Permit GraphShortlistSan Francisco building permits since 2000

Dba American Array Solar Electric

Contractor license
993467
State license record
Based in
Livermore
On San Francisco permits
Jul 2022 to May 2026
Last 24 months
4 permits filed

7 permits since 2000: 3 completed, 4 in progress.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Most recent permits

All
FiledOutcomeAddressWork described on the permitDeclared cost
May 1, 2026Completed
final sign-off Jul 2026
4316 23rd Stre-roofing: remove and replace roofing material / existing roofing material (in-kind)
Details
Permit
202605010531
Status
complete
Filed
May 1, 2026
Permit issued
May 1, 2026
Final sign-off
Jul 2, 2026
Declared cost
$8,500
Address
4316 23rd St

re-roofing: remove and replace roofing material / existing roofing material (in-kind)

Open the permit page

$8,500
Sep 12, 2025In progress
issued Dec 2025
1953 O'farrell Stsolar permit: installing 10 solar pv modules, 440 watts per module, total no. of rating 4.4 kw. mounted: roof, ballasted: n, including 1 energy storage unit, of 240vac, with 13.50 kwh each in capacity, ess units will be closer than 3 feet | roof mounted photovoltaic
Details
Permit
S20250910039
Status
issued
Filed
Sep 12, 2025
Permit issued
Dec 22, 2025
Address
1953 O'farrell St

solar permit: installing 10 solar pv modules, 440 watts per module, total no. of rating 4.4 kw. mounted: roof, ballasted: n, including 1 energy storage unit, of 240vac, with 13.50 kwh each in capacity, ess units will be closer than 3 feet | roof mounted photovoltaic

Open the permit page

Sep 10, 2025In progress
filed Sep 2025, not yet issued
1953 O'farrell Stsolar permit: installing 10 solar pv modules, 440 watts per module, total no. of rating 4.4 kw. mounted: roof, ballasted: n, including 1 energy storage unit, of 600 vac, with 13.50 kwh each in capacity, ess units will not be closer than 3 feet | roof mounted photovolt
Details
Permit
S20250910038
Status
triage
Filed
Sep 10, 2025
Declared cost
$18,000
Address
1953 O'farrell St

solar permit: installing 10 solar pv modules, 440 watts per module, total no. of rating 4.4 kw. mounted: roof, ballasted: n, including 1 energy storage unit, of 600 vac, with 13.50 kwh each in capacity, ess units will not be closer than 3 feet | roof mounted photovolt

Open the permit page

$18,000
Mar 27, 2025Completed
final sign-off Apr 2025
66 Crane Stre-roofing: remove and replace roofing material / existing roofing material (in-kind)
Details
Permit
202503273248
Status
complete
Filed
Mar 27, 2025
Permit issued
Mar 27, 2025
Final sign-off
Apr 11, 2025
Declared cost
$8,500
Address
66 Crane St

re-roofing: remove and replace roofing material / existing roofing material (in-kind)

Open the permit page

$8,500
Jan 5, 2024In progress
issued Apr 2024
1530 45th Avinstallation of new 5 encharge iq 5p batteries (25kwh), heat alarms, enphase controller 3 and backup load panel.
Details
Permit
202401053550
Status
issued
Filed
Jan 5, 2024
Permit issued
Apr 12, 2024
Declared cost
$12,000
Address
1530 45th Av

installation of new 5 encharge iq 5p batteries (25kwh), heat alarms, enphase controller 3 and backup load panel.

Open the permit page

$12,000
Oct 16, 2023In progress
issued Apr 2024
584 Dewey Blinstallation of 2 tesla powerwall 2 batteries.
Details
Permit
202310168683
Status
issued
Filed
Oct 16, 2023
Permit issued
Apr 23, 2024
Declared cost
$20,000
Address
584 Dewey Bl

installation of 2 tesla powerwall 2 batteries.

Open the permit page

$20,000
Jul 13, 2022Completed
final sign-off Aug 2022
25 Roscoe Stre-roofing: remove and replace roofing material / existing roofing material (in-kind)
Details
Permit
202207138426
Status
complete
Filed
Jul 13, 2022
Permit issued
Jul 13, 2022
Final sign-off
Aug 16, 2022
Declared cost
$10,000
Address
25 Roscoe St

re-roofing: remove and replace roofing material / existing roofing material (in-kind)

Open the permit page

$10,000