Deo Construction Inc
- Based in
- National City
- On San Francisco permits
- Nov 2016 to Dec 2019
- Last 24 months
- 0 permits filed
17 permits since 2000: 13 completed, 4 never finaled.
Of the 4 never-finaled permits, 4 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 5, 2019 | Completed final sign-off Jan 2021 | 148 Cervantes Bl | front exterior stucco repair. interior remodel: replace garage beam, remodel ground floor bath and new first floor half bath. remodel kitchen. relocate gas meter. infill lightwell at 3rd flr. voluntary seismic strenghthening.Details
front exterior stucco repair. interior remodel: replace garage beam, remodel ground floor bath and new first floor half bath. remodel kitchen. relocate gas meter. infill lightwell at 3rd flr. voluntary seismic strenghthening. | $88,000 |
| Sep 16, 2019 | Completed final sign-off Dec 2020 | 148 Cervantes Bl | hallway and master bathroom remodel (not changing layout), new roof, water heater, furnace & ac. upgrade electrical service from 150 to 200amp.Details
hallway and master bathroom remodel (not changing layout), new roof, water heater, furnace & ac. upgrade electrical service from 150 to 200amp. | $90,000 |
| Aug 19, 2019 | Completed final sign-off Oct 2019 | 3748 Divisadero St | new tiles on the deckDetails
new tiles on the deck | $10,000 |
| Jul 15, 2019 | Completed final sign-off Oct 2019 | 3748 Divisadero St | new stucco at front façade. all decorative trim and elements to remain. no other work under this permit.Details
new stucco at front façade. all decorative trim and elements to remain. no other work under this permit. | $50,000 |
| Jun 10, 2019 | Completed final sign-off Sep 2019 | 152 Cervantes Bl | rev to pa 201905070022. garage beam reviewDetails
rev to pa 201905070022. garage beam review | |
| May 7, 2019 | Completed final sign-off Sep 2019 | 152 Cervantes Bl | replace garage beam and new footing all interior work n/a maherDetails
replace garage beam and new footing all interior work n/a maher | $20,000 |
| Mar 25, 2019 | Completed final sign-off Jun 2019 | 152 Cervantes Bl | reroofing. tear off (e) and place new.Details
reroofing. tear off (e) and place new. | $60,000 |
| Feb 15, 2019 | Completed final sign-off Aug 2019 | 1980 Vallejo St | unit 1. remodel kitchen and bath. replace 1 windows, keeping same size and material on. replacing living-dining window and bath windows.Details
unit 1. remodel kitchen and bath. replace 1 windows, keeping same size and material on. replacing living-dining window and bath windows. | $60,000 |
| Feb 11, 2019 | Completed final sign-off Oct 2019 | 152 Cervantes Bl | remodel master bathroom, no change to layouts. no structural work.Details
remodel master bathroom, no change to layouts. no structural work. | $30,000 |
| Jan 14, 2019 | Completed final sign-off May 2019 | 473 Douglass St | kitchen remodel, no walls to be removed.Details
kitchen remodel, no walls to be removed. | $45,000 |
| Feb 7, 2018 | Completed final sign-off Dec 2018 | 2170 Jackson St | unit 4: kitchen & laundry room remodel, no walls to be removed, demo half bathDetails
unit 4: kitchen & laundry room remodel, no walls to be removed, demo half bath | $125,000 |
| Sep 6, 2017 | Never finaled issued Sep 2017, no final | 172 Burlwood Dr | removel bathroom: new plumbing, new bathroom fixtures and prelace lighting fixtures. 200a service panel upgrade.Details
removel bathroom: new plumbing, new bathroom fixtures and prelace lighting fixtures. 200a service panel upgrade. | $30,000 |
| Aug 4, 2017 | Never finaled issued Aug 2017, no final | 2872 Green St | repair (e) deck, replace tile at rear of house, 2/f, due to dryrot, less than 50%Details
repair (e) deck, replace tile at rear of house, 2/f, due to dryrot, less than 50% | $10,000 |
| Apr 20, 2017 | Completed final sign-off Apr 2018 | 72 Richland Av | kitchen remodeling in same location, no exterior work.Details
kitchen remodeling in same location, no exterior work. | $46,000 |
| Apr 5, 2017 | Never finaled issued Apr 2017, no final | 55 Rosewood Dr | remove & replace (e) bathtub, toilet and vanity. remove tile and drywall from standing shower and install new. remove tile around tub and install drywall. remove and replace flooring tile. remove and replace (relocate) light fixtures.Details
remove & replace (e) bathtub, toilet and vanity. remove tile and drywall from standing shower and install new. remove tile around tub and install drywall. remove and replace flooring tile. remove and replace (relocate) light fixtures. | $12,000 |
| Apr 5, 2017 | Completed final sign-off Jun 2019 | 1973 Clay St | remove (e) bathtub, toilet and vanity and replace with new ones. remove and replace floor tile. relocate light fixtures, convert standing shower to a stacked laundry room (removing tile flooring and from shower walls and install drywall on walls and tile on floor) and relocate plumbingDetails
remove (e) bathtub, toilet and vanity and replace with new ones. remove and replace floor tile. relocate light fixtures, convert standing shower to a stacked laundry room (removing tile flooring and from shower walls and install drywall on walls and tile on floor) and relocate plumbing | $8,000 |
| Nov 28, 2016 | Never finaled issued Nov 2016, no final | 35 Dolores St | bathroom remodel. remove (e) tub; install new shower pan, rough plumbing on 2nd shower head. remove single vanity.add additional plumbing for double vainty. remove pocket door,add add'l recessed light above shower.remove over the mirrow light and add 2 sconce, repair/patch drywall and paint.Details
bathroom remodel. remove (e) tub; install new shower pan, rough plumbing on 2nd shower head. remove single vanity.add additional plumbing for double vainty. remove pocket door,add add'l recessed light above shower.remove over the mirrow light and add 2 sconce, repair/patch drywall and paint. | $12,000 |