Donnelly Kerley Builders Inc.
- Based in
- Foster City
- On San Francisco permits
- Jun 2009 to Sep 2010
- Last 24 months
- 0 permits filed
2 permits since 2000: 1 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 3, 2010 | Completed final sign-off Nov 2010 | 282 02nd St | ground floor - demolish non bearing partitions, relocate existing light fixtures, demolish and replace portion of existing ceiling, patch and paint various areas of drywall, abandon (capt) 2 elec outlets, no mepDetails
ground floor - demolish non bearing partitions, relocate existing light fixtures, demolish and replace portion of existing ceiling, patch and paint various areas of drywall, abandon (capt) 2 elec outlets, no mep | $15,000 |
| Jun 17, 2009 | Never finaled issued Oct 2009, no final | 550 Kearny St | elect. closet upgrades basemnt through 6th fl includes 1 hour partition and 45 min door rating and 2 hour penetration fire stopping. 7 through 10 floor includes 2 hour penetration fire stopping. no mechanical work. in addition, upgrades to 4th floor men's room to meet ada requirements.Details
elect. closet upgrades basemnt through 6th fl includes 1 hour partition and 45 min door rating and 2 hour penetration fire stopping. 7 through 10 floor includes 2 hour penetration fire stopping. no mechanical work. in addition, upgrades to 4th floor men's room to meet ada requirements. | $105,000 |