Db General Construction
- Based in
- Antioch
- On San Francisco permits
- Apr 2025 to Sep 2025
- Last 24 months
- 2 permits filed
2 permits since 2000: 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 5, 2025 | In progress issued Sep 2025 | 6 Elsie St | install 4 skylights, remove dropped celiing at living room , remove fireplace, remove 4 windows on north elevation and repalce with 3 new windows. not visible from street.Details
install 4 skylights, remove dropped celiing at living room , remove fireplace, remove 4 windows on north elevation and repalce with 3 new windows. not visible from street. | $43,000 |
| Apr 28, 2025 | In progress filed Apr 2025, not yet issued | 1399 Plymouth Av | to comply with nov 202310516 repair storm water piping that is defective. repair defective drainage piping. repair defective water pipingDetails
to comply with nov 202310516 repair storm water piping that is defective. repair defective drainage piping. repair defective water piping | $19,500 |