David Wang
- Based in
- San Francisco
- On San Francisco permits
- Jun 2011 to Aug 2013
- Last 24 months
- 0 permits filed
8 permits since 2000: 7 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 8, 2013 | Completed final sign-off Nov 2014 | 2471 35th Av | revisinto 201305308200. reroute existing heating ducts. add toilet to 2nd flDetails
revisinto 201305308200. reroute existing heating ducts. add toilet to 2nd fl | $2,500 |
| May 30, 2013 | Completed final sign-off May 2014 | 2471 35th Av | legalizing extg accessory rooms, upgrade electrical, remodel bathrooms.Details
legalizing extg accessory rooms, upgrade electrical, remodel bathrooms. | $25,000 |
| Feb 19, 2013 | Completed final sign-off Apr 2013 | 2451 27th Av | convert existing storage room to 2 bedrooms, mud room, 1 bathroom on gr floor per planDetails
convert existing storage room to 2 bedrooms, mud room, 1 bathroom on gr floor per plan | $40,000 |
| Jul 31, 2012 | Completed final sign-off Oct 2012 | 1831 39th Av | remodel 2nd floor bathroom, add powder room. upgrade electrical panel & replace all (e) wiring in 1st & 2nd floor.Details
remodel 2nd floor bathroom, add powder room. upgrade electrical panel & replace all (e) wiring in 1st & 2nd floor. | $15,000 |
| Jul 13, 2012 | Completed final sign-off Oct 2012 | 678 45th Av | ground fl: remodel bathrm, enlarge living rm, upgrade windows to double pane. first flr: remodel kitchen, bath, add one bath, upgrade windows to double pane. remove non-bearing walls. backyard install trench drain.Details
ground fl: remodel bathrm, enlarge living rm, upgrade windows to double pane. first flr: remodel kitchen, bath, add one bath, upgrade windows to double pane. remove non-bearing walls. backyard install trench drain. | $60,000 |
| Nov 16, 2011 | Expired or cancelled expired Oct 2014 | 940 Jackson St | install wall tile and floor tile at the front entrance and lobby area. not visible from streetDetails
install wall tile and floor tile at the front entrance and lobby area. not visible from street | $2,500 |
| Nov 9, 2011 | Completed final sign-off Jul 2012 | 940 Jackson St | remodel basement bathroom and paint all walls in the storage room. to comply with complaint #201146628.Details
remodel basement bathroom and paint all walls in the storage room. to comply with complaint #201146628. | $7,000 |
| Jun 28, 2011 | Completed final sign-off Aug 2012 | 940 Jackson St | replace rusted tub at unit #2, repair leaking above unit #1 ceiling and replace rusted tub, remove crack floor and wall tiles, replace existing electrical outlet at bathroom, paint over exposed wall surface, scaffold at the back of the apt,install missing window trims & painting, no structural workDetails
replace rusted tub at unit #2, repair leaking above unit #1 ceiling and replace rusted tub, remove crack floor and wall tiles, replace existing electrical outlet at bathroom, paint over exposed wall surface, scaffold at the back of the apt,install missing window trims & painting, no structural work | $4,000 |