Destny68 Construction
- Based in
- Discovery Bay
- On San Francisco permits
- Feb 2020 to Aug 2025
- Last 24 months
- 1 permit filed
4 permits since 2000: 3 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 26, 2025 | In progress issued Feb 2026 | 781 20th Av | 2nd fl: combine e sunroom with bedroom to master bedroom with full bathroom and walk in closet. convert e bedroom to master bedroom with full bath and closet. convert e utility to new full bath. convert e kitchen and breakfast nook to media room, storage, laundry. convert e powder rm to laundry.Details
2nd fl: combine e sunroom with bedroom to master bedroom with full bathroom and walk in closet. convert e bedroom to master bedroom with full bath and closet. convert e utility to new full bath. convert e kitchen and breakfast nook to media room, storage, laundry. convert e powder rm to laundry. | $150,000 |
| Jul 19, 2023 | Completed final sign-off Sep 2026 | 1719 Wallace Av | to comply with nov20309156 to legalize (e) as-built restroom and mezzaninestorage. proposed cannbis grow operation on street level per plan. legalize removal of skylights.Details
to comply with nov20309156 to legalize (e) as-built restroom and mezzaninestorage. proposed cannbis grow operation on street level per plan. legalize removal of skylights. | $15,000 |
| Mar 10, 2020 | Completed final sign-off Jan 2022 | 219 Clayton St | reroofing.Details
reroofing. | $11,500 |
| Feb 10, 2020 | Completed final sign-off Jan 2022 | 219 Clayton St | kitchen and bathroom remodel in each of 3 unitsDetails
kitchen and bathroom remodel in each of 3 units | $40,000 |