Dmsquare Construction
- Based in
- San Francisco
- On San Francisco permits
- Jul 2006 to May 2018
- Last 24 months
- 0 permits filed
48 permits since 2000: 43 completed, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 23, 2018 | Completed final sign-off Jul 2019 | 2835 Clay St | dry rot repair at right side.Details
dry rot repair at right side. | $20,000 |
| May 10, 2017 | Completed final sign-off Oct 2017 | 2238 Vicente St | unit #4 - remodel 3rd floor back unit work to include changing inside floor plan to add 1 new bedroom, relocate kitchen, remodel bathroom; replacing 4 windows & adding 1 new window.Details
unit #4 - remodel 3rd floor back unit work to include changing inside floor plan to add 1 new bedroom, relocate kitchen, remodel bathroom; replacing 4 windows & adding 1 new window. | $10,000 |
| Jun 20, 2016 | Completed final sign-off Jul 2019 | 2238 Vicente St | unit legalization ordinance 43-14. legalize in law uit on ground floor of building and to build new kitchen with stove, cabinets, fan & refrigerator & sink, contruct (relocate) bathroom to new location with showver stall, vanity and toilet & all associated elctrical & plumbing work.Details
unit legalization ordinance 43-14. legalize in law uit on ground floor of building and to build new kitchen with stove, cabinets, fan & refrigerator & sink, contruct (relocate) bathroom to new location with showver stall, vanity and toilet & all associated elctrical & plumbing work. | $12,000 |
| Mar 29, 2016 | Completed final sign-off Nov 2017 | 3195 San Bruno Av | to comply w/201586881 - remove non-bearing walls to add 1 full bathroom on 2nd floor. relocate kitchen counter per plan. n/a maher ordinanceDetails
to comply w/201586881 - remove non-bearing walls to add 1 full bathroom on 2nd floor. relocate kitchen counter per plan. n/a maher ordinance | $10,000 |
| Jan 22, 2016 | Completed final sign-off Nov 2017 | 3195 San Bruno Av | revision to pa 201512034117l: turn power room to full bathroom on 1st. add 1 bathroom on 1st flr. add 1 bedroom on 2nd. relocate closet opening on 2nd flr. bearing wall to be removed on 2nd. maher naDetails
revision to pa 201512034117l: turn power room to full bathroom on 1st. add 1 bathroom on 1st flr. add 1 bedroom on 2nd. relocate closet opening on 2nd flr. bearing wall to be removed on 2nd. maher na | |
| Dec 18, 2015 | Completed final sign-off Jan 2017 | 2835 Clay St | soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4. provide shear walls & moment frame at ground for soft story retrofitDetails
soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4. provide shear walls & moment frame at ground for soft story retrofit | $90,000 |
| Dec 3, 2015 | Completed final sign-off Aug 2016 | 3195 San Bruno Av | relocate (e) full bath on 1st floor per plan; add one office & powder on 1st floor per plan; legalize as-built full bath (bath #2) add bedroom #3 on 2nd floor per plan; remodel (e) bath #1 on 2nd floor; add one full bath (bath #3) on 2nd floor per plan. maher naDetails
relocate (e) full bath on 1st floor per plan; add one office & powder on 1st floor per plan; legalize as-built full bath (bath #2) add bedroom #3 on 2nd floor per plan; remodel (e) bath #1 on 2nd floor; add one full bath (bath #3) on 2nd floor per plan. maher na | $40,000 |
| Dec 23, 2014 | Never finaled issued Dec 2014, no final | 11 University St | 1/ add deck in rear per plan; 2/add 2 bedrooms, 2 bathrooms, game room & office on 1//f per planDetails
1/ add deck in rear per plan; 2/add 2 bedrooms, 2 bathrooms, game room & office on 1//f per plan | $48,000 |
| Dec 18, 2014 | Completed final sign-off Apr 2016 | 725 Rolph St | provide new wood deck at the back of the rear yard. add 2 new french door sizes 72" x 79" at the rear yard sides.Details
provide new wood deck at the back of the rear yard. add 2 new french door sizes 72" x 79" at the rear yard sides. | $10,000 |
| Dec 15, 2014 | Completed final sign-off Feb 2015 | 3450 Scott St | to comply with physical inspection report cc-7600Details
to comply with physical inspection report cc-7600 | $2,000 |
| Dec 15, 2014 | Completed final sign-off Feb 2015 | 3452 Scott St | to comply with physical inspection report cc-7600Details
to comply with physical inspection report cc-7600 | $2,000 |
| Nov 12, 2014 | Expired or cancelled expired Jul 2017 | 2476 21st Av | replace drywall, remodel kitchen, remodel bathroom.Details
replace drywall, remodel kitchen, remodel bathroom. | $15,000 |
| Oct 22, 2014 | Completed final sign-off Apr 2016 | 725 Rolph St | add full bathroom at the gound floor. relocating furnace & washer/dryer.Details
add full bathroom at the gound floor. relocating furnace & washer/dryer. | $10,000 |
| Jan 9, 2013 | Completed final sign-off May 2013 | 2238 Vicente St | work @ unit# 2 & ground level only. convert 2 (e) storage rooms to bedrooms on 1st floor. relocate kitchen & bathroom. remodel consists of vanity & ventilation fan replacement only on 2nd floor. replace windows in kind on 2nd floor per plan at rear (4 windows only). construct new stair per plan.Details
work @ unit# 2 & ground level only. convert 2 (e) storage rooms to bedrooms on 1st floor. relocate kitchen & bathroom. remodel consists of vanity & ventilation fan replacement only on 2nd floor. replace windows in kind on 2nd floor per plan at rear (4 windows only). construct new stair per plan. | $40,300 |
| Dec 31, 2012 | Completed final sign-off Feb 2013 | 2051 35th Av | remodel kitchen (change cabinets and floor tile) lighting shall comply with title 24Details
remodel kitchen (change cabinets and floor tile) lighting shall comply with title 24 | $3,000 |
| Sep 26, 2012 | Completed final sign-off Mar 2013 | 98 25th Av | remodel master bedroom, hallway closet, childs room and closet.all non load bearing partitionsDetails
remodel master bedroom, hallway closet, childs room and closet.all non load bearing partitions | $20,000 |
| Aug 31, 2012 | Completed final sign-off Mar 2013 | 150 El Camino Del Mar | remodel 2 bathroom @ 4th floorDetails
remodel 2 bathroom @ 4th floor | $22,000 |
| Aug 1, 2012 | Completed final sign-off Oct 2012 | 2238 Vicente St | revision to 201204128194 to change: new wall and door orientation and location, change location of new shower stall, change new door location and new door to close off area under stairsDetails
revision to 201204128194 to change: new wall and door orientation and location, change location of new shower stall, change new door location and new door to close off area under stairs | $500 |
| May 2, 2012 | Completed final sign-off Jun 2012 | 2238 Vicente St | replace/existing window in the back unit kitchen facing the interior light well on the 2nd flr; move 1 bathroom sink existing to provide more clearance from existing toilet to comply with nov 201218241; u value less 0.4Details
replace/existing window in the back unit kitchen facing the interior light well on the 2nd flr; move 1 bathroom sink existing to provide more clearance from existing toilet to comply with nov 201218241; u value less 0.4 | $500 |
| Apr 23, 2012 | Completed final sign-off Jun 2012 | 1526 17th Av | remodel kitchen with change floor tile and cabinet.Details
remodel kitchen with change floor tile and cabinet. | $5,000 |
| Apr 12, 2012 | Completed final sign-off Oct 2012 | 2238 Vicente St | ground floor - install 3 partition walls, 2 doors, replace existing bathroom vanity & toilet & install new shower stall.construct wood flooring, sheetrock walls & ceilings on existing framing all in ground level.Details
ground floor - install 3 partition walls, 2 doors, replace existing bathroom vanity & toilet & install new shower stall.construct wood flooring, sheetrock walls & ceilings on existing framing all in ground level. | $3,000 |
| Oct 18, 2011 | Completed final sign-off Apr 2012 | 2639 21st Av | fill in space under 2nd floor sunroom, to add one famil room, two bedroom and full bathroom on existing ground floor.Details
fill in space under 2nd floor sunroom, to add one famil room, two bedroom and full bathroom on existing ground floor. | $33,000 |
| May 3, 2011 | Completed final sign-off Sep 2011 | 2332 Ortega St | add approx 413 sq ft. add 2 bedrooms and 2 bathrooms at 1st floor.Details
add approx 413 sq ft. add 2 bedrooms and 2 bathrooms at 1st floor. | $26,000 |
| Aug 26, 2010 | Completed final sign-off Sep 2011 | 2835 Clay St | replace siding about 50-100 sq.ft. at hallway which right side of building not face to the streetDetails
replace siding about 50-100 sq.ft. at hallway which right side of building not face to the street | $3,000 |
| Jul 30, 2010 | Completed final sign-off Aug 2010 | 1815 20th Av | replace stucco about 50-100 sq.ft. in front side of building.Details
replace stucco about 50-100 sq.ft. in front side of building. | $2,500 |
| Jul 23, 2010 | Completed final sign-off Dec 2011 | 3156 Mission St | to comply with complaint case #200920422 & 200928663; fire rate existing hallway for exiting passageway, replace existing doors with new fire-rated doors.Details
to comply with complaint case #200920422 & 200928663; fire rate existing hallway for exiting passageway, replace existing doors with new fire-rated doors. | $10,000 |
| Jul 23, 2010 | Completed final sign-off Dec 2011 | 3158 Mission St | to comply w/ nov complaint #200917441 & 200919361 & 200920421; fire rate existing hallway for exiting passageway. replace existing doors with new fire-rated door.Details
to comply w/ nov complaint #200917441 & 200919361 & 200920421; fire rate existing hallway for exiting passageway. replace existing doors with new fire-rated door. | $10,000 |
| Jul 13, 2010 | Completed final sign-off Mar 2011 | 3735 Anza St | to complete and finanize work under appl#200806204964Details
to complete and finanize work under appl#200806204964 | $2,000 |
| Feb 26, 2010 | Completed final sign-off Feb 2012 | 3156 Mission St | fix leaking ceiling, 4 sf. comply with his nov 200920422 and 200928663 dated 9/1/09 and 12/9/09Details
fix leaking ceiling, 4 sf. comply with his nov 200920422 and 200928663 dated 9/1/09 and 12/9/09 | $500 |
| Feb 11, 2010 | Completed final sign-off Jun 2010 | 2223 Francisco St | need to repair backstairs under 50%Details
need to repair backstairs under 50% | $2,000 |
| Jan 13, 2010 | Never finaled issued Jan 2010, no final | 55 Forest View Dr | replace garage door at existing openingDetails
replace garage door at existing opening | $600 |
| Nov 19, 2009 | Completed final sign-off Jan 2010 | 1894 31st Av | remodel kitchen, new cabinets, replace floor tiles with tiles. no wall removal.Details
remodel kitchen, new cabinets, replace floor tiles with tiles. no wall removal. | $4,000 |
| Nov 16, 2009 | Completed final sign-off Nov 2009 | 507 Fell St | comply with complaint #200926041-repair drainage pipes at bacj side, repair siding above kitchen door at back side. fix kitchen cabinet door, fix dishwasher & maintain fire escape ladderDetails
comply with complaint #200926041-repair drainage pipes at bacj side, repair siding above kitchen door at back side. fix kitchen cabinet door, fix dishwasher & maintain fire escape ladder | $2,500 |
| Aug 3, 2009 | Completed final sign-off Nov 2009 | 3009 Balboa St | install one exercise room and full bathroom at garage floor.Details
install one exercise room and full bathroom at garage floor. | $15,000 |
| Apr 24, 2009 | Completed final sign-off Jul 2009 | 1526 17th Av | remodle bathroom. (changing bath, sink, toilet & tile. also light and venthood).Details
remodle bathroom. (changing bath, sink, toilet & tile. also light and venthood). | $9,000 |
| Jan 22, 2009 | Completed final sign-off Apr 2009 | 766 London St | remodel existing bathrm & add one new bathrm, replace existing window in kind at rear, all work at 2nd fl. construct one new bathrm & remove/replace existing furnace, water heater, all work at ground fl.Details
remodel existing bathrm & add one new bathrm, replace existing window in kind at rear, all work at 2nd fl. construct one new bathrm & remove/replace existing furnace, water heater, all work at ground fl. | $32,000 |
| Sep 25, 2008 | Never finaled issued Sep 2008, no final | 1214 20th Av | repair floor 200 sq. ft. replace plywood for floor in living room. replace in kind.Details
repair floor 200 sq. ft. replace plywood for floor in living room. replace in kind. | $2,000 |
| May 28, 2008 | Completed final sign-off Aug 2008 | 2390 30th Av | install one office room, one bedroom, one bathroom at garage floorDetails
install one office room, one bedroom, one bathroom at garage floor | $20,000 |
| May 8, 2008 | Completed final sign-off Aug 2008 | 2082 43rd Av | remodel bath & kitchen. no structural work.Details
remodel bath & kitchen. no structural work. | $14,624 |
| Feb 26, 2008 | Completed final sign-off May 2008 | 2001 Noriega St | convert dinning room on second floor to bedroom. convert portion of garage to bedroom and a full bathDetails
convert dinning room on second floor to bedroom. convert portion of garage to bedroom and a full bath | $16,000 |
| Aug 6, 2007 | Completed final sign-off Feb 2008 | 71 Bemis St | remodel kitchen (replace kitchen cabinets, counter, fixtures)Details
remodel kitchen (replace kitchen cabinets, counter, fixtures) | $5,000 |
| Jun 29, 2007 | Never finaled issued Jun 2007, no final | 3009 Balboa St | replace stucco about 100 sqft in front.Details
replace stucco about 100 sqft in front. | $750 |
| Mar 19, 2007 | Completed final sign-off Apr 2007 | 9 Toyon Ln | replace stucco about 100 sq ft at front in kindDetails
replace stucco about 100 sq ft at front in kind | $3,000 |
| Feb 26, 2007 | Completed final sign-off May 2007 | 725 Rolph St | remodle utilities room no equipment relocation (e) changeing laundry sink @ garage in kind. changing 100 amp service and add (e) outlet under electrical permit.Details
remodle utilities room no equipment relocation (e) changeing laundry sink @ garage in kind. changing 100 amp service and add (e) outlet under electrical permit. | $2,500 |
| Feb 26, 2007 | Completed final sign-off Apr 2007 | 9 Toyon Ln | remodel toilet, bath & sink in bathroom.Details
remodel toilet, bath & sink in bathroom. | $4,500 |
| Oct 20, 2006 | Completed final sign-off Jan 2007 | 2 Denslowe Dr | to compy w/nov#200679374.remodel one kitchen. new cabinets, countertop & appliances. new sheetrock @ 1 wall in kitchen. non structural work.Details
to compy w/nov#200679374.remodel one kitchen. new cabinets, countertop & appliances. new sheetrock @ 1 wall in kitchen. non structural work. | $7,500 |
| Jul 31, 2006 | Completed final sign-off Aug 2006 | 1461 Church St | change broken pipe at outside of building. change electrical wiring the basement (crawl space). remove & replace concrete slab of side of building.Details
change broken pipe at outside of building. change electrical wiring the basement (crawl space). remove & replace concrete slab of side of building. | $1,200 |
| Jul 26, 2006 | Completed final sign-off Oct 2006 | 1590 12th Av | remodeling bathroom. kitchen (changing cabinet and tiles. flourencent lighting.Details
remodeling bathroom. kitchen (changing cabinet and tiles. flourencent lighting. | $8,000 |