De Mattei Construction Inc
- Based in
- San Jose
- On San Francisco permits
- Mar 2007 to May 2019
- Last 24 months
- 0 permits filed
6 permits since 2000: 6 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 15, 2019 | Completed final sign-off Jul 2019 | 999 Green St | unit 3201 - install prefabricated pneumatic residential elevator adjacent to an existing stairwell in a single residential unit in an (e) 33 story multi unit family residential building.Details
unit 3201 - install prefabricated pneumatic residential elevator adjacent to an existing stairwell in a single residential unit in an (e) 33 story multi unit family residential building. | $120,000 |
| Jul 3, 2017 | Completed final sign-off Aug 2017 | 3193 Pacific Av | replace three existing sashes for insulated units. wood construction. one casement window at bottom with awning sash above. two fixed windows at bottom with awning sash above.Details
replace three existing sashes for insulated units. wood construction. one casement window at bottom with awning sash above. two fixed windows at bottom with awning sash above. | $3,000 |
| Jun 30, 2017 | Completed final sign-off Nov 2017 | 3193 Pacific Av | int alterations-facelift-refinish (e) powder bath, master bath remodel, (2) new pocket doors, replace kitchen cabinets, lighting adds & changes, replace plbg fixtures, steam shower, patio restore, stucco, pedestal paving, plaster, drywall, hardwd flr. replace int doors, upgrade insulation,cabinetryDetails
int alterations-facelift-refinish (e) powder bath, master bath remodel, (2) new pocket doors, replace kitchen cabinets, lighting adds & changes, replace plbg fixtures, steam shower, patio restore, stucco, pedestal paving, plaster, drywall, hardwd flr. replace int doors, upgrade insulation,cabinetry | $250,000 |
| May 3, 2017 | Completed final sign-off Nov 2017 | 3193 Pacific Av | refurbish 2 bathrooms, replace interior doors, replace casework, lighting & plumbing fixtures. maher naDetails
refurbish 2 bathrooms, replace interior doors, replace casework, lighting & plumbing fixtures. maher na | $7,000 |
| Jul 31, 2012 | Completed final sign-off Apr 2014 | 1629 Green St | front structure -revision to appl #2011.0607.7567s1 : all basement walls to be concrete, reduce mat slab thickness, modify shear wall at basement.Details
front structure -revision to appl #2011.0607.7567s1 : all basement walls to be concrete, reduce mat slab thickness, modify shear wall at basement. | |
| Mar 6, 2007 | Completed final sign-off Jun 2007 | 101 Lombard St | interior tenant remodel of non-sttructural, non rated walls for kitchen and bath remodel work in unit 404eDetails
interior tenant remodel of non-sttructural, non rated walls for kitchen and bath remodel work in unit 404e | $270,000 |