Dohrmann Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jun 2002 to Oct 2025
- Last 24 months
- 1 permit filed
32 permits since 2000: 28 completed, 4 never finaled.
Of the 4 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 14, 2025 | Completed final sign-off Nov 2025 | 947 Lake St | bathroom remodel. replacing surfae finishes only. medicine cabinet, toilet, sink at existing locations only.Details
bathroom remodel. replacing surfae finishes only. medicine cabinet, toilet, sink at existing locations only. | $40,000 |
| Oct 6, 2022 | Completed final sign-off Apr 2023 | 1080 Chestnut St | rev to pa# 222-0329-1083: built in cabinetry, new doors at (e) location new carpet, refinish hardwood floorsDetails
rev to pa# 222-0329-1083: built in cabinetry, new doors at (e) location new carpet, refinish hardwood floors | $155,000 |
| Mar 29, 2022 | Completed final sign-off Apr 2023 | 1080 Chestnut St | unit 11d: interior remodel. kitchen + baths. kitchen, bath's walls as shown on plan. remove all interior doors, trim, cabinetry, and plumbing fixtures at kitchen, bath's.Details
unit 11d: interior remodel. kitchen + baths. kitchen, bath's walls as shown on plan. remove all interior doors, trim, cabinetry, and plumbing fixtures at kitchen, bath's. | $20,000 |
| Nov 1, 2021 | Never finaled issued Nov 2021, no final | 1515 Willard St | repair and replace in kind approximately 900 sqft shingle cedar siding.Details
repair and replace in kind approximately 900 sqft shingle cedar siding. | $10,000 |
| Mar 23, 2021 | Completed final sign-off Jun 2021 | 2747 41st Av | removal and replace of existing front facade exterior stucco (approx 300 sf) to match existing texture (not at entrance area, only up to gate) replace 2 front della windows in-kind. address any dry rotted framing as need @ face of bldg. paint at work area. no size chamge to windows. wood interior alDetails
removal and replace of existing front facade exterior stucco (approx 300 sf) to match existing texture (not at entrance area, only up to gate) replace 2 front della windows in-kind. address any dry rotted framing as need @ face of bldg. paint at work area. no size chamge to windows. wood interior al | $20,000 |
| Jul 9, 2020 | Completed final sign-off Dec 2020 | 655 18th Av | adding approx 15 sq ft of concrete repair. revision to app#200912189871Details
adding approx 15 sq ft of concrete repair. revision to app#200912189871 | $2,500 |
| Jan 3, 2020 | Never finaled issued Jan 2020, no final | 2850 Cabrillo St | street spaceDetails
street space | |
| Jan 3, 2020 | Never finaled issued Jan 2020, no final | 1650 Broadway | street spaceDetails
street space | |
| Dec 18, 2019 | Completed final sign-off Dec 2020 | 655 18th Av | ground fl remodel interior rooms on the 2nd fl remodel bath, replace all exterior rear windows. no additonal sf added. voluntary shearwalls.Details
ground fl remodel interior rooms on the 2nd fl remodel bath, replace all exterior rear windows. no additonal sf added. voluntary shearwalls. | $170,000 |
| Oct 10, 2019 | Completed final sign-off Jan 2020 | 299 Edgewood Av | kitchen paint all nw & extg cabinets, ceiling, walls & doors. remove all extg countertops & replace with nw stone. replace extg sink & fuacet. remove extg kitchen tile flr, replace with hardwood. powder rm replace nw sink & vanity. replace in kind, no structural work, cec 150-0 (k)3/cec150.0(k5)Details
kitchen paint all nw & extg cabinets, ceiling, walls & doors. remove all extg countertops & replace with nw stone. replace extg sink & fuacet. remove extg kitchen tile flr, replace with hardwood. powder rm replace nw sink & vanity. replace in kind, no structural work, cec 150-0 (k)3/cec150.0(k5) | $40,000 |
| Sep 19, 2019 | Completed final sign-off Feb 2020 | 1650 Broadway | finish/fixture updates: fresh paint througout, decorative treatment/finish on livingroom ceiling soffit, wall paper installation in pantry, master bedroom, replaceing, pantry & lanundry room doors, replacing master bedroom water closet glass enclosre with wood paneled doorDetails
finish/fixture updates: fresh paint througout, decorative treatment/finish on livingroom ceiling soffit, wall paper installation in pantry, master bedroom, replaceing, pantry & lanundry room doors, replacing master bedroom water closet glass enclosre with wood paneled door | $150,000 |
| Aug 15, 2019 | Completed final sign-off Mar 2020 | 2850 Cabrillo St | remove non-bearing interior partition. new full bath at 1st floor.Details
remove non-bearing interior partition. new full bath at 1st floor. | $35,360 |
| Apr 15, 2019 | Completed final sign-off Oct 2019 | 2201 Sacramento St | apt 101: remodel interior bathroom, kitchen, revise (e) plumbing locations, new fixtures, new electrical fixtures at (e) locations, new tile at bath floors, kithen relocate plumbing as per plan, new fixtures, paint through out, washier and dryer added, removal of electric fire place n/a maherDetails
apt 101: remodel interior bathroom, kitchen, revise (e) plumbing locations, new fixtures, new electrical fixtures at (e) locations, new tile at bath floors, kithen relocate plumbing as per plan, new fixtures, paint through out, washier and dryer added, removal of electric fire place n/a maher | $65,000 |
| Feb 27, 2014 | Completed final sign-off Aug 2014 | 1838 Laguna St | cosmetic interior remodeling at two existing 2/f baths. replacing vanities, toilets, shower pan, & curb at west bath, & tile.Details
cosmetic interior remodeling at two existing 2/f baths. replacing vanities, toilets, shower pan, & curb at west bath, & tile. | $40,000 |
| Oct 30, 2012 | Completed final sign-off Apr 2013 | 1243 41st Av | replace stucco and repair dryrot and replace aluminum clad with wood window in kind. replace 4 front windows with aluminum clad with wood. stucco repair to entire front.Details
replace stucco and repair dryrot and replace aluminum clad with wood window in kind. replace 4 front windows with aluminum clad with wood. stucco repair to entire front. | $30,000 |
| Oct 26, 2011 | Completed final sign-off Mar 2012 | 753 Vermont St | revision to app#201012176901 for the following changes: 1) interior remodeling at 2nd floor to expand bath 1 and reconfigure the adjacent bedroom 1 walkin closet, 2) removal of the fireplace/heater from bedroom 1 and to change door #6 to the room,3) change the door and window configuration at theDetails
revision to app#201012176901 for the following changes: 1) interior remodeling at 2nd floor to expand bath 1 and reconfigure the adjacent bedroom 1 walkin closet, 2) removal of the fireplace/heater from bedroom 1 and to change door #6 to the room,3) change the door and window configuration at the | |
| Oct 4, 2011 | Completed final sign-off Dec 2011 | 1435 12th Av | sound proof extg 1st floor work room. all exterior walls and ceiling, replace extg windows with double pane casements. add bathroom into extg work room.install addtional receptacles and lights.Details
sound proof extg 1st floor work room. all exterior walls and ceiling, replace extg windows with double pane casements. add bathroom into extg work room.install addtional receptacles and lights. | $30,000 |
| Dec 17, 2010 | Completed final sign-off Mar 2012 | 753 Vermont St | rear addition with one and two story portions and replacement bath. interior remodeling at existing second floor rear bedroom, five new skylights at existing roof. total increase in habitable space =324 sqft. excavation and new patio and retaining walls at rear yard.Details
rear addition with one and two story portions and replacement bath. interior remodeling at existing second floor rear bedroom, five new skylights at existing roof. total increase in habitable space =324 sqft. excavation and new patio and retaining walls at rear yard. | $85,000 |
| Jul 27, 2010 | Completed final sign-off Mar 2011 | 325 Dorantes Av | repair existing front entrance stairs in kind, replace treads gaurdrail & handrail, less than 50% of stairs.Details
repair existing front entrance stairs in kind, replace treads gaurdrail & handrail, less than 50% of stairs. | $10,000 |
| May 27, 2010 | Completed final sign-off Oct 2010 | 129 21st Av | install (n) hardy frame panels with (n) concrete foundation adjacent to garage door @ garage level.Details
install (n) hardy frame panels with (n) concrete foundation adjacent to garage door @ garage level. | $10,000 |
| Mar 10, 2010 | Completed final sign-off Oct 2010 | 129 21st Av | remove (e) closet in master bedroom, add two new wardrobe and new shower on 3rd floor.Details
remove (e) closet in master bedroom, add two new wardrobe and new shower on 3rd floor. | $16,000 |
| Sep 1, 2009 | Completed final sign-off Jun 2010 | 1570 16th Av | kitchen remodel w/ (n) roof construction. guest bath remodel. enclosure of (e) entry; (n) 150 sq.ft. of conditioned space. (n) roof. (n) furnace, lighting + upgrade misc. services. (n) stucco @ front & side + landscape at front.Details
kitchen remodel w/ (n) roof construction. guest bath remodel. enclosure of (e) entry; (n) 150 sq.ft. of conditioned space. (n) roof. (n) furnace, lighting + upgrade misc. services. (n) stucco @ front & side + landscape at front. | $120,000 |
| Jul 10, 2008 | Completed final sign-off Oct 2008 | 1838 Laguna St | cosmetic remodel of (e) kitchen and pantry with exterior mechanical soffit under (e) rear building overhang per plan.Details
cosmetic remodel of (e) kitchen and pantry with exterior mechanical soffit under (e) rear building overhang per plan. | $20,000 |
| May 8, 2006 | Completed final sign-off May 2006 | 2008 Lyon St | renew permit for final inspection 200506276111.Details
renew permit for final inspection 200506276111. | |
| Aug 18, 2005 | Completed final sign-off Sep 2005 | 472 Belvedere St | renew#200503187911Details
renew#200503187911 | |
| Aug 18, 2005 | Completed final sign-off Sep 2005 | 466 Belvedere St | renew app#200310278652 .Details
renew app#200310278652 . | |
| Apr 7, 2005 | Completed final sign-off Jun 2005 | 2845 Union St | retiling of 2 bathrooms with new fixtures & accessories; water damage repair including refinishingDetails
retiling of 2 bathrooms with new fixtures & accessories; water damage repair including refinishing | $52,000 |
| Feb 27, 2004 | Completed final sign-off Mar 2004 | 625 Pacheco St | renew appl#200309225309 & 200103295517 for final inspectionDetails
renew appl#200309225309 & 200103295517 for final inspection | |
| Nov 7, 2003 | Completed final sign-off Mar 2004 | 122 06th Av | add a new 3/4 bahtrm in house,add a new zero-clearance fire place, connect to (e)chimney flueDetails
add a new 3/4 bahtrm in house,add a new zero-clearance fire place, connect to (e)chimney flue | $15,000 |
| Apr 30, 2003 | Never finaled issued Apr 2003, no final | 944 Lake St | revision to :200204265149 change to 3rd fl shear wall per s.e. field approvalDetails
revision to :200204265149 change to 3rd fl shear wall per s.e. field approval | |
| Sep 11, 2002 | Completed final sign-off Nov 2002 | 220 Eureka St | remove roofing & replace w/ new to match extng minor dryrot repair. install new garage doors in kindDetails
remove roofing & replace w/ new to match extng minor dryrot repair. install new garage doors in kind | $7,800 |
| Jun 20, 2002 | Completed final sign-off Aug 2002 | 262 Santa Paula Av | replace subtop on counter in kitchen subfloor in kitchen raise archways leading to living & diningDetails
replace subtop on counter in kitchen subfloor in kitchen raise archways leading to living & dining | $4,000 |