing interior partitions, cabinets and finishes. no change to occupany, use or footprint.Details
top unit -nterior remodel of (e) condo unit including kitchen remodel, reconfige 2 (e) bathrooms, convert (e) half bath into full bath, removal of non bearing interior partitions, cabinets and finishes. no change to occupany, use or footprint. | $140,000 |
| May 11, 2026 | In progress issued Jun 2026 | 2921 20th Av | interior remodel of (e) 2 stories sfd: reconfiguration of bathrooms and interior stair modifications. new wet bar at lower level, minor exterior modifications including window adjustments reduction in size of 1 window at lower level(left side) and minor relocation of 2 bathrooms windows at main le..Details
interior remodel of (e) 2 stories sfd: reconfiguration of bathrooms and interior stair modifications. new wet bar at lower level, minor exterior modifications including window adjustments reduction in size of 1 window at lower level(left side) and minor relocation of 2 bathrooms windows at main le.. | $150,000 |
| Oct 20, 2025 | Completed final sign-off Sep 2026 | 1000 North Point St | two bathrooms and one kitchen, like for like remodel.Details
two bathrooms and one kitchen, like for like remodel. | $45,000 |
| Sep 23, 2025 | Completed final sign-off Feb 2026 | 8 Buchanan St | unit 505: two bathrooms full remodel, like for like, replace lower cabinets, countertop and backsplash for kitchen, along with replacing kitchen island, interior work only.Details
unit 505: two bathrooms full remodel, like for like, replace lower cabinets, countertop and backsplash for kitchen, along with replacing kitchen island, interior work only. | $25,000 |