David Ramirez
- Based in
- San Francisco
- On San Francisco permits
- Dec 2008 to Mar 2025
- Last 24 months
- 1 permit filed
21 permits since 2000: 20 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 7, 2025 | Completed final sign-off Jul 2025 | 365 30th St | bath remodel in kind- new tile, new plumbing fixtures, shower pan. replace damaged sheetrock from water intrusion in living/dining room - replacement gypbd to be 5/8" type x w/ 5d cooler nails @ 4" o.c. or equivlent screws. no change to floor layout. no change to wall layout. no structural work.Details
bath remodel in kind- new tile, new plumbing fixtures, shower pan. replace damaged sheetrock from water intrusion in living/dining room - replacement gypbd to be 5/8" type x w/ 5d cooler nails @ 4" o.c. or equivlent screws. no change to floor layout. no change to wall layout. no structural work. | $30,000 |
| Jun 26, 2023 | Completed final sign-off Jun 2024 | 65 Hartford St | replace kitchen cabinets, new tile, new plmbing fiutres, new undercounter lights, new countertop. no exterior work: under this permit: no structural work- no wall/ framing modificationsDetails
replace kitchen cabinets, new tile, new plmbing fiutres, new undercounter lights, new countertop. no exterior work: under this permit: no structural work- no wall/ framing modifications | $75,000 |
| Jun 21, 2022 | Completed final sign-off Sep 2022 | 365 30th St | replace kitchen cabinetry, new plumbing fixtures, new lighting, tiled back splash, hardwood floors.Details
replace kitchen cabinetry, new plumbing fixtures, new lighting, tiled back splash, hardwood floors. | $50,000 |
| Mar 22, 2022 | Completed final sign-off Aug 2022 | 731 Douglass St | bath remodel - new tile, vanity, plumbing fixtures, shower pan. kitchenete- new cabinets, countertop.Details
bath remodel - new tile, vanity, plumbing fixtures, shower pan. kitchenete- new cabinets, countertop. | $35,000 |
| Jan 19, 2022 | Completed final sign-off Aug 2022 | 65 Hartford St | 1/2 bathroom remodel. new tile. new vanity. new toilet. new lighting. located on 1st floor, approx. 30sf.Details
1/2 bathroom remodel. new tile. new vanity. new toilet. new lighting. located on 1st floor, approx. 30sf. | $20,000 |
| Apr 8, 2021 | Completed final sign-off Oct 2021 | 331 Connecticut St | kitchen remodel - new cabinets, new countertop, sink, faucet, appliances, lighting.Details
kitchen remodel - new cabinets, new countertop, sink, faucet, appliances, lighting. | $50,000 |
| Mar 16, 2020 | Never finaled issued Mar 2020, no final | 695 Monterey Bl | replace kitchen cabinets. new range, new sink and faucet. remodel bath, new tiles, new vanity, new plumbing fixtures, new lighting, new shower panDetails
replace kitchen cabinets. new range, new sink and faucet. remodel bath, new tiles, new vanity, new plumbing fixtures, new lighting, new shower pan | $30,000 |
| Aug 19, 2019 | Completed final sign-off Dec 2019 | 3961 26th St | remodel 2 bathroom- new vanities,m new shower new tub, new tile work, 2 new toilets, no walls moved, 2 bathroom fans, new sconces, new plumbing fixtures.Details
remodel 2 bathroom- new vanities,m new shower new tub, new tile work, 2 new toilets, no walls moved, 2 bathroom fans, new sconces, new plumbing fixtures. | $35,000 |
| May 21, 2019 | Completed final sign-off Aug 2019 | 331 Connecticut St | remodel 1 bathroom: no walls moved/modified. new tub/shower, vnaity, plumbing fixtures; sconces, tile.Details
remodel 1 bathroom: no walls moved/modified. new tub/shower, vnaity, plumbing fixtures; sconces, tile. | $25,000 |
| Apr 15, 2019 | Completed final sign-off Aug 2019 | 1548 12th Av | remodel bath incl new shower, new tub, new vainity, tile. no walls moved.Details
remodel bath incl new shower, new tub, new vainity, tile. no walls moved. | $30,000 |
| Jan 31, 2019 | Completed final sign-off Jun 2019 | 598 28th St | convert (e) non-habitable space in lower floor to 510sq of conditioned space with bathroom.Details
convert (e) non-habitable space in lower floor to 510sq of conditioned space with bathroom. | $75,000 |
| Oct 31, 2018 | Completed final sign-off Mar 2020 | 161 Hartford St | infill lightwell @ ground fl. enlarge storage at ground floor with fire rated wallDetails
infill lightwell @ ground fl. enlarge storage at ground floor with fire rated wall | $150,000 |
| Aug 1, 2018 | Completed final sign-off Sep 2018 | 65 Hartford St | to obtain final inspection for work approved under pa# 200007256072, 200409214753, 201607182567. all work is completedDetails
to obtain final inspection for work approved under pa# 200007256072, 200409214753, 201607182567. all work is completed | |
| Jun 27, 2018 | Completed final sign-off Jan 2019 | 598 28th St | remove (e) walls at kitchen are for kitchen remodel. remove (e) elevator & replace w/(n) stairs from upper to lower floor. remodel (e) bathrooms at upper floor.Details
remove (e) walls at kitchen are for kitchen remodel. remove (e) elevator & replace w/(n) stairs from upper to lower floor. remodel (e) bathrooms at upper floor. | $125,000 |
| Jun 11, 2018 | Completed final sign-off Jul 2018 | 598 28th St | demo kitchen cabinetry and (2) bathrooms. new construction work for kitchen and bathrooms will be under separate permitDetails
demo kitchen cabinetry and (2) bathrooms. new construction work for kitchen and bathrooms will be under separate permit | $4,000 |
| Mar 28, 2018 | Completed final sign-off Jun 2018 | 403 Main St | replace kitchen cabinetry, new sink, new dishwasher, new under counter lights. no walls moved, remove, added or infilled. all existing layouts to remain unchanged. n/a maherDetails
replace kitchen cabinetry, new sink, new dishwasher, new under counter lights. no walls moved, remove, added or infilled. all existing layouts to remain unchanged. n/a maher | $20,000 |
| Aug 23, 2017 | Completed final sign-off Jan 2018 | 1130 Shrader St | replace kitchen cabinetry with new. new under cabinet lights, new plumbing fixtures. new washer/dryer, appliances. replace 2 (e) windows witn 1 (n). not street visible.Details
replace kitchen cabinetry with new. new under cabinet lights, new plumbing fixtures. new washer/dryer, appliances. replace 2 (e) windows witn 1 (n). not street visible. | $40,000 |
| Jul 27, 2017 | Completed final sign-off Oct 2017 | 317 29th St | no structural work - no walls modification - replace kitchen cabinetry with new. new under cab lights. replace bathroom vanity. new tile on bath floor. one new shower pan and tile. new plumbing fixtures. new vanity light. new kitchen lightDetails
no structural work - no walls modification - replace kitchen cabinetry with new. new under cab lights. replace bathroom vanity. new tile on bath floor. one new shower pan and tile. new plumbing fixtures. new vanity light. new kitchen light | $40,000 |
| May 31, 2017 | Completed final sign-off Aug 2017 | 74 Ord St | bathroom remodelDetails
bathroom remodel | $23,000 |
| Mar 23, 2017 | Completed final sign-off Jun 2017 | 695 Monterey Bl | replace kitchen cabinetry with new, new under cabinet lights. replace 2 bathroom vanities. new tile on bathroom floor. 1 new shower pan & tile. new plumbing fixtures. new vanity lights.Details
replace kitchen cabinetry with new, new under cabinet lights. replace 2 bathroom vanities. new tile on bathroom floor. 1 new shower pan & tile. new plumbing fixtures. new vanity lights. | $40,000 |
| Dec 2, 2008 | Completed final sign-off Feb 2009 | 1548 12th Av | replace 21 existing windows. can not be visible from the street.Details
replace 21 existing windows. can not be visible from the street. | $15,000 |