Discovery Carpet And Flooring
- Based in
- Daly City
- On San Francisco permits
- Aug 2016 to Mar 2022
- Last 24 months
- 0 permits filed
3 permits since 2000: 1 completed, 2 never finaled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 28, 2022 | Completed final sign-off Jun 2022 | 270 Mcallister St | install new drywall on ceiling put compound primer and paint, also ceiling tile, on floor install new wood underlayment and install v.c.t. tile on vinyl planks, comply with nov 202288717Details
install new drywall on ceiling put compound primer and paint, also ceiling tile, on floor install new wood underlayment and install v.c.t. tile on vinyl planks, comply with nov 202288717 | $50,000 |
| Jan 4, 2017 | Never finaled issued Jan 2017, no final | 317 Leavenworth St | units 101, 102 : work in residential unit #101,102: replace damaged drwall of area 3'x4' at each unit due to water leaking at sink. all new sheetrock to be replaced and reinstalled shall be 5/8" type x gyp. board. drywall only.Details
units 101, 102 : work in residential unit #101,102: replace damaged drwall of area 3'x4' at each unit due to water leaking at sink. all new sheetrock to be replaced and reinstalled shall be 5/8" type x gyp. board. drywall only. | $450 |
| Aug 25, 2016 | Never finaled issued Aug 2016, no final | 317 Leavenworth St | next to sink, replace tiles, install harddle backer, install wall tile, put grout and sealer. maximum 50 ft. to repair tile due to water damage. repair/maintenance only no plans or da checklist required.Details
next to sink, replace tiles, install harddle backer, install wall tile, put grout and sealer. maximum 50 ft. to repair tile due to water damage. repair/maintenance only no plans or da checklist required. | $900 |