Dreamsky Construction
- Based in
- San Francisco
- On San Francisco permits
- Aug 2022 to Jan 2026
- Last 24 months
- 3 permits filed
6 permits since 2000: 4 completed, 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 15, 2026 | In progress issued Mar 2026 | 8 Santa Ynez Av | remodel (e) kitchen and bathroom on level 2. replace 3 (e) windows. replace (e) front stair in kind. no change to floor area.Details
remodel (e) kitchen and bathroom on level 2. replace 3 (e) windows. replace (e) front stair in kind. no change to floor area. | $40,000 |
| Dec 29, 2025 | In progress issued Jan 2026 | 530 Dewey Bl | interior remodel. new bathroom at 2nd floor. alter kitchen and bathroom at 1st floor. new bathroiom at ground floor/basement. windows replacement in kind.Details
interior remodel. new bathroom at 2nd floor. alter kitchen and bathroom at 1st floor. new bathroiom at ground floor/basement. windows replacement in kind. | $120,000 |
| Jan 30, 2025 | Completed final sign-off Feb 2026 | 14 Santa Ynez Av | revision 202406255185- structural revision. replace floor beam per plan. replace foundation at line a, new concrete pads.Details
revision 202406255185- structural revision. replace floor beam per plan. replace foundation at line a, new concrete pads. | $10,000 |
| Jul 8, 2024 | Completed final sign-off Oct 2025 | 1687 19th Av | kitchen remodel includes removal and replacement of kitchen appliances - dishwasher, sink, oven, gas range, refrigerator, countertop, and flooring. new electircal and plumbing work will be required.Details
kitchen remodel includes removal and replacement of kitchen appliances - dishwasher, sink, oven, gas range, refrigerator, countertop, and flooring. new electircal and plumbing work will be required. | $20,000 |
| Jun 25, 2024 | Completed final sign-off Feb 2026 | 14 Santa Ynez Av | remodel of (e) upper level and lower level bathroom, modify (e) interior stairs by kitchen, addition of bathroom and primary bedroom to lower level.Details
remodel of (e) upper level and lower level bathroom, modify (e) interior stairs by kitchen, addition of bathroom and primary bedroom to lower level. | $90,000 |
| Aug 30, 2022 | Completed final sign-off May 2023 | 392 Princeton St | remodel an existing kitchen , bathroom on upper levelDetails
remodel an existing kitchen , bathroom on upper level | $80,000 |