Permit GraphShortlistSan Francisco building permits since 2000

Doherty Construction

Contractor license
1098696
State license record
Based in
San Francisco
On San Francisco permits
Jan 2023 to Jun 2025
Last 24 months
2 permits filed

3 permits since 2000: 2 completed, 1 never finaled.

Of the 1 never-finaled permit, 1 is 3 to 5 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Most recent permits

AllStairs 1
FiledOutcomeAddressWork described on the permitDeclared cost
Jun 25, 2025Completed
final sign-off Aug 2025
447 42nd Avreplace dry rotted section of the stud wall at lightwell. voluntary strengthening seismic resident elements, strengthen staircase by nailing exterior wall
Details
Permit
202506259395
Status
complete
Filed
Jun 25, 2025
Permit issued
Jun 26, 2025
Final sign-off
Aug 22, 2025
Declared cost
$5,000
Address
447 42nd Av

replace dry rotted section of the stud wall at lightwell. voluntary strengthening seismic resident elements, strengthen staircase by nailing exterior wall

Open the permit page

$5,000
May 20, 2025Completed
final sign-off Aug 2025
447 42nd Avsame siding needs to be replaced approx 8x8 square feet, not street visible, (back of building) add ladder going to roof needs to be removed. ladder is 8ft x 2. to comply nov 202533091. item no 2,3,4,5,6
Details
Permit
202505206916
Status
complete
Filed
May 20, 2025
Permit issued
May 20, 2025
Final sign-off
Aug 22, 2025
Declared cost
$5,000
Address
447 42nd Av

same siding needs to be replaced approx 8x8 square feet, not street visible, (back of building) add ladder going to roof needs to be removed. ladder is 8ft x 2. to comply nov 202533091. item no 2,3,4,5,6

Open the permit page

$5,000
Jan 27, 2023Never finaled
issued Jan 2023, no final
59 Newburg Stbreak off stucco around bat window approx 30 sqft. replace rotten plywood and maybe a stud or two, put back new stucco patch and paint.
Details
Permit
202301270877
Status
issued
Filed
Jan 27, 2023
Permit issued
Jan 27, 2023
Declared cost
$5,500
Address
59 Newburg St

break off stucco around bat window approx 30 sqft. replace rotten plywood and maybe a stud or two, put back new stucco patch and paint.

Open the permit page

$5,500