David Peck Construction
- Based in
- Los Gatos
- On San Francisco permits
- Mar 2020 to Nov 2021
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 16, 2021 | Completed final sign-off Sep 2022 | 47 Levant St | revision to pa 2020-0303-5976. small bathroom window shall be eliminated. the remaining window shall be sheathed and strapped around and the closet sheathing may be eliminated. minor plumbing fenestrationDetails
revision to pa 2020-0303-5976. small bathroom window shall be eliminated. the remaining window shall be sheathed and strapped around and the closet sheathing may be eliminated. minor plumbing fenestration | $1,000 |
| Mar 3, 2020 | Completed final sign-off Sep 2022 | 47 Levant St | master bathrom redesign with new windows at the perimeter wall. new perimeter window frame at dining zone on 3rd fl. replace living room (e) sliding door opening with a (n) glass door system.Details
master bathrom redesign with new windows at the perimeter wall. new perimeter window frame at dining zone on 3rd fl. replace living room (e) sliding door opening with a (n) glass door system. | $40,000 |