David Star Construction Inc
- Based in
- Encino
- On San Francisco permits
- Dec 2025 to Apr 2026
- Last 24 months
- 3 permits filed
3 permits since 2000: 3 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 24, 2026 | Completed final sign-off Jun 2026 | 167 Clipper St | replace 2100 sq ft of dry wall. lath/plaster to 5/8 dry wall. demo (e) and install new 5/8 dry wall hallway entrance, two bedrooms to the right and living room.Details
replace 2100 sq ft of dry wall. lath/plaster to 5/8 dry wall. demo (e) and install new 5/8 dry wall hallway entrance, two bedrooms to the right and living room. | $6,000 |
| Jan 16, 2026 | Completed final sign-off Jun 2026 | 167 Clipper St | replace 17 windows vinyl retrofit, 5 street facing.Details
replace 17 windows vinyl retrofit, 5 street facing. | $15,000 |
| Dec 5, 2025 | Completed final sign-off Jun 2026 | 167 Clipper St | bathroom remodel. replace tub to shower. update mep as needed per code. replace vanity sink, toilet, fan.Details
bathroom remodel. replace tub to shower. update mep as needed per code. replace vanity sink, toilet, fan. | $15,000 |