Don Rene Alvarado General Construction
- Based in
- San Franciskco
- On San Francisco permits
- Nov 2016 to Jul 2026
- Last 24 months
- 8 permits filed
29 permits since 2000: 16 completed, 6 in progress, 6 never finaled, 1 expired or cancelled.
Of the 6 never-finaled permits, 6 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 30, 2026 | In progress issued Aug 2026 | 681 Harrison St | existing office space to be converted into an aroma therapy spa. modify front door entry, to an accessible entry. provide accessible lift, new floor plan layout with partition walls & new accessible toiletDetails
existing office space to be converted into an aroma therapy spa. modify front door entry, to an accessible entry. provide accessible lift, new floor plan layout with partition walls & new accessible toilet | $80,000 |
| May 5, 2026 | In progress issued Jul 2026 | 1448 Pacific Av | comply w/ nov #, 202541740, new waiter station - bar counter.Details
comply w/ nov #, 202541740, new waiter station - bar counter. | $2,000 |
| Feb 12, 2026 | Completed final sign-off Aug 2026 | 1936 Leavenworth St | remodel existing bathroom in kind. adding a fan and replacing tub into a shower,40 sfDetails
remodel existing bathroom in kind. adding a fan and replacing tub into a shower,40 sf | $15,000 |
| Oct 22, 2025 | In progress issued Dec 2025 | 4 Montclair Tr | revision to permit 202505156604 (kitchen and bathroom remodel) to modify walls at both units. (4 montclair and 1050 lomgbard). remodel units, modify floor plan layout at all levels.Details
revision to permit 202505156604 (kitchen and bathroom remodel) to modify walls at both units. (4 montclair and 1050 lomgbard). remodel units, modify floor plan layout at all levels. | $20,000 |
| Aug 14, 2025 | Completed final sign-off Nov 2025 | 2867 Clay St | replace damaged siding at west side of bldg w ply wd, waterproofing and hardisidingDetails
replace damaged siding at west side of bldg w ply wd, waterproofing and hardisiding | $30,000 |
| Jun 9, 2025 | In progress issued Jun 2025 | 466 Union St | remodel kitchen and bathroom in kind. no moving walls. kitchen approx 60 sq ft. bathroom 35 sq ft.Details
remodel kitchen and bathroom in kind. no moving walls. kitchen approx 60 sq ft. bathroom 35 sq ft. | $40,000 |
| May 15, 2025 | In progress issued May 2025 | 1050 Lombard St | remodel 2 bathrooms and 1 kitchen at (2 montclair) in kind. remodel 2 bath rooms at 1050 lombard in kind. all in kind. all interior work and all no structural. all no change to floor layout. all no change to wall layout. all no structural work.Details
remodel 2 bathrooms and 1 kitchen at (2 montclair) in kind. remodel 2 bath rooms at 1050 lombard in kind. all in kind. all interior work and all no structural. all no change to floor layout. all no change to wall layout. all no structural work. | $50,000 |
| Apr 3, 2025 | In progress issued Jun 2025 | 2162 Union St | unit b: no construction. change of occupancy only. vacant retail store to fitness/yoga studioDetails
unit b: no construction. change of occupancy only. vacant retail store to fitness/yoga studio | |
| Sep 10, 2024 | Completed final sign-off Oct 2024 | 221 Sansome St | 3/f: existing office to be converted into personal service (aroma therapy). no change - upgrade toilet room accessories and no signage. no massage.Details
3/f: existing office to be converted into personal service (aroma therapy). no change - upgrade toilet room accessories and no signage. no massage. | |
| May 22, 2024 | Completed final sign-off Oct 2024 | 2940 Geary Bl | remove and replace storefront front door. install grab bar at unisex toilet/shower room.Details
remove and replace storefront front door. install grab bar at unisex toilet/shower room. | $4,700 |
| Apr 4, 2024 | Completed final sign-off Jun 2024 | 160 Valparaiso St | scalfolding front and side of bldg. replace damaged siding with new hardie plank siding approx 3000 sq ftDetails
scalfolding front and side of bldg. replace damaged siding with new hardie plank siding approx 3000 sq ft | $25,000 |
| Mar 6, 2024 | Completed final sign-off Apr 2024 | 2940 Geary Bl | continuation of use (e) fitness studio to proposed fitness studio, install ada touch pads at front entry, install ada accessible front counter.Details
continuation of use (e) fitness studio to proposed fitness studio, install ada touch pads at front entry, install ada accessible front counter. | $5,500 |
| Nov 28, 2023 | Expired or cancelled withdrawn Jun 2024 | 2130 Oakdale Av | revision to pa# 202107295399. 1st revision proposed to remove the proposed elevation & keep the (e) stairs. remove the proposed work @ mezzanie. correct occupancy class from "u" to "f-1" on form 3.Details
revision to pa# 202107295399. 1st revision proposed to remove the proposed elevation & keep the (e) stairs. remove the proposed work @ mezzanie. correct occupancy class from "u" to "f-1" on form 3. | |
| Oct 13, 2023 | Completed final sign-off Feb 2024 | 261 Claremont Bl | comply with complaint 202029540 to rebuild existing stairs at property line in kind due dry rot damage at front entryDetails
comply with complaint 202029540 to rebuild existing stairs at property line in kind due dry rot damage at front entry | $5,000 |
| Oct 5, 2023 | Completed final sign-off May 2024 | 2318 44th Av | build a new deck at rear with stair to rear yard deck fl. less that 10' from gradeDetails
build a new deck at rear with stair to rear yard deck fl. less that 10' from grade | $35,000 |
| May 4, 2023 | Completed final sign-off Jan 2024 | 2130 Oakdale Av | co2 purging system-installation of exhaust system for grow room labeled. installation of co2 monitoring system for gr1,gr2,gr3,a21 room. installation of exhaust system that shall tie to co2 monitoring system located n the roof.Details
co2 purging system-installation of exhaust system for grow room labeled. installation of co2 monitoring system for gr1,gr2,gr3,a21 room. installation of exhaust system that shall tie to co2 monitoring system located n the roof. | $10,000 |
| Aug 30, 2022 | Completed final sign-off May 2024 | 379 Douglass St | recommencement and completion of work approved under pa#202009113946.Details
recommencement and completion of work approved under pa#202009113946. | $20,000 |
| Apr 18, 2022 | Completed final sign-off Oct 2025 | 1741 Stockton St | 1st flr - lower grade, (n) door & windows at facade w/ (n) sunken patio. 2nd flr - 1 story ltwell in-fill, remodel 1 bath, add 1 full bath, relocate laundry. 3rd flr - kitchen remodel w/ bar, full bath remodel, replace 1 window. (n) electrical & plumbing at construction areas.Details
1st flr - lower grade, (n) door & windows at facade w/ (n) sunken patio. 2nd flr - 1 story ltwell in-fill, remodel 1 bath, add 1 full bath, relocate laundry. 3rd flr - kitchen remodel w/ bar, full bath remodel, replace 1 window. (n) electrical & plumbing at construction areas. | $75,000 |
| Jul 29, 2021 | Completed final sign-off Dec 2024 | 2130 Oakdale Av | to propose 2674sf growing room w/ interior partition wall in the main floor. adding 1426sf mezzanine for 1301sf growing room and storage in (e) mezzanine w/ associated mep work in (e) horticultural warehouse.Details
to propose 2674sf growing room w/ interior partition wall in the main floor. adding 1426sf mezzanine for 1301sf growing room and storage in (e) mezzanine w/ associated mep work in (e) horticultural warehouse. | $140,000 |
| Dec 31, 2020 | Never finaled issued Dec 2020, no final | 1107 Page St | apt b: remodel kitchen & bathroom. elecrical & plumbing. replace gyp board with 5/8in type-x.Details
apt b: remodel kitchen & bathroom. elecrical & plumbing. replace gyp board with 5/8in type-x. | $24,000 |
| Dec 31, 2020 | Never finaled issued Dec 2020, no final | 1103 Page St | remodel kitchen & bathroom. elecrical & plumbing. replace gyp board with 5/8in type-x.Details
remodel kitchen & bathroom. elecrical & plumbing. replace gyp board with 5/8in type-x. | $24,000 |
| Dec 31, 2020 | Never finaled issued Dec 2020, no final | 1107 Page St | apt a: remodel kitchen & bathroom. elecrical & plumbing. replace gyp board with 5/8in type-x.Details
apt a: remodel kitchen & bathroom. elecrical & plumbing. replace gyp board with 5/8in type-x. | $24,000 |
| Nov 4, 2020 | Never finaled issued Nov 2020, no final | 1103 Page St | apartment remodel. kitchen and bathroom. in kindDetails
apartment remodel. kitchen and bathroom. in kind | $37,000 |
| Nov 4, 2020 | Never finaled issued Nov 2020, no final | 1105 Page St | apartment remodel. kitchen and bathroom. in kindDetails
apartment remodel. kitchen and bathroom. in kind | $37,000 |
| Sep 11, 2020 | Completed final sign-off May 2024 | 379 Douglass St | kitchen and bath remodel on 1st flDetails
kitchen and bath remodel on 1st fl | $30,000 |
| Feb 20, 2019 | Never finaled issued Feb 2019, no final | 2988 Mission St | to obtain final inspection for work approved under pa# 2016-0706-1716. all work is complete.Details
to obtain final inspection for work approved under pa# 2016-0706-1716. all work is complete. | |
| Jun 13, 2017 | Completed final sign-off Apr 2018 | 22 Harper St | all interior work: remodel 3rd floor only. remodel master bedroom, master bath, modify door at bath, modify walls. remove roof access stairs to (e) roof deck with (n) pull down access ladder, add exhaust fan to bedroom.Details
all interior work: remodel 3rd floor only. remodel master bedroom, master bath, modify door at bath, modify walls. remove roof access stairs to (e) roof deck with (n) pull down access ladder, add exhaust fan to bedroom. | $10,000 |
| Jun 8, 2017 | Completed final sign-off Jun 2017 | 375 Douglass St | revision to pa#2016-11-14-2539. correction of address from 377 douglass st to 375 douglass st.Details
revision to pa#2016-11-14-2539. correction of address from 377 douglass st to 375 douglass st. | |
| Nov 14, 2016 | Completed final sign-off Jun 2017 | 377 Douglass St | kitchen and bathroom remodel, upgrade electrical and replace rear door and windowDetails
kitchen and bathroom remodel, upgrade electrical and replace rear door and window | $15,000 |