Dpd Construction & Design
- Based in
- San Francisco
- On San Francisco permits
- Dec 2000 to Sep 2006
- Last 24 months
- 0 permits filed
16 permits since 2000: 15 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 22, 2006 | Completed final sign-off Oct 2006 | 842 Teresita Bl | patrial renovation of bathroom - new tub, shower stall, medicine cabinet, tile & new florescent lights.Details
patrial renovation of bathroom - new tub, shower stall, medicine cabinet, tile & new florescent lights. | $18,000 |
| Aug 18, 2006 | Completed final sign-off Oct 2006 | 149 Chenery St | renovation of kitchen: remove closet from bedroom, remove built-in cabinet from dining room, remove sm window in kitchen. new cabinets, floor, window, walls, insulation (f13 walls), update wiring, update plumbing, new lighting.Details
renovation of kitchen: remove closet from bedroom, remove built-in cabinet from dining room, remove sm window in kitchen. new cabinets, floor, window, walls, insulation (f13 walls), update wiring, update plumbing, new lighting. | $38,000 |
| Jun 5, 2006 | Completed final sign-off Aug 2006 | 2370 29th Av | renovation of kitchen: remove 2 doors, 1 wall. new cabinets, floor, appliances, coutnertop, electrical update. non structural.Details
renovation of kitchen: remove 2 doors, 1 wall. new cabinets, floor, appliances, coutnertop, electrical update. non structural. | $42,000 |
| Sep 29, 2005 | Completed final sign-off Apr 2006 | 1518 17th Av | remodel of kitchen: new floor, cabinets, countertop, appliances, enterior with sound proofing, remove part of wall between kitchen & dining room, new window.Details
remodel of kitchen: new floor, cabinets, countertop, appliances, enterior with sound proofing, remove part of wall between kitchen & dining room, new window. | $34,000 |
| Aug 5, 2005 | Completed final sign-off Nov 2005 | 842 Teresita Bl | remodel kitchen new-cabinets, counter tops, sink, faucet, window floor. no structural changes.Details
remodel kitchen new-cabinets, counter tops, sink, faucet, window floor. no structural changes. | $32,000 |
| Aug 5, 2005 | Never finaled issued Aug 2005, no final | 175 Red Rock Wy | remodel kitchen-new cabinets, sink, faucet, countertops. no structural changes, no change in design.Details
remodel kitchen-new cabinets, sink, faucet, countertops. no structural changes, no change in design. | $11,000 |
| Mar 10, 2005 | Completed final sign-off May 2005 | 207 Christopher Dr | renovate 2 bathrooms, bath & new shower stall, new tile, new low flow toilet, new vanity, fixtures.Details
renovate 2 bathrooms, bath & new shower stall, new tile, new low flow toilet, new vanity, fixtures. | $34,000 |
| Jun 4, 2004 | Completed final sign-off Aug 2004 | 207 Christopher Dr | demo of existing kitchen and part wall to dining rm construct new kitchen with new wiring cabinetsDetails
demo of existing kitchen and part wall to dining rm construct new kitchen with new wiring cabinets | $28,000 |
| Jan 21, 2004 | Completed final sign-off Jul 2004 | 187 Melrose Av | renovation of kitchen/new cabinets/countertop/flooring/lghtg/sink/applcDetails
renovation of kitchen/new cabinets/countertop/flooring/lghtg/sink/applc | $48,500 |
| Sep 10, 2003 | Completed final sign-off May 2004 | 2539 Clay St | #5- demo (e) bath & 2 closets. construct 2 bath, 1 full, 1 1-3/4. all new fixtures & marble tileDetails
#5- demo (e) bath & 2 closets. construct 2 bath, 1 full, 1 1-3/4. all new fixtures & marble tile | $35,000 |
| Aug 1, 2002 | Completed final sign-off Jul 2003 | 1364 Vermont St | retifit rear north roof with shed dormer. construct new bath 4'-7"x 13'-8" in area. remove existingDetails
retifit rear north roof with shed dormer. construct new bath 4'-7"x 13'-8" in area. remove existing | $22,500 |
| May 28, 2002 | Completed final sign-off Jul 2002 | 187 Melrose Av | rev of plans 200103063608-change bedrm to storage on lower flr due to deck above extending more thanDetails
rev of plans 200103063608-change bedrm to storage on lower flr due to deck above extending more than | |
| Mar 30, 2001 | Completed final sign-off Nov 2001 | 50 Santa Paula Av | replace rear stairs, construct platform decks (both less than30" above grade). construct new fencesnDetails
replace rear stairs, construct platform decks (both less than30" above grade). construct new fencesn | $6,000 |
| Mar 23, 2001 | Completed final sign-off Sep 2001 | 21 Baker St | remodel entrance door, install single door, partition wall, relocate ceiling fixtureDetails
remodel entrance door, install single door, partition wall, relocate ceiling fixture | $8,000 |
| Mar 6, 2001 | Completed final sign-off Jul 2002 | 187 Melrose Av | retro-set of basement area, conversion of storage area to bedrm, new bath, new closet/storage, new fDetails
retro-set of basement area, conversion of storage area to bedrm, new bath, new closet/storage, new f | $32,000 |
| Dec 13, 2000 | Completed final sign-off Sep 2001 | 187 Melrose Av | construction of 2 level deck at rear of hous new slider doors 2nd lvlDetails
construction of 2 level deck at rear of hous new slider doors 2nd lvl | $10,000 |