Domus Construction & Design
- Based in
- Roseville
- On San Francisco permits
- Jan 2007 to Oct 2013
- Last 24 months
- 0 permits filed
32 permits since 2000: 32 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 3, 2013 | Completed final sign-off Feb 2014 | 1030 Oak St | unit 1030, revision to app#201306078973. enlarge 2 bedroom closet doors. rearrange washer/dryer layout, remove living, dining,kitchen,2 bedrooms plaster and replace with 5/8 type x gyp board.Details
unit 1030, revision to app#201306078973. enlarge 2 bedroom closet doors. rearrange washer/dryer layout, remove living, dining,kitchen,2 bedrooms plaster and replace with 5/8 type x gyp board. | $1,000 |
| Jul 11, 2013 | Completed final sign-off Aug 2014 | 277 Arlington St | revision to pa# 201305096592. relocate (e) stairway, dining, kitchen & bathroom at 2nd sloor. add (n) laudry room at 2nd floor. to complwy with nov 20118936.Details
revision to pa# 201305096592. relocate (e) stairway, dining, kitchen & bathroom at 2nd sloor. add (n) laudry room at 2nd floor. to complwy with nov 20118936. | $10,000 |
| Jun 14, 2013 | Completed final sign-off Apr 2014 | 1919 San Jose Av | horizontal enlargment - 1st fl: add bedroom, family, 2 bath, hall. 2nd fl: remodel kitchen, bath, add full bath & interior stairs to 1st fl. replace rear stairs & deck, like kind. replace all windows, front wood clad type (visible from street)Details
horizontal enlargment - 1st fl: add bedroom, family, 2 bath, hall. 2nd fl: remodel kitchen, bath, add full bath & interior stairs to 1st fl. replace rear stairs & deck, like kind. replace all windows, front wood clad type (visible from street) | $65,000 |
| Jun 7, 2013 | Completed final sign-off Feb 2014 | 1030 Oak St | unit #1030-remodel kitchen & convert study room into full bathroom at 3rd floor onlyDetails
unit #1030-remodel kitchen & convert study room into full bathroom at 3rd floor only | $20,000 |
| Aug 27, 2012 | Completed final sign-off Jan 2013 | 226 Mallorca Wy | remove & replace drywall, electrical & plumbing, relocate shower, new kitchen cabinets, like for like, window in bath.Details
remove & replace drywall, electrical & plumbing, relocate shower, new kitchen cabinets, like for like, window in bath. | $29,500 |
| Jul 9, 2012 | Completed final sign-off Dec 2012 | 744 Clementina St | interior remodel of kitchen, bathroom, bedroom, and living room of unit #1 only.Details
interior remodel of kitchen, bathroom, bedroom, and living room of unit #1 only. | $21,200 |
| Apr 11, 2012 | Completed final sign-off May 2012 | 744 Clementina St | remove and install sheetrock in common area 5/8" type x. new drywall in unit #4 to comply with complaint 201214581.Details
remove and install sheetrock in common area 5/8" type x. new drywall in unit #4 to comply with complaint 201214581. | $4,500 |
| Mar 26, 2012 | Completed final sign-off Aug 2012 | 331 Detroit St | revision to permit # 201108263396. add to plans location of water heater and laundry area per inspector's request.Details
revision to permit # 201108263396. add to plans location of water heater and laundry area per inspector's request. | |
| Feb 22, 2012 | Completed final sign-off May 2012 | 744 Clementina St | refer to pa# 2011-0912-4430, 2011-0504-5391, 2011-0211-0085 & 2011-0128-9241-replace (e) 4x12 in kitchen's (3 total) in kind. work for unit's #2, 4 & 6Details
refer to pa# 2011-0912-4430, 2011-0504-5391, 2011-0211-0085 & 2011-0128-9241-replace (e) 4x12 in kitchen's (3 total) in kind. work for unit's #2, 4 & 6 | $900 |
| Jan 10, 2012 | Completed final sign-off Jul 2012 | 876 Girard St | new rear deck, (legalize deck. for deck only)Details
new rear deck, (legalize deck. for deck only) | $8,450 |
| Nov 15, 2011 | Completed final sign-off Aug 2012 | 331 Detroit St | revision to appl #201108263396 to comply w/complaint #201170714 - repair & replace existing dryrot & door framing at rear bathroom & storage. provide new exterior foundation at rear. demolition deck & siding.Details
revision to appl #201108263396 to comply w/complaint #201170714 - repair & replace existing dryrot & door framing at rear bathroom & storage. provide new exterior foundation at rear. demolition deck & siding. | $15,000 |
| Oct 14, 2011 | Completed final sign-off Mar 2012 | 1629 Dolores St | revision to work under construction for permit#200701081168. revise stair penthouse on north side of building (stair#1) new flue chase on north side & south side of building.Details
revision to work under construction for permit#200701081168. revise stair penthouse on north side of building (stair#1) new flue chase on north side & south side of building. | $1,000 |
| Sep 19, 2011 | Completed final sign-off Oct 2011 | 350 Upper Tr | repair dry rot in front and back wall per fox structural report and termite report #6aDetails
repair dry rot in front and back wall per fox structural report and termite report #6a | $4,000 |
| Sep 12, 2011 | Completed final sign-off May 2012 | 744 Clementina St | repl existing windows with new windows in kind at 13 total windows, unit #4,5 &6 same openings not visible from street, dry wall in unit#5 and #6 for electrical and plumbing upgrades; u-factor for windows .40 maxDetails
repl existing windows with new windows in kind at 13 total windows, unit #4,5 &6 same openings not visible from street, dry wall in unit#5 and #6 for electrical and plumbing upgrades; u-factor for windows .40 max | $18,000 |
| Aug 26, 2011 | Completed final sign-off Aug 2012 | 331 Detroit St | kithen & three bathrooms remodel. replace windows & sliding door, new entry door within (e) opening same size. new garage door. dry rot repair at entry stair less than 50%. per mit to comply with n.o.v. dated 12-1498, complaint # 199817780.Details
kithen & three bathrooms remodel. replace windows & sliding door, new entry door within (e) opening same size. new garage door. dry rot repair at entry stair less than 50%. per mit to comply with n.o.v. dated 12-1498, complaint # 199817780. | $45,500 |
| May 5, 2011 | Completed final sign-off Mar 2012 | 1629 Dolores St | revision to work under construction for permit #200701081168. structural strong wal detail revision and shearwall connection to steel frame detail.Details
revision to work under construction for permit #200701081168. structural strong wal detail revision and shearwall connection to steel frame detail. | |
| May 4, 2011 | Completed final sign-off May 2012 | 744 Clementina St | #4- kitchen and bathroom remodeling, plumbing & electrical work incl. lighting to comply with cec 150(k). no change to walls, windows or doors.Details
#4- kitchen and bathroom remodeling, plumbing & electrical work incl. lighting to comply with cec 150(k). no change to walls, windows or doors. | $26,000 |
| Apr 28, 2011 | Completed final sign-off Feb 2012 | 82 29th St | to comply with nov# 200733410 of 11/30/2007. replacement of a damaged stair at rear of property for residential unit at 82 29th st.Details
to comply with nov# 200733410 of 11/30/2007. replacement of a damaged stair at rear of property for residential unit at 82 29th st. | $8,000 |
| Apr 25, 2011 | Completed final sign-off Jun 2011 | 1023 Church St | kitchen & bathroom remodeling-kitchen al least 50% high efficacy lighting by wattage, cec 150(k). bathroom-high efficacy or occupancy sensorDetails
kitchen & bathroom remodeling-kitchen al least 50% high efficacy lighting by wattage, cec 150(k). bathroom-high efficacy or occupancy sensor | $35,566 |
| Mar 18, 2011 | Completed final sign-off Apr 2011 | 1575 Broadway | unit # 14: change window in bathroom, to comply with nov 201081467.Details
unit # 14: change window in bathroom, to comply with nov 201081467. | $100 |
| Feb 11, 2011 | Completed final sign-off May 2012 | 744 Clementina St | revision to app#201101289241 will not do drywall in unit 4. reduce scope of work. no work in unit #4. only plumbing work.Details
revision to app#201101289241 will not do drywall in unit 4. reduce scope of work. no work in unit #4. only plumbing work. | |
| Jan 28, 2011 | Completed final sign-off May 2012 | 744 Clementina St | #2, 5, 6- demolition & remodeling kitchen and bath at unit #2, 5 & 6. to comply nov #200672987, 200676707, 20075056- plumbing, electrical, drywall, replace 4 (e) window at rear in unit #2 same size, drywall at unit #2 & 4 5/8" type x gyp. in kind. no structural work.Details
#2, 5, 6- demolition & remodeling kitchen and bath at unit #2, 5 & 6. to comply nov #200672987, 200676707, 20075056- plumbing, electrical, drywall, replace 4 (e) window at rear in unit #2 same size, drywall at unit #2 & 4 5/8" type x gyp. in kind. no structural work. | $50,000 |
| Jan 27, 2011 | Completed final sign-off Jul 2011 | 350 Upper Tr | fix stucco (small area) same color- one code, repl (e) drywall to new in kind visible from street, rev permit 201101208733; area 50 ft,n o structural work, repair in kindDetails
fix stucco (small area) same color- one code, repl (e) drywall to new in kind visible from street, rev permit 201101208733; area 50 ft,n o structural work, repair in kind | $4,000 |
| Jan 20, 2011 | Completed final sign-off Jul 2011 | 350 Upper Tr | new walls and replace e window with door. same size, relocate doorsDetails
new walls and replace e window with door. same size, relocate doors | $6,000 |
| Jan 18, 2011 | Completed final sign-off Jul 2011 | 350 Upper Tr | replace two garage doors only.Details
replace two garage doors only. | $4,000 |
| Oct 29, 2010 | Completed final sign-off Jun 2011 | 127 Vienna St | stair repair; front stair to be repaired in kindDetails
stair repair; front stair to be repaired in kind | $5,000 |
| Oct 13, 2010 | Completed final sign-off Jul 2011 | 350 Upper Tr | replace (e) window to new window, same size, same locations, u-factor 0.40 maxDetails
replace (e) window to new window, same size, same locations, u-factor 0.40 max | $15,000 |
| Oct 13, 2010 | Completed final sign-off Feb 2011 | 26 Cervantes Bl | kitchen and 2 bath remodeling, kitchen: at least 50% high efficacy lighting (by wattage); bathrm- high efficacy lighting or occupancy sensorDetails
kitchen and 2 bath remodeling, kitchen: at least 50% high efficacy lighting (by wattage); bathrm- high efficacy lighting or occupancy sensor | $10,000 |
| Sep 24, 2010 | Completed final sign-off Jul 2011 | 350 Upper Tr | unit #1 & 2- kitchen and one bath remodeling, no structural changes, new lighting comply with cec 150(k)Details
unit #1 & 2- kitchen and one bath remodeling, no structural changes, new lighting comply with cec 150(k) | $35,000 |
| Jun 17, 2010 | Completed final sign-off Nov 2010 | 332 Wilde Av | comply with nov 201045581: kitchen and bath remodel on 2nd floor. repaint all interior walls. verify gr floor bedrooms per approved app 200606204497.Details
comply with nov 201045581: kitchen and bath remodel on 2nd floor. repaint all interior walls. verify gr floor bedrooms per approved app 200606204497. | $8,000 |
| Jun 19, 2009 | Completed final sign-off Apr 2010 | 2189 Pine St | replace (e) eroded footing at left rear of (e) building. add new footing at catilever floorDetails
replace (e) eroded footing at left rear of (e) building. add new footing at catilever floor | $40,000 |
| Jan 8, 2007 | Completed final sign-off Mar 2012 | 1629 Dolores St | to erect 3 dwelling units with 4 story new condominium bldgDetails
to erect 3 dwelling units with 4 story new condominium bldg | $975,000 |