Dl Hymes Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2012 to Oct 2013
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 28, 2013 | Completed final sign-off Oct 2014 | 48 Farview Ct | 2 bathroom remodels, replace with like kind, framing as needed, demo ,valve sets, fixtures, plumbing to code exhaust fan ,ducting,flourescent lights, electrical to code,insulate open walls, dry wall tile ,cabinets, shower door paint, title 24 compliance, lighting to comply with cec 150kDetails
2 bathroom remodels, replace with like kind, framing as needed, demo ,valve sets, fixtures, plumbing to code exhaust fan ,ducting,flourescent lights, electrical to code,insulate open walls, dry wall tile ,cabinets, shower door paint, title 24 compliance, lighting to comply with cec 150k | $28,635 |
| Sep 28, 2012 | Completed final sign-off May 2013 | 40 Farview Ct | bath#1 remove tile, cabinets, fixtures, repair water damage,reframe non struct. per plans, replumb shower stall and tie in. add gfic wl fan/light energy compliant lighting,elect per code, new tile, cabinets,fixtures, shower, shower door,patch paint. bath #2 add ex fan, gfic elect per code.Details
bath#1 remove tile, cabinets, fixtures, repair water damage,reframe non struct. per plans, replumb shower stall and tie in. add gfic wl fan/light energy compliant lighting,elect per code, new tile, cabinets,fixtures, shower, shower door,patch paint. bath #2 add ex fan, gfic elect per code. | $16,000 |