Dorin Buzatu Construction
- Based in
- Hayward
- On San Francisco permits
- Sep 2006 to Nov 2016
- Last 24 months
- 0 permits filed
4 permits since 2000: 3 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 17, 2016 | Never finaled issued Jan 2017, no final | 121 Spear St | b-9. install an electric single face (letter) wall sign inside the courtyard. n/a maher ordinanceDetails
b-9. install an electric single face (letter) wall sign inside the courtyard. n/a maher ordinance | $2,800 |
| Sep 14, 2007 | Completed final sign-off May 2008 | 2570 Sutter St | to comply with nov200721054/ dry rot repair at rear of building, construct new deck and stair.Details
to comply with nov200721054/ dry rot repair at rear of building, construct new deck and stair. | $30,000 |
| Dec 11, 2006 | Completed final sign-off Dec 2007 | 2570 Sutter St | upgrade elctrical, plumbing, remodel (2) kitchens & 2 baths. revise cost per field inspection correction notice on app#200609223094.Details
upgrade elctrical, plumbing, remodel (2) kitchens & 2 baths. revise cost per field inspection correction notice on app#200609223094. | $40,000 |
| Sep 22, 2006 | Completed final sign-off Dec 2007 | 2570 Sutter St | replace windows (9 windows at front) install tile flr. bathrooms and kitchens floors (2 bathroom & 2 kitchen floors).Details
replace windows (9 windows at front) install tile flr. bathrooms and kitchens floors (2 bathroom & 2 kitchen floors). | $1,500 |