Desert Fire Protection Inc Of Nevada
- Based in
- Richmond
- On San Francisco permits
- Nov 2014 to Apr 2019
- Last 24 months
- 0 permits filed
18 permits since 2000: 12 completed, 5 never finaled, 1 expired or cancelled.
Of the 5 never-finaled permits, 3 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 19, 2019 | Never finaled issued Apr 2019, no final | 633 08th St | ti to install sprinkler system add 1 each upright, add 1 each pendent & relocate 1 each uprigh sprinkler ref pa 2018-0911-9791Details
ti to install sprinkler system add 1 each upright, add 1 each pendent & relocate 1 each uprigh sprinkler ref pa 2018-0911-9791 | $2,000 |
| May 18, 2018 | Completed final sign-off Aug 2018 | 855 Brannan St | fire sprinkler ti to b3 space only - adding 12ea pendent sprinkler flexible drops. permit #201710161348. maher naDetails
fire sprinkler ti to b3 space only - adding 12ea pendent sprinkler flexible drops. permit #201710161348. maher na | $5,500 |
| Apr 16, 2018 | Completed final sign-off Aug 2018 | 855 Brannan St | ti to sprinkler system in unit b2 - add 10 each sprinkler heads on flexible drops. ref pa 2017-0907-7298Details
ti to sprinkler system in unit b2 - add 10 each sprinkler heads on flexible drops. ref pa 2017-0907-7298 | $5,500 |
| Mar 28, 2018 | Never finaled issued Mar 2018, no final | 855 Brannan St | tenant improvement of the bi space adding 13 each pendent sprinkler heads on flexible drops. bldg permit #201711214577Details
tenant improvement of the bi space adding 13 each pendent sprinkler heads on flexible drops. bldg permit #201711214577 | $3,900 |
| Jan 16, 2018 | Completed final sign-off Jan 2018 | 855 Brannan St | add 9 sprinkler heads for added walls for vacant space preparation of retail units a1, b1 into 4 spaces, a1, a2, b1, b2Details
add 9 sprinkler heads for added walls for vacant space preparation of retail units a1, b1 into 4 spaces, a1, a2, b1, b2 | $2,250 |
| Jan 3, 2018 | Completed final sign-off May 2018 | 510 Townsend St | ti improvement of fire sprinkler system - adding branch lines, arm overs and flex piping for 150 sprinklers to level 6 & 7 only. ref pa 2017-0627-0517. n/a for maher.Details
ti improvement of fire sprinkler system - adding branch lines, arm overs and flex piping for 150 sprinklers to level 6 & 7 only. ref pa 2017-0627-0517. n/a for maher. | $37,500 |
| Jan 3, 2018 | Completed final sign-off May 2018 | 510 Townsend St | 5th fl ti improvement of fire sprinkler system - adding branch lines, arm overs and flex piping for 200 sprinklers. ref pa 2017-0803-3842. n/a for maher.Details
5th fl ti improvement of fire sprinkler system - adding branch lines, arm overs and flex piping for 200 sprinklers. ref pa 2017-0803-3842. n/a for maher. | $50,000 |
| Sep 6, 2017 | Completed final sign-off May 2018 | 510 Townsend St | ti to fire sprinkler system. adding branchlines, armovers, flex piping & 204 sprinkler heads to level 3. ref arch permit #201708083474. maher naDetails
ti to fire sprinkler system. adding branchlines, armovers, flex piping & 204 sprinkler heads to level 3. ref arch permit #201708083474. maher na | $51,000 |
| Sep 6, 2017 | Completed final sign-off May 2018 | 510 Townsend St | ti to fire sprinkler system. adding branchlines, armovers, flex pipe & 211 sprinkler heads to level 4. ref arch permit #201708033839. maher naDetails
ti to fire sprinkler system. adding branchlines, armovers, flex pipe & 211 sprinkler heads to level 4. ref arch permit #201708033839. maher na | $52,750 |
| Jul 18, 2017 | Never finaled issued Jul 2017, no final | 510 Townsend St | 2nd fl: ti to fire sprinkler system - adding branchlines, armovers, flex piping & 199 sprinkler heads to level 2. ref #201705237372. maher naDetails
2nd fl: ti to fire sprinkler system - adding branchlines, armovers, flex piping & 199 sprinkler heads to level 2. ref #201705237372. maher na | $49,750 |
| Jul 18, 2017 | Completed final sign-off May 2018 | 510 Townsend St | 1st fl: ti to fire sprinkler system - adding branchlines, armovers, flex piping & 153 sprinkler heads to level 1. ref #201703292700. maher naDetails
1st fl: ti to fire sprinkler system - adding branchlines, armovers, flex piping & 153 sprinkler heads to level 1. ref #201703292700. maher na | $38,250 |
| Jan 17, 2017 | Completed final sign-off Oct 2018 | 801 Brannan St | 6th level - add modifications to sprinkler system because of venting the attic space which caused the system be calculated for flow of 8 residential sprinklers instead of 4 per nfpa 13 requirments, reinstalling 6 level system. maher naDetails
6th level - add modifications to sprinkler system because of venting the attic space which caused the system be calculated for flow of 8 residential sprinklers instead of 4 per nfpa 13 requirments, reinstalling 6 level system. maher na | $180,000 |
| Mar 31, 2016 | Completed final sign-off May 2016 | 151 03rd St | as built fire sprinklers for permit 201510280974. bracing calcs done & new calcs for wood ceiling & ws heads both sides of wall.Details
as built fire sprinklers for permit 201510280974. bracing calcs done & new calcs for wood ceiling & ws heads both sides of wall. | |
| Mar 17, 2016 | Never finaled issued Mar 2016, no final | 151 03rd St | relocate 12 fire sprinkler heads, 4th floor ref pa 2015-1214-5083. maher naDetails
relocate 12 fire sprinkler heads, 4th floor ref pa 2015-1214-5083. maher na | $7,000 |
| Oct 28, 2015 | Completed final sign-off May 2016 | 151 03rd St | 1st floor: modify (e) fire sprinkler system- adding 91 heads- using flex heads and 8 ws heads on interior window- bracing and calculations under separate permit.Details
1st floor: modify (e) fire sprinkler system- adding 91 heads- using flex heads and 8 ws heads on interior window- bracing and calculations under separate permit. | $15,200 |
| May 28, 2015 | Expired or cancelled withdrawn Sep 2015 | 45 Lansing St | t.i. to level 1 north, 2 each residential units and package room to be modified into 1 central temporary leasing office. modify sprinkler to accomodate new layout. rrevious head count 19 sprinklers/ t.i. head count 16 sprinklers.Details
t.i. to level 1 north, 2 each residential units and package room to be modified into 1 central temporary leasing office. modify sprinkler to accomodate new layout. rrevious head count 19 sprinklers/ t.i. head count 16 sprinklers. | $6,000 |
| Feb 13, 2015 | Never finaled issued Mar 2015, no final | 45 Lansing St | sprinklers revision adding flex head piping sheet fp21 trash chute details. for entire bldg. t.i. #201009140800 (s6)Details
sprinklers revision adding flex head piping sheet fp21 trash chute details. for entire bldg. t.i. #201009140800 (s6) | $5,000 |
| Nov 14, 2014 | Completed final sign-off Nov 2015 | 398 Eddy St | on 1st floor - provide fire sprinkler for t.i. permit 2014.0602.7250. maher n/a.Details
on 1st floor - provide fire sprinkler for t.i. permit 2014.0602.7250. maher n/a. | $31,000 |