Dream Finder Construction Inc
- Based in
- Modesto
- On San Francisco permits
- Nov 2022 to Nov 2022
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 17, 2022 | Completed final sign-off Jan 2024 | 1939 Mission St | remove the (e) sheetrock. including old electrical piping. fix the plumbing leaks and issues with the violation. run all electrical wires through the studs. install new sheetrock tape e skim new flooring new commercial electrical ultra slim 6in new construction led. no guestroom will be removed.Details
remove the (e) sheetrock. including old electrical piping. fix the plumbing leaks and issues with the violation. run all electrical wires through the studs. install new sheetrock tape e skim new flooring new commercial electrical ultra slim 6in new construction led. no guestroom will be removed. | $45,000 |