Dorado Enterprises
- Based in
- Oceanside
- On San Francisco permits
- Jan 2014 to Dec 2022
- Last 24 months
- 0 permits filed
8 permits since 2000: 6 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 22, 2022 | Never finaled issued Mar 2023, no final | 1 Market St | modify exterior patio. no change in interior occuant load. new furntiure/umbrellas for the (e) patio area and new folding doors between the patio and dining area. the new total occupant load is shown in egress plan. ref approved t.i. under 202201135898.Details
modify exterior patio. no change in interior occuant load. new furntiure/umbrellas for the (e) patio area and new folding doors between the patio and dining area. the new total occupant load is shown in egress plan. ref approved t.i. under 202201135898. | $80,000 |
| Jan 13, 2022 | Completed final sign-off Oct 2022 | 1 Market St | g/f: interior t.i. for new restaurant and (e) shell building. new fixtures, finishes, new (non-structural) partitions, (e) restrooom fixtures to remain, new finishes only. (e) kitchen will be modified inclkuding electrical/plumbing elements based on the updated kitchen design. new lighting, hvac.Details
g/f: interior t.i. for new restaurant and (e) shell building. new fixtures, finishes, new (non-structural) partitions, (e) restrooom fixtures to remain, new finishes only. (e) kitchen will be modified inclkuding electrical/plumbing elements based on the updated kitchen design. new lighting, hvac. | $500,000 |
| Oct 25, 2021 | Never finaled issued Oct 2021, no final | 1 Market St | interior demo: removal of floorings, light fixture, all furniture, tables, chairs to be removed 2x2 tiles to be removed and flooring materials, gyp board to be removed per ab-017.Details
interior demo: removal of floorings, light fixture, all furniture, tables, chairs to be removed 2x2 tiles to be removed and flooring materials, gyp board to be removed per ab-017. | $40,000 |
| Aug 23, 2021 | Completed final sign-off Jul 2022 | 1200 09th Av | minor boh kitchen and cafe remodel. exterior mod of awnings, finiehes, signage, and replace (e) fixted window with one new operable window.interior: kitchen remodel, new partitian walls, electrical, plumbing and mech mods. no change of use, no new sf.Details
minor boh kitchen and cafe remodel. exterior mod of awnings, finiehes, signage, and replace (e) fixted window with one new operable window.interior: kitchen remodel, new partitian walls, electrical, plumbing and mech mods. no change of use, no new sf. | $125,000 |
| Jun 4, 2014 | Completed final sign-off Jun 2014 | 2800 Leavenworth St | as built to pa#201405145688 to include additional framing details and to identify anchor locations which was missing from original plans. n/a ordinance #155-13Details
as built to pa#201405145688 to include additional framing details and to identify anchor locations which was missing from original plans. n/a ordinance #155-13 | |
| May 14, 2014 | Completed final sign-off Jun 2014 | 2800 Leavenworth St | as built to pa #2014.0114.6201 - to include entry tower/store front clarification, revise patio exit gates, electrical outlet locations & gas connection location. compliance with ordinance #155-13 not requiredDetails
as built to pa #2014.0114.6201 - to include entry tower/store front clarification, revise patio exit gates, electrical outlet locations & gas connection location. compliance with ordinance #155-13 not required | |
| Jan 30, 2014 | Completed final sign-off Jun 2014 | 2800 Leavenworth St | (e) restaurant demolish interior non-structural restaurant fixtures & equipment, booth seating, wood ceiling, bar & counters, cabinets & casework, retail area, half walls, quarry floor tile.Details
(e) restaurant demolish interior non-structural restaurant fixtures & equipment, booth seating, wood ceiling, bar & counters, cabinets & casework, retail area, half walls, quarry floor tile. | $8,500 |
| Jan 14, 2014 | Completed final sign-off Jun 2014 | 2800 Leavenworth St | restaurant remodel to include removal & replacement of front entry doors & windows, (n) finishes throughout. misc fixtures replaced as needed, (n) cover/trellis over patio areas. new occupant load (482). maher ord not req.Details
restaurant remodel to include removal & replacement of front entry doors & windows, (n) finishes throughout. misc fixtures replaced as needed, (n) cover/trellis over patio areas. new occupant load (482). maher ord not req. | $190,000 |