De Teng Liu
- Based in
- San Francisco
- On San Francisco permits
- Aug 2008 to Nov 2021
- Last 24 months
- 0 permits filed
7 permits since 2000: 7 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 30, 2021 | Completed final sign-off Sep 2024 | 105 Flood Av | convert existing detached garage into a new adu.Details
convert existing detached garage into a new adu. | $10,000 |
| Apr 5, 2016 | Completed final sign-off Jun 2016 | 441 35th Av | remodeling kitchen, take out old cabinet, add outlet, at counters, at two kitchens.Details
remodeling kitchen, take out old cabinet, add outlet, at counters, at two kitchens. | $22,500 |
| Apr 13, 2015 | Completed final sign-off Jul 2015 | 963 Lombard St | to remodel bathroom, no walls to be moved/no structuralDetails
to remodel bathroom, no walls to be moved/no structural | $7,000 |
| Mar 23, 2015 | Completed final sign-off May 2015 | 452 Marietta Dr | add 1 bedroom and 1 full bathroom on (e) ground flr per planDetails
add 1 bedroom and 1 full bathroom on (e) ground flr per plan | $22,000 |
| May 27, 2014 | Completed final sign-off Jun 2014 | 268 Ralston St | take out siding. put 1/2" plywood. put chicken wires and stucco. visible to street. repair in kind.Details
take out siding. put 1/2" plywood. put chicken wires and stucco. visible to street. repair in kind. | $3,500 |
| May 21, 2014 | Completed final sign-off Sep 2014 | 1727 25th Av | to add 2 bedrooms, 1 full bathroom & laundry on existing ground floor per plan.Details
to add 2 bedrooms, 1 full bathroom & laundry on existing ground floor per plan. | $40,000 |
| Aug 28, 2008 | Completed final sign-off Nov 2008 | 1219 12th Av | bathroom remodeling on 2nd floor. change layout.Details
bathroom remodeling on 2nd floor. change layout. | $4,500 |